AND
<br /> :GRESS ILLUMINATION.THE
<br /> T A/C AIRCONDITIONING 1. REFER TO BASIC BUILDING SPECIFICATIONS,REQUIREMENTS AND STANDARDS FOR EXISTING SHELL AND CORE 28. CONTRACTOR TO PROVIDE SHOP DRAWINGS FOR:HVAC,CARPET SEAMING,ELECTRICAL LAYOUT, DEMOLHALL TIONRNOTESLS/EQUIPMENT TO COMPLETE DEMOLITION AND REMOVAL OF ALL ITEMS . MEANS EGRESSOF ECODE NOTESEANS OF EGRESS(EXIT PATHWAY)AND THE EXIT DISCHARGE
<br /> ACT ACOUSTICALCEILINGTILE CONSTRUCTION.ALL WORK IS TO BE COMPATIBLE WITH EXISTING CONSTRUCTION. LIGHTING,CASEWORK,SLIDING PARTITION,FIRE SPRINKLER LAYOUT,ETC. AS INDICATED. DOOR SHALL BE ILLUMINATED AT ALL TIMES THE BUILDING IS OCCUPIED AT AN ILLUMINATION LEVEL NOT
<br /> A ABOVE FINISH FLOOR
<br /> 1 LESS THAN 1-FOOT CANDLE 10 LUX AT THE WALKING SURFACE LEVEL PER SBC 1006.LIGHTING MUST BE
<br /> AHJ AUTHORITIES HAVING JURISDICTION ( )
<br /> ALT. ALTERNATE 2. CONTRACTOR SHALL KEEP CONSTRUCTION AREA FREE OF DUST AND DEBRIS FOR THE DURATION OF 2. ALL WORK SHALL CONFORM TO APPLICABLE CURRENT FEDERAL STATE AND LOCAL CODES.THE 29. CONTRACTOR TO PROVIDE SUBMITTALS FOR PAINT CONCRETE FLOOR GRINDINGIPOLISHING PLASTIC PROVIDED WITH EMERGENCY BATTERY BACK-UPPER 2015 SEC 1008.3. r
<br /> APPROX. APPROXIMATE CONTRACTOR IS TO PROVIDE FOR ALL REQUIRED NOTIFICATION OF AND COORDINATION WITH CITY AND STATE LAMINATE SAMPLES,DOOR HARDWARE,ISLAND CABINET STEEL SUPPORT BRACKETS,APPLIANCES, CONSTRUCTION.
<br /> Bo BOARD AGENCIES,AND PROVIDE REQUIRED PERMITS.ALL TESTS AND INSPECTIONS ASSOCIATED WITH OBTAINING PLUMBING FIXTURES,LIGHTING&BULBS,HVAC EQUIPMENT,ETC. 2. EGRESS LIGHTING SHALL BE BIDDER DESIGNED BY A LICENSED ELECTRICAL ENGINEER ACCORDING TO V
<br /> BLDG BUILDING APPROVALS TO PROCEED WITH AND COMPLETE THE WORK SHALL BE PAID FOR BY THE CONTRACTOR. 3. IF ANY QUESTIONS ARISE AS TO THE REMOVAL OF ANY MATERIAL,CLARIFY THE POINT IN QUESTION WITH APPLICABLE CODES/ORDINANCES IN JURISDICTION.THE ENGINEER MAY REFERENCE THIS CODE
<br /> BLK BLOCK 30. CLEAN,REPAIR ANY EXISTING PERIMETER WINDOW SHADES AS REQUIRED TO BE IN A FULLY THE ARCHITECT BEFORE PROCEEDING. SUMMARY SHEET.HOWEVER,IT SHALL REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER TO uj
<br /> BLKG BLOCKING 3. THE INTENT OF THE CONTRACT DOCUMENTS IS TO INCLUDE ALL LABOR AND MATERIALS,EQUIPMENT AND FUNCTIONING&OPERATIONAL MANNER. COMPLETE A SCOPE OF WORK ADDRESSING ALL EGRESS LIGHTING I.E.;ROOMS,SPECIALIZED SPACES,
<br /> BOT BOTTOM TRANSPORTATION NECESSARY OR REASONABLY INFERABLE AS BEING NECESSARY FOR THE EXECUTION OF 4. AT COMPLETION OF DEMOLITION WORK,THE CONSTRUCTION AREAS SHALL BE LEFT IN"BROOM CLEAN'
<br /> BIS BUILDING STANDARD () PATHWAYS,ETC.PER THE AFOREMENTIONED CODES.FINAL EGRESS LIGHTING DESIGN SUBJECT TO
<br /> BU BUILT UP THE WORK.BY SUBMITTING A PROPOSAL,THE CONTRACTOR REPRESENTS THAT THOROUGH EXAMINATION OF 31. COORDINATE WITH SUB-CONTRACTORS THE LOCATIONS OF ELECTRICAL,PLUMBING AND OTHER CONDITION.ALL DEBRIS AND MISCELLANEOUS MATERIAL SHALL BE REMOVED. BUILDING OFFICIAL DISCRETION.
<br /> THE SITE AND ALL EXISTING CONDITIONS AND LIMITATIONS HAVE BEEN MADE AND THAT THE CONTRACT DEVICES WITH LAYOUT AND DESIGN OF CUSTOM CASEWORK.
