My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2025/06/04 Council Agenda Packet
>
Council Agenda Packets
>
2025
>
2025/06/04 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/5/2025 8:05:13 AM
Creation date
6/5/2025 7:58:21 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
6/4/2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
330
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Exhibit A (Scope of Work) <br />environmental scientist(s) to delineate the stream and any wetlands and to observe the <br />site for type/classification/ or characterization meeting all agency <br />requirements/methods. Wetlands will be rated per the 2014 rating system. <br /> <br />The Ordinary-High-Watermark (OHWM) of Pigeon Creek 2 will be flagged in the field <br />(and surveyed) in the context of the project on public property (or as right of entry is <br />secured by others on adjacent private property). The survey of located/numbered <br />delineation flags will be used for project related maps and information to identify critical <br />areas for avoidance of impacts. Field findings of the reconnaissance will be described in <br />NEPA documents to the level relevant to define the environmental context for NEPA <br />review. A critical areas technical report will be produced by the consultant to document <br />the methods and findings of delineation/classification and habitat assessment efforts. <br />The study area for the wetland and stream delineation will be 100 feet from the center <br />point of the Pigeon Creek/Olympic Drive crossing. <br /> <br />The consultant will also identify necessary environmental documentation data/materials <br />as part of the <br />background information review and site reconnaissance that may be needed to develop <br />and meet the requirements of the National & State Environmental Policy Act (NEPA). <br />No actual permit or regulatory documentation (NEPA and documentation) will be <br />developed under this task. Information gathered under this task will be placed in Project <br />Files and used in the work items related to document production subtasks. <br /> <br />TASK 4.1 ASSUMPTIONS <br />• The City shall provide rights-of-entry as needed to access Pigeon Creek 2 for <br />delineation. <br />• The area on either side of Pigeon Creek 2 upstream of the existing culvert is not <br />known to be directly accessible without specialized equipment or other means. <br />Climbing equipment and specialized climbing operations for difficult delineation <br />access are not provided by the Consultant. <br />• Field activities are assumed to involve 2 consultant staff for up to 1 days in field <br />plus office time for data assembly and to summarize findings. <br />• Otak will not provide additional exhibits beyond what is shown in the scope <br />document for insertion into permit applications <br />• These exhibits will be based on the City’s advancements of Otak’s 20% design <br />documents <br /> <br />TASK 4.1 DELIVERABLES <br />• Environmental Permitting Plan (e.g., Permitting and Environmental Review <br />Memorandum) listing all permitting & approvals required with a description of the <br />process for completion. <br />• Technical Memorandum (e.g., Wetland and Stream Delineation and Wildlife <br />Habitat Assessment Report) describing the findings of field investigations and <br />baseline environmental conditions.
The URL can be used to link to this page
Your browser does not support the video tag.