My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9001 AIRPORT RD 2024 Plans 2025-07-01
>
Address Records
>
AIRPORT RD
>
9001
>
Plans
>
9001 AIRPORT RD 2024 Plans 2025-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 1:40:21 PM
Creation date
6/5/2025 8:46:31 AM
Metadata
Fields
Template:
Address Document
Street Name
AIRPORT RD
Street Number
9001
Permit
B2411-040
Year
2024
Notes
INSTALL 700SF PRE-MANUFACTURED CARPORT ON EXISTING SLAB
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MANUFACTURED BY: <br /> RV CARPORTS <br /> \�\ ICI III <br /> 1 �\\\ III IIII I <br /> 10 <br /> ENGINEERED BY: <br /> \ III �I Ill i <br /> II <br /> A&A ENGINEERING <br /> ll CIVIL•STRUCTURAL <br /> II <br /> lii II <br /> �i DRAWING INFORMATION <br /> PROJECT: 20 W L <br /> LOCATION:STATE OFWASHINGTON <br /> PROJECT . /7 11-24-16/9 <br /> SHEET TITLE: <br /> OPTIONAL LEAN-TO <br /> ADDITION <br /> SHEET NO.: 10 / 11 <br /> ❑OPTIONAL LEAN-TO AD i0N CHECKED BY: OAA DATE: 1/25/24 <br /> SCALE:NTS LEGAL INFORMATION <br /> -ANY DUPUCATION OF THI5 DRAWING IN WHOLE OR <br /> PART 15 5TRICTLY FORBIDDEN.ANYONE DOING 50 WILL <br /> 6 12"LG.CONNECTOR SLEEVE- DE PR05ECUTED UNDER THE FULL E crENT OF THE LAW. <br /> [2]ROOF BEAM FIELD BOLT TO BOTH TUBES W/ -DRAWNG5 VALID UP TO I YEAR FROM DATE OF ISSUE. <br /> MAIN BUILDING <br /> [23]FASTENERS-SEE TABLE 3.2 SEAL: <br /> FOR NO.OF FASTENERS REQD. P. AB U, T, <br /> LEAN-TO ADDITION �4 O� WAS <br /> w [6]6 LG.CONNECTOR SLEEVE <br /> E FIELD BOLT W/[23]FASTENERS M/N� �;► Z <br /> a E.S.-SEE TABLE 3.2 FOR NO.OF 6° LEAN-TO ADDITION NOTES: <br /> FASTENERS REQD. 1. LEAN-TO ADDITION5 CAN BE ADDED ON E1T OR BOTH SIDES OF <br /> ID <br /> [1]COLUMN POST-FOR EAVE HEIGHTS THE BUILDING. A <br /> Iu GREATER THAN 6-0"INSERT TS 2.25 X <br /> 2.25 X 14GA TUBE INTO COLUMN POST 2. ROOF SLOPE,PURLIN,GIRT AND FRAME SPACING THE ADDITION �� 40277 �w <br /> w HAVE TO MATCH THAT OF THE MAIN STRUCTURE. �GISTER� 1� <br /> u LEAN-TO ATTACHMENT DETAIL 1 3. IF THE LEAN-TO ADDITION IS"OPEN"(BOTH END WALLS 0 IDE WALL L <br /> SCALE:NTS 15 NOT ENCLOSED),THE DESIGN OF THE MAIN 13UILPING HA 0 USE <br /> 'J THE FRAME SPACING OF AN OPEN BUILDING FROM TABLE 4. -09-2024 <br /> STAMP EXPIRY: <br /> DATE SIGNED: 08-26-2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.