<br /> CAB CABINET DOCUMENTS HAVE BEEN EXAMINED IN COMPLETE DETAIL,AND THAT IT IS DETERMINED BEYOND DOUBT THAT 5. ALL DEBRIS REMOVAL SHALL BE PERFORMED IN ACCORDANCE WITH BUILDING MANAGEMENT 3. EGRESS DOORS WITH CARD READERS SHALL BE FAIL-SAFE TO REMAIN UNLOCKED DURING AN 10
<br /> CLG CEILING THEDRAWINGS,SPECIFICATIONS AND EXISTING CONDITIONS ARE SUFFICIENT,ADEQUATE AND SATISFACTORY 32. CASEWORK SHALL CONFORM TO A.W.I.CURRENT STANDARDS. REQUIREMENTS AND PROCEDURES AND IS THE RESPONSIBILITY OF THE GC TO COORDINATE. EVENT/EMERGENCY PER 2015 SBC 1010.1.1.9. N
<br /> CLR CLEAR(ANCE)
<br /> COL COLUMN FOR CONSTRUCTION OF THE WORK.WHERE MINOR ADJUSTMENTS TO THE WORK ARE NECESSARY FOR THE N
<br /> CONC CONCRETE PURPOSES OF FABRICATION AND INSTALLATION OF ITEMS,OR RESOLUTIONS OF CONFLICTS BETWEEN ITEMS, 33, EGRESS LIGHTING SHALL BE BIDDER DESIGNED BY A LICENSED ELECTRICAL ENGINEER BASED ON FINAL 6. AS DIRECTED BY BUILDING MANAGEMENT,ALL DOORS,FRAMES,HARDWARE,MECHANICAL ITEMS, 4, NON-EGRESS DOOR WITH CARD READERS SHALL BE FAIL SECURE TO REMAIN LOCKED DURING AN
<br /> CONS CONSTRUCTION WITHIN THE INTENT OF THE CONTRACT DOCUMENTS,THE CONTRACTOR SHALL MAKE SUCH ADJUSTMENTS AT FLOOR PLAN(S)AND THE MOST CURRENT(IN FORCE)ISSUE OF THE IBC,IEC AND LOCAL PLUMBING FIXTURES,LIGHT FIXTURES(INCLUDING DOWNUGHTS AND FLUORESCENTS),AND SPECIAL EVENT/EMERGENCY.DOOR CAN STILL BE OPENED WITH A KEY DURING SUCH EVENTIEMERGENCY.
<br /> CONT CONTINUOUS (n
<br /> CORK CORRIDOR NO ADDED EXPENSE TO THE OWNER.WHERE SUCH MINOR ADJUSTMENTS AFFECT FUNCTIONAL OR CODESIORDINANCES.THE ENGINEER MAY USE THE ARCHITECTS EGRESS MAPS(COMMON PATH OF EQUIPMENT SHOWN TO BE REMOVED,SHALL BE CLEAN AND FREE OF DEFECTS,PROTECTED,SAVED AND
<br /> CPT CARPET AESTHETIC DESIGN OF THE WORK,THEY SHALL BE SUBMITTED TO THE ARCHITECT FOR REVIEW AND TRAVEL/EXIT TRAVEL DISTANCE)AS STARTING POINT FOR A BASIS OF DESIGN.HOWEVER,IT SHALL REUSED AS DIRECTED HEREIN,OR RETURNED TO BUILDING STOCK. S. FIRE EXTINGUISHERS MUST BE WITHIN A75'MA%IMUM TRAVEL DISTANCE OF ANY LOCATION. W
<br /> CT CERAMICTILE APPROVAL. REMAIN THE SOLE RESPONSIBILITY OF THE ENGINEER TO COMPLETE A SCOPE OF WORK THAT Z V
<br /> CTR CENTER ADDRESSES ALL EGRESS LIGHTING I.E.;ROOMS,SPECIALIZED SPACES,PATHWAYS,ETC.PER THE 7. IN PARTITIONS TO BE REMOVED,REMOVE AND CAP ALL OUTLETS,SWITCHES,WIRES,THERMOSTATS,ETC., N Q
<br /> DEMO DEMOLITION4. THE CONTRACTOR SHALL COORDINATE ALL OPERATIONS WITH THE OWNER,INCLUDING AREA FOR WORK, AFOREMENTIONED CODES.FINAL EGRESS LIGHTING QUANTITIES AND LOCATIONS SHALL BE TO THEIR SOURCE. DOOR NOTES: 00
<br /> 00
<br /> DTL DETAIL MATERIALS STORAGE,AND ACCESS TO AND FROM THE WORK,SPECIAL CONDITIONS OR NOISY WORK,TIMING DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT DETERMINATION.
<br /> DF DRINKING FOUNTAIN OF WORK AND INTERRUPTION OF MECHANICAL AND ELECTRICAL SERVICES.NOISY OR DISRUPTIVE WORK TO 8. CONTRACTOR SHALL BE RESPONSIBLE FOR PATCHING AND/OR REPAIRING ANY DAMAGE CAUSED BY HIM Q
<br /> DIA DIAMETER OCCUR OFF HOURS. 34. GENERAL CONTRACTOR IS RESPONSIBLE FOR ALL WASTE PICK-UP RELATED TO TENANT IMPROVEMENT. OR HIS SUBCONTRACTORS TO EXISTING CONSTRUCTION IN ELEVATOR LOBBY,PUBLIC CORRIDORS, 1. ALL EXIT DOORS SHALL BE OPERABLE FROM THE INSIDE WITHOUT THE USE OF KEY OR ANY SPECIAL
<br /> DIM DIMENSION RESTROOMS OR TENANT SPACES.REFINISH TO MATCH EXISTING ADJACENT FINISH,OR AS NOTED HEREIN. KNOWLEDGE OR EFFORT. +L+
<br /> DR DOOR 5. ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THE HIGHEST STANDARD OF WORKMANSHIP IN 35, GENERAL CONTRACTOR TO ENSURE MAXIMUM FLOOR AND ELEVATOR WEIGHT CAPACITY IS NOT 2. ALL GLAZING SHALL CONFORM TO SAFETY GLAZING REQUIREMENTS OF IBC SECTION 2406.
<br /> DWG DRAWING GENERAL AND WITH SUCH STANDARDS AS ARE SPECIFIED. EXCEEDED DURING EQUIPMENT INSTALLATION. 9. NO EXISTING SMOKE DETECTOR,PUBLIC ADDRESS SPEAKER,FIRE ALARM BOX OR SIMILAR DEVICE, 3. MAGNETIC HOLD OPEN DEVICES SHALL BE TIED TO BUILDING FIRE ALARM SYSTEM. N
<br /> DRW DRAWER INCLUDING THE ASSOCIATED WIRING SHALL BE DAMAGED DURING DEMOLITION AND SUBSEQUENT 4. ALL RATED DOORS TO BE LABELED PER IBC TABLE 715.3. p, -
<br /> 6. CONTRACTOR SHALL ADHERE TO ALL BUILDING STANDARDS.ANY CHANGES TO SAME SHALL BE SUBMITTED 36. GENERAL CONTRACTOR IS RESPONSIBLE FOR CONFIRMING ALL SCOPE RELATED TO CONNECTIONS TO CONSTRUCTION.RELOCATION OF SMOKE DETECTORS,PUBLIC SPEAKERS AND FIRE ALARM 5. THRESHOLDS AT DOORWAYS SHALL BEi"MAXIMUM IN HEIGHT.PER ICC/ANSI A117.1-2009 SECTION404.2.4. P m
<br /> E EAST TO ARCHITECT IN WRITING FOR APPROVAL. EXISTING BUILDING INFRASTRUCTURE.SHOULD SCOPE CHANGES BE REQUIRED,MODIFIED PLANS EQUIPMENT,NECESSITATED BY NEW CONSTRUCTION,SHALL BE ACCOMPLISHED AS A FIRST PRIORITY, 6. ICC/ANSI Al17.1-2009 SECTION 404.2.6.DOOR HARDWARE.HANDLES,PULLS,LATCHES,LOCKS&OTHER
<br /> EA EACH SHALL BE PROVIDED TO LANDLORD FOR REVIEW AND APPROVAL PRIOR TO INSTALLATION. AND PER THE PLANS.NO ACTIVE SMOKE DETECTOR SHALL BE COVERED OR OTHERWISE REMOVED OR
<br /> EL ELEVATION OPERABLE PARTS ON ACCESSIBLE DOORS SHALL HAVE A SHAPE THAT IS EASY TO GRASP WITH ONE HAND
<br /> ELEC ELECTRICAL 7. CONTRACTOR SHALL SUBMIT SAMPLES OF ALL FINISHES OF SUCH SIZE AND NUMBER THAT THEY REPRESENT A USED FOR OTHER THAN IT'S INTENDED PURPOSE. &DOES NOT REQUIRE TIGHT GRASPING,PINCHING,OR TWISTING OF THE WRIST TO OPERATE.OPERABLE
<br /> ELEV ELEVATOR REASONABLE DISTRIBUTION OF COLOR RANGES AND PATTERN PRIOR TO INSTALLATION FOR ARCHITECTS 37. GENERAL CONTRACTOR TO PROVIDE 0&M MANUAL AND ELECTRONIC AS-BUILTS OF ALL TENANT PARTS OF SUCH HARDWARE SHALL BE 34"MIN.&48"MAX.ABOVE THE FLOOR.WHERE SLIDING DOORS ARE
<br /> EO EQUAL APPROVAL.CONTRACTOR SHALL PROVIDE SHOP DRAWINGS AND PRODUCT DATA FOR ARCHITECTS IMPROVEMENT WORK AT PROJECT COMPLETION. 10. REMOVAL OF ANY EQUIPMENT,CABLING SWITCHES,AND CONDUIT PERTAINING TO IN THE FULLY OPEN POSITION.OPERATING HARDWARE SHALL BE EXPOSED&USABLE FROM BOTH SIDES.
<br /> EQUIP EQUIPMENT APPROVAL ON ALL SPECIAL ITEMS REQUIRING CUSTOM FABRICATION.(SHALL INCLUDE RATED FIRE DOORS DATA/COMMUNICATIONS SHALL BE VERIFIED WITH TELEPHONE COMPANIES AND TENANT. 7, ICC/ANSI A117.1-2009 SECTION 404.2.8.DOOR OPENING FORCE.FIRE DOORS SHALL HAVE THE MINIMUM
<br /> EST ESTIMATE EXIST EXISTING )AND HARDWARE). 38, GENERAL CONTRACTOR TO CONFIRM ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK.EXISTING OPENING FORCE ALLOWABLE BY THE APPROPRIATE ADMINISTRATIVE AUTHORITY.THE MAXIMUM FORCE
<br /> EXP EXPANSION COMMON AREAS TO BE BE PROTECTED THROUGHOUT CONSTRUCTION.ANY DAMAGE TO BE EXISTING 11. REMOVE ALL EXISTING MATERIALS WHICH WOULD CAUSE RISES OR DEPRESSIONS IN NEW FLOORING FOR PUSHING OR PULLING OPEN DOORS OTHER THAN FIRE DOORS SHALL BE AS FOLLOWS:1.INTERIOR
<br /> 8. CONTRACTOR IS TO VERIFY ALL DIMENSIONS AND CONDITIONS ON SITE AND NOTIFY ARCHITECT OF ANY BUILDING COMMON AREAS SHALL BE REPAIRED AT TENANT AND/OR GC'S EXPENSE. SURFACE,SUCH AS FASTENERS,OUTLET CORES,COVER PLATES,RESILIENT FLOOR COVERINGS,CARPET, HINGED DOOR:5.0 POUNDS(22.2 N) 2.SLIDING OR FOLDING DOOR:5.0 POUNDS(22.2 N).THESE FORCES
<br /> FEC FIRE EXTINGUISHER CABINET DISCREPANCIES.CONTRACTOR IS NOT TO SCALE OFF DRAWINGS. CARPET PAD,FLASH PATCH,CONCRETE FILL,PLYWOOD,ETC. DO NOT APPLY TO THE FORCE REQUIRED TO RETRACT LATCH BOLTS OR DISENGAGE OTHER DEVICES THAT
<br /> FF FACTORY FINISH 39. ANY AND ALL PLUMBING CONNECTIONS ARE TO BE MADE BY A QUALIFIED,LICENSED PLUMBER.COPPER HOLD THE DOOR IN A CLOSED POSITION.
<br /> FIN F NISH(ED)HEIGHTFH FULL 9. ALL MATERIALS INDICATED TO MATCH EXISTING SHALL DO SO WITH RESPECT TO SIZE,SHAPE,COLOR, SUPPLY LINES ARE PREFERRED BY LANDLORD. 12. DEMOLITION IS NOT NECESSARILY LIMITED TO WHAT IS SHOWN ON DRAWINGS.THE INTENT IS TO 8. ACTIVATION OF THE BUILDING AUTOMATIC SPRINKLER OR FIRE DETECTION SYSTEM,IF PROVIDED,SHALL EVERETT COMMERCE CTR A
<br /> FFUR FLOOR
<br /> LUOR FLUORESCENT TEXTURE,PATTERN,QUALITY AND METHOD OF INSTALLATION INSOFAR AS PRACTICABLE AND SHALL BE INDICATE THE GENERAL SCOPE OF DEMOLITION REQUIRED TO COMPLETE THE WORK IN ACCORDANCE AUTOMATICALLY UNLOCK ALL ELECTRONICALLY SECURED DOORS WITH IN THE EGRESS PATHWAY.THE Floor 1 &2
<br /> APPROVED BY THE ARCHITECT BEFORE USE. WITH THE CONTRACT DRAWINGS. DOORS SHALL REMAIN UNLOCKED UNTIL THE FIRE ALARM HAS BEEN RESET.
<br /> FDIC FURNISH BY OWNER, 9. ENTRANCE DOORS IN THE BUILDINGS WITH OCCUPANCY IN GROUP A,B,E OR M SHALL NOT BE SECURED CC ,J
<br /> INSTALL S CONTRACTOR 10. THE FLOORS MAY BE OCCUPIED DURING CONSTRUCTION.THE CONTRACTOR SHALL PROTECT ALL 13. RATED WALLS SHALL NOT BE PENETRATED UNLESS THE RATING IS MAINTAINED. 6611 ASSOCl2t2d BIVU
<br /> FOS FACE OF STUD(S) FROM THE EGRESS SIDE DURING PERIODS THAT THE BUILDING IS OPEN TO THE GENERAL PUBLIC.
<br /> FOC FACE OF CONCRETE PERSONNEL,PASSERSBY OR VISITORS TO THE SITE FROM HARM AND INJURY.BARRIERS SHALL BE INSTALLED 10. PROVIDE AND INSTALL DIAGONAL BRACE(TO MATCH WALL FRAMING)AT THE LATCH SIDE OF ALL NEW
<br /> FOF FACE OF FINISH AS REQUIRED TO PROTECT EQUIPMENT INSTALLED DURING CONSTRUCTION. CAREFULLY MAINTAIN AND 14. DISPOSAL:ALL DEBRIS REMOVED FROM THE SITE SHALL BE RECYCLED AS MUCH AS PRACTICAL AND DOOR FRAMES,ABOVE CEILING,EITHER TO ADJACENT WALL FRAMING OR TO STRUCTURE ABOVE. µ
<br /> FT FOOUEET
<br /> PROTECT MONUMENTS,BENCH MARKS AND THEIR REFERENCE POINT FROM BEING DESTROYED OR ALLOWED BY LAW.DISPOSAL SHALL BE COORDINATED BY GC. 11. GC TO COORDINATE JAMB DEPTH WITH FINISHED WALL WIDTH PRIOR TO ORDERING FRAMES. Everett,WA 98203
<br /> FUR FURREDIFURRING DISTURBED;REPLACE AS REQUIRED.
<br /> GA GAUGE 11. EXISTING WORK DAMAGED AS A RESULT OF WORK DONE UNDER THIS CONTRACT SHALL BE REPAIRED TO
<br /> GC GENERAL CONTRACTOR ORIGINAL CONDITION AND FINISHED TO MATCH ADJACENT FINISHES,SUBJECT TO ARCHITECTS APPROVAL, FINISH NOTES: REFLECTED CEILING NOTES: TYPICAL DOOR APPROACH CLEARANCES:
<br /> GL GLAS AND AT NO ADDITIONAL COST TO OWNER.ALL REPLACEMENT MATERIALS REQUIRED TO MATCH EXISTING DESIGN JPC
<br /> GWB GYPSUUMM WALL
<br /> ALL BOARD MATERIALS SHALL DO SO WITH RESPECT TO TYPE,PATTERN,TEXTURE,SIZE,SHAPE,COLOR AND METHOD OF
<br /> DRAWN VZ
<br /> HC HOLLOW CORE INSTALLATION INSOFAR AS PRACTICABLE,AND SHALL BE APPROVED BY THE ARCHITECT AND OWNER PRIOR 1. ALL WALLS 8 PARTITIONS TO RECEIVE P-1 U.N.O.
<br /> 1. COORDINATE THE WORK OF ALL TRADES INVOLVED IN THE CEILING WORK TO ENSURE CLEARANCES FOR
<br /> HCPD HANDICAPPED FIXTURES DUCTS PIPING CEILING SUSPENSION SYSTEM ETC.NECESSARY TO MAINTAIN THE FINISHED CHECKED
<br /> TO INSTALLATION. AC
<br /> HDR HEADER
<br /> CEILING HEIGHTS INDICATED ON ARCHITECT'S DRAWINGS.
<br /> HOW R HARDWARE 2. PROVIDE PAINT APPLICATION APPROPRIATE TO THE SUBSTRATE TO WHICH IT IS TO BE APPLIED. , ivz ADA FRONT APPROACH,PUSH SIDE NO. 24-0444
<br /> HIM HOLLOW METAL 12. ALL EXISTING MECHANICAL AND ELECTRICAL EQUIPMENT AND SERVICES DISRUPTED OR REMOVED DURING
<br /> HORIZ HORRONTAL CONSTRUCTION SHALL BE RESTORED AND REPLACED UNLESS NOTED OTHERWISE.FIREILIFE SAFETY 3. ALL EXPOSED GYP.BD.SURFACES,BOTH EXISTING AND NEW,ARE TO RECEIVE NEW PAINT FINISH. 2. PERIMETER CEILING ANGLE,WHERE OCCURS,SHALL BE INSTALLED TIGHT TO VERTICAL SURFACES,FREE CLEARANCE PER ICC/ANSI A117.1
<br /> HR HOUR SYSTEMS TO BE MAINTAINED DURING CONSTRUCTION. FROM CURVES,BREAKS OR OTHER IRREGULARITIES AND PAINTED TO MATCH CEILING FINISH.
<br /> HT HEIGHT PREP ALL SURFACES AS REQUIRED FOR NEW PAINT FINISH.PROVIDE ONE PRIME COAT PLUS TWO SECTION 404
<br /> HVAC HE ATINGVENTILATING FINISH COATS REGISTERED
<br /> 13. INSTALLATION OF MECHANICAL,ELECTRICAL AND STRUCTURAL SYSTEMS WILL REQUIRE OPENING OF SOME 3. FURNISH AND INSTALL ALL ASSOCIATED TRIM AND SEISMIC BRACING AS REQUIRED.
<br /> 12"MIN WITH CLOSER AND LATCH
<br /> AIR CONDITIONING J ARCHITECT
<br /> EXISTING WALLS,CEILINGS OR FLOOR CAVITIES.THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REPAIR 4. CHANGES IN FLOOR MATERIALS THAT OCCUR FRAMED DOOR OPENINGS SHALL OCCUR AT THE
<br /> INSUL INSULATION OF THESE OPENINGS TO MATCH EXISTING,EXCEPT WHERE NOTED OTHERWISE.FILL ALL HOLES AND VOIDS N CENTERLINE OF THE DOOR IN THE CLOSED POSITION. 4. LIGHT FIXTURES,NEW SPRINKLERS AND OTHER CEILING ELEMENTS SHALL BE CENTERED IN THE 2'X2' 48'MIN
<br /> FLOORS,WALLS AND CEILINGS WHICH RESULT FROM INSTALLATION OF WORK,AND REMOVAL OF EXISTING SECTION OF INDIVIDUAL CEILING TILES U.N.O.(EXIST.SPRINKLERS TO REMAIN UNLESS CONFLICT WITH NEW
<br /> JAN JANITOR MATERIALS AND EQUIPMENT REQUIRED BY THIS CONTRACT. PATCHED AREAS SHALL MATCH THE MATERIALS, ELEMENTS). 4.CTA
<br /> LOTTE aTr ONJT JOIM 5. ALL INTERIOR PARTITIONS,CEILING FINISHES AND TRIM OF PUBLIC AREAS LO COMPLY WITH CLASS 1 60"MIN OF WASHINGTON
<br /> FINISHES,AND LEVELS ADJACENT,OR SHALL BE PUT IN THE PROPER CONDITION TO RECEIVE THE FINISH MATERIAL CLASSIFICATION;FLAME SPREAD RATING 0 T025,SMOKE DEVELOPED 200.ALL INTERIOR
<br /> KIT KITCHEN INDICATED. WALL AND CEILING FINISHES AND TRIM OF NON-PUBLIC AREAS TO COMPLY WITH CLASS 2 MATERIAL 5. PROVIDE CEILING ACCESS AS REQUIRED FOR EQUIPMENT AND SYSTEM MAINTENANCE,AND MATCH - ADA FRONT APPROACH,PULL
<br /> CLASSIFICATION;FLAME SPREAD RATING 26 TO 75,SMOKE DEVELOPED 450. ADJACENT CEILING FINISH U.N.O. SIDE CLEARANCE PER ICC/AN$I
<br /> LAM LAMINATE(D) 14. ALL CORES TO BE REVIEWED AND APPROVED BY LL WITH KRC CORE PERMIT.
<br /> LAV LAVATORY 6. ALL SOFFITS AND CEILING HEIGHTS ARE DIMENSIONED FROM TOP OF FINISHED FLOOR TO BOTTOM OF I� A117.1 SECTION 404
<br /> LH LEFT HAND 6. PROVIDE FINISHED SCRIBE STRIPS AND FINISHED MILLWORK EDGES TO CREATE A FINISHED REVEAL FINISHED GYPSUM BOARD OR CEILING TILE AND SHALL ALLOW FOR THICKNESS OF ALL FLOOR FINISHES.
<br /> 15. CONTRACTOR SHALL PROVIDE FLOOR LEVELING AS MAY BE REQUIRED AT SLIDING DOORS,RELITES WITHOUT CONDITION WHERE MILLWORK COUNTERS,CABINETS,ETC.'ABUT'ADJACENT PARTITION
<br /> MAx MAXIMUM BASE,CABINET WORK,AND OTHER LOCATIONS REQUIRING LEVEL SUBSTRATE,EXCLUSIVE OF AREA WHERE CONSTRUCTION.ALL EXPOSED REVEAL SURFACES AND EDGES TO HAVE SAME PLASTIC LAMINATE
<br /> ME CH MECHANICAL CONCRETE FLOOR IS TO BE POLISHED.FEATHER CHANGES IN ELEVATION OVER SUFFICIENT AREA TO LIMIT FINISH AS THE CASEWORK ITEM THEY"ABUT'. 7. THE REFLECTED CEILING PLAN INDICATES THE LOCATION OF CEILING HEIGHTS,LIGHT TYPES,LIGHT
<br /> SIT L METAL TRANSITION SLOPE TO 1I8"PER FOOT. FIXTURES,AND ASSOCIATED ITEMS.
<br /> EZZ L---
<br /> MEZ MEZZANINE
<br /> '42"MIN
<br /> MFR MANUFACTURE(R) 7. CONTRACTOR TO CLEAN AND REPAIR ALL EXISTING MINI-BLINDS WITHIN THE WORK AREA. B. ALL SPECIFIC INFORMATION CONCERNING INSTALLATION FOR VARIOUS ABOVE-CEILING ELEMENTS ARE TO BE �4'
<br /> 16. MATERIALS,ARTICLES,DEVICES AND PRODUCTS ARE SPECIFIED IN THE DOCUMENTS BY LISTING ACCEPTABLE r---, iv z
<br /> MI SC MISCELLANEOUS MANUFACTURERS OR PRODUCTS,BY REQUIRING COMPLIANCE WITH REFERENCED STANDARDS,OR BY DESIGN BUILD,DOCUMENTATION BY CONTRACTOR-PERMITTED SEPARATELY.
<br /> MTD MOUMED PERFORMANCE SPECIFICATIONS. FOR ITEMS SPECIFIED BY NAME,SELECT ANY PRODUCT NAMED.FOR
<br /> MUL MULLION THOSE SPECIFIED BY REFERENCE STANDARDS OR BY PERFORMANCE SPECIFICATIONS SELECT ANY PRODUCT 9. NOTIFY ARCHITECT OF ANY CONFLICTS OF LIGHT FIXTURE LOCATIONS WITH MAIN RUNNERS,DUCTS,
<br /> MEETING OR EXCEEDING SPECIFIED CRITERIA.FOR APPROVAL OF AN ITEM NOT SPECIFIED,SUBMIT REQUIRED STRUCTURES,HVAC,ANDIOR(E)CONDUIT, PRIOR TO FRAMING FOR LIGHTS.ANY DISCREPANCIES BETWEEN ADA HINGE APPROACH,PUSH
<br /> NIC NOT IN CONTRACT SUBMITTALS,PROVIDING COMPLETE BACK-UP INFORMATION FOR PURPOSES OF EVALUATION.WHERE ARCHITECTS CEILING GRID LOCATION&ACTUAL FIELD CONDITIONS ARE TO BE CLARIFIED WITH THE SIDE CLEARANCE PER ICC/ANSI
<br /> NTS NOT TO SCALE BUILDING STANDARD ITEMS ARE CALLED FOR,NO SUBSTITUTE WILL BE ACCEPTED. ARCH ITECTPRIORTOFRAMING. I A117.1 SECTION 4O4
<br /> OA OVERALL
<br /> z
<br /> 10. SUBMIT GRILLE THERMOSTAT AND FIXTURE AND ELEMENT LAYOUTS TO THE FOR REVIEW -
<br /> OC ON CENTER 17. CONTRACTOR SHALL PROVIDEFORALLWORKREQUIREDTOMAINTAINCOMPLIANCEWITHLOCALFIRECODE. Typ,MOUNTING HEIGHTS PLUMBING FIXTURES L/� DPI *48"MIN WITH CLOSER AND LATCH
<br /> OD OUTSIDE DIAMETER PROVIDE FOR ALL REQUIRED SHOP DRAWINGS AND APPROVALS.CONTRACTOR IS RESPONSIBLE FOR AT LEAST I+ **12"MIN WITH CLOSER AND
<br /> OH OPPOSITE HAND PROVIDING FIRE ALARM SYSTEM AUDIBILITY.
<br /> DENG OPENING 11. VERIFY FIELD CONDITIONS AND LOCATIONS OF ALL PLUMBING,MECHANICAL DUCTS,STRUCTURAL ELEMENTS LATCH
<br /> PLEA M PLASTIC LAMINATE 18. MECHANICAL AND ELECTRICAL FIXTURES,OUTLETS,ETC.,WHEN SHOWN ON THE ARCHITECTURAL DRAWINGS, AND ALL OTHER RELATED ITEMS.INSTALL NEW PLUMBING,MECHANICAL,FANS,DUCTS,CONDUITS,AND 09.16.24 PERMIT ISSUE
<br /> PNL PANEL ARE FOR LOCATION INFORMATION ONLY.MECHANICAL AND ELECTRICAL TO BE BIDDER DESIGN.ALL E IDEGA1111CHAPTURB-FREECUREMENTS REFURTOILUDOREANIORLOCKFIONS. OTHER RELATED ITEMS SO AS TO NOT CONFLICT WITH ANY/ALL FIELD CONDITIONS INCLUDING LUMINAIRES. •q�, 2"Mh`
<br /> PR PAIR CIRCUITING COORDINATION TO BE BIDDER DESIGN. -
<br /> PTN PARTITION 12. INSTALL NEW LIGHT FIXTURES WITH PROTECTIVE FILM pR SIMILAR COVER OVER LOUVER,LENS,BAFFLE,ETC. F_
<br /> 19. CONTRACTOR IS TO PROVIDE DRAWINGS FOR ARCHITECT AND BUILDING MANAGEMENTS APPROVAL SHOWING TO AVOID FIXTURE SOILING OR DAMAGE.FIXTURES SHALL BE MAINTAINED CLEAN AND AS NEW.ALL LAMPS ADA LATCH APPROACH,PUSH
<br /> RBDRADIUS RESILIENT BASE LOCATIONS OFALL HVAC THERMOSTATS,GRILLESAND DIFFUSERS,FIREAND SMOKE DETECTION DEVICES -Merv, SHALL BE NEW AT PROJECT COMPLETION-RELAMP EXISTING FIXTURES. SIDE CLEARANCE PER ICC/ANSI
<br /> FIT RESILIENTTILE INCLUDING SPRINKLERS,SMOKE DETECTORS,FIRE EXTINGUISHERS AND HOSE CABINETS,PLUMBING AND
<br /> REF REFERENCE PLUMBING EQUIPMENT. y 13. CONTRACTOR TO VERIFY CODE COMPLIANCE OF EXISTING ACOUSTICAL CEILING GRID SYSTEMS AND A117.1 SECTION 404
<br /> REFR REFRIGERATOR 4 ASSOCIATED SEISMIC BRACING RESTRAINTS.SYSTEMS FOUND NOT IN COMPLIANCE SHALL BE MODIFIED T
<br /> *4$"MIN WITH CLOSER AND LATCH
<br /> REINF REINFORCING 20. ANYCHANGE IN LIGHT FI%TURF PLACEMENTDUETO INTERFERENCE OF MECHANICAL OR STRUCTURAL { Mlrv.�M N AND/OR NEW PROVIDED AS REQUIRED BY CURRENT BUILDING CODES(INCLUDING,BUT NOT LIMITED TO;REQ REVISION COMPONENTS MUST BE APPROVED BY THE ARCHITECT. <2�x m CURRENT IBC WALL MOLDING(2"ANGLE)AND SEISMIC SEPARATION JOINTS).
<br /> REV REVISION
<br /> RH RIGHT HAND a
<br /> RM ROOM 21. ALL PERMITS INCLUDING FIRE,MECHANICAL,AND ELECTRICAL TO BE FILED SEPARATELY BY THE CONTRACTOR. - 14. CONTRACTOR TO VERIFY CODE COMPLIANCE OF ALL EXISTING LIGHTING FIXTURES AND ASSOCIATED SEISMIC
<br /> RO ROUGH OPENING C7� § L72 M w BRACING RESTRAINTS.FIXTURES FOUND NOT IN COMPLIANCE SHALL BE MODIFIED AND/OR NEW PROVIDED
<br /> S SOUTH 22. ALL GYPSUM BOARD PARTITIONS SHALL BE TAPED,SPACKLED AND SANDED SMOOTH WITH NO VISIBLE JOINTS $ N m AS REQUIRED BY CURRENT BUILDING ANDIOR ENERGY COMPLIANCE CODES.ALL CONFERENCE ROOMS AND �4
<br /> SC SOLID CORE TO A LEVEL FINISH UNLESS OTHERWISE NOTED.PATCH AND REPAIR SURFACES TO MATCH ADJACENT OR OFFICES SHALL HAVE OCCUPANCY SENSORS AS REQUIRED BY CODE.
<br /> SEAL SEALANT ADJOINING SURFACES WHERE REQUIRED.ALL SURFACES SHALL BE ALIGNED. NoreEwsxcoNTROLoxoPeN r SECT SECTION RIDEOF THE-TER CLOSET. 15. ALL EXITING LIGHTS AND EGRESS LIGHTING LOCATIONS SHALL BE DETERMINED BY BUILDING AND FIRE ADA LATCH APPROACH,PULL SIDE�/ N
<br /> S SHEET 23. MODIFY EXISTING SUBSTRATE AS REQUIRED TO RECEIVE NEW FLOORING MATERIALS,THUS PREVENTING INSPECTOR'S FIELD PLACEMENT DETERMINATION. CLEARANCE PER ICC/ANSIA117.1
<br /> M SIMILAR SEC SPECIFICATION NOTICEABLE LUMPS OR DEPRESSIONS. SECTION 404
<br /> TYP.MOUNTINGHEIGHTS-DEVICES&EQUIPMENT 16. ALL SMOKE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITHIMC/IBC OR SUPERCEDING CODE.ALL FIRE 54"MIN WITH CLOSER AND LATCH
<br /> SO SQUARE DAMPERS SHALL BE INSTALLED IN ACCORDANCE WITH IMC/IBC OR SUPERCEDING CODE.SS STAINLESS STEEL 24. ALL WORK SHALL BE ERECTED AND INSTALLED PLUMB,LEVEL,SQUARE AND TRUE.
<br /> SR STEEL I I
<br /> E STOR STORAGE 25. REFER TO MILLWORK SHOP DRAWINGS FOR SPECIFIC DETAILS OF COORDINATION BETWEEN 17. EGRESS LIGHTING SHALL BE DESIGNED BY A LICENSED ELECTRICAL ENGINEER BASED ON FINAL FLOOR L
<br /> STRDC STRUCTURAL PLANS)AND THE MOST CURRENT(IN FORCE)ISSUE OF THE IBC,IEC AND LOCAL CODESIORDINANCES.THE
<br /> m g SUSP SUSPENDED DRYWALUMILLWORK CONDITIONS.
<br /> ENGINEER MAY USE THE ARCHITECTS EGRESS MAPS(COMMON PATH OF TRAVEL/EXIT TRAVEL DISTANCE)AS
<br /> TEL TELEPHONE 26, ALL GLASS SHALL BE CLEAR TEMPERED GLASS,UNLESS OTHERWISE NOTED.GLAZING TONG MARKS SHALL STARTING POINT FOR A BASIS OF DESIGN.HOWEVER,IT SHALL REMAIN THE SOLE RESPONSIBILITY OF THE
<br /> HINGE EFERMH�aAo�
<br /> TEMP TEMPERED oR F-C
<br /> x NOT BE VISIBLE.CLEAN AND POLISH ALL GLASS PRIOR TO PROJECT DELIVERY. scx Ott I-ivmERe occuRsl I-IwxERE occuxsl ENGINEER TO COMPLETEASCOPE OF WORK THAT ADDRESSES ALL EGRESS LIGHTING I.E.;ROOMS,
<br /> TFTI TENANT FURNISHED SPECIALIZED SPACES,PATHWAYS,ETC.PER THE AFOREMENTIONED CODES.FINAL EGRESS LIGHTING -� ADA FRONT APPROACH,SLIDING
<br /> B TENANT INSTALLED scneouLED000RaFRanE
<br /> THK THICKNESS) 27, ALL MILLWORK TO BE FASTENED TO THE PARTITION.PROVIDE NON-COMBUSTIBLE BLOCKING FOR ALL - ENrsIGNI QUANTITIES AND LOCATIONS SHALL BE DETERMINED BY BUILDING AND FIRE INSPECTOR'S FIELD PLACEMENT DOOR CLEARANCE PER ICC/ANSI
<br /> THRESH THRESHOLD MILLWORK NOT SUPPORTED BY FLOOR OR ABOVE 4'-0"HT.ALL CONCEALED LUMBER&BLOCKING TO BE FIRE soF 110Ea DETERMINATION. IsolcnoN STAMP
<br /> 3 TV TELEVISION TREATED. GxSWHEREPR ICAL RE STROBE -I-� A117.1 SECTION 404
<br /> g TYP TYPICAL oGROON SIGNAGE AILIGNCENTERLINE-
<br /> a UNFIN UNFINISHED / OEoencEs,nP General Notes &
<br /> UN0 UNLESS NOTED OTHERWISE SYMBOL LEGEND: h- IIN101HER
<br /> -h
<br /> vcr vlNncoMPOSlnorvnLe p3pg ROOM NUMBER REFERENCE x �W v wETIr.ECJ S Symbols
<br /> b VEN VENEER F.-H
<br /> xrsroxELEOTw EVERr VERTICAL e DETAIL REFERENCE BUBBLE o iEs unGERVESTI VESTIBULExxATGArvGEo ELEExoxE�ooATAON LE --- ADA POCKET APPROACH,SLIDING
<br /> VFY VERIFY zRos DOOR NUMBER REFERENCE. cfG°G. � IN
<br /> � DOOR CLEARANCE PER
<br /> VWC VINYL WALL COVERING /\
<br /> o $ W WESTANIDE REVISION REFERENCE " JOB NORTH =
<br /> wI NTH THERW,SEORGIRECTEDB.RUILDINGSF OAR TO BEDIFFEREN ICC/ANSI A117.1 SECTION 404 I-0 1
<br /> WD WOOD REFERENCE KEY AN o 2
<br /> ga W/O WITHOUT X INTERIOR ELEVATION SYMBOL © (REFER TO SHEET/KEYNOTES) aDevlces ro RE RLAceD STARnN nxr oPEaaLE PARTOF EouwNErITIAne1wRl
<br /> V✓r WEIGHT -X.X IN POSITUN i.WHERE scHEDULEo,CARDRRUIERTO REPLACED IN POSITION i. -
<br /> Q 12026 JPC ARCHITECTS,LLC
<br /> City of Everett Permit Services
<br /> EVERETT Reviewed for Permit 11/07/2024
<br />
|