My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Port of Skagit County 5/29/2025
>
Contracts
>
6 Years Then Destroy
>
2025
>
Port of Skagit County 5/29/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 11:22:06 AM
Creation date
6/12/2025 11:16:01 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Port of Skagit County
Approval Date
5/29/2025
End Date
6/7/2025
Department
Police
Department Project Manager
Jonathan Karr via Alicia Gill
Subject / Project Title
Hold Harmless for Training Facility/Exercise
Tracking Number
0004853
Total Compensation
$0.00
Contract Type
Agreement
Contract Subtype
Waivers/Releases
Retention Period
6 Years Then Destroy
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Port of Skagit SWIFT Center <br />Douglas Building <br />PBS Engineering + Environmental <br />PBS Project #41140.017 <br />PLM ASBESTOS SAMPLE INVENTORY <br />PBS Sample #Material Type Sample Location Lab Description Lab Result Lab <br />41140.017-106 Hard mudded fitting 1st floor, ceiling hatch in Northeast Layer 1: Off-white woven fibrous material NAD SATExercise Room Layer 2: White powdery material 5% Chrysotile 4% Amosite <br />41140.017-107 Hard mudded fitting on 6" Room 8 Layer 1: Off-white woven fibrous material NAD SATfiberglass straight run Layer 2: White powdery material 8% Chrysotile 3% AmositeLayer 3: Off-white woven fibrous material NADLayer 4: White powdery material NAD <br />41140.017-108 Hard mudded fitting on 6" hard Basement, west hall Layer 1: Off-white woven fibrous material NAD SATstraight run Layer 2: White powdery material 10% Chrysotile 7% Amosite <br />41140.017-109 6" hard straight run insulation Basement hall at Room 18, south Layer 1: Off-white woven fibrous material NAD SATLayer 2: White powdery material 11% Chrysotile 8% Amosite <br />41140.017-110 6" hard straight run insulation Basement, west hall Layer 1: Off-white woven fibrous material NAD SATLayer 2: White powdery material 6% Chrysotile 15% Amosite <br />41140.017-111 6" hard straight run insulation Basement, west hall at Room 19 Layer 1: Off-white woven fibrous material NAD SATLayer 2: White powdery material 12% Chrysotile 10% Amosite <br />41140.017-112 Hard mudded fitting on 4" straight run Basement, near room 18 Layer 1: Off-white woven fibrous material NAD SATLayer 2: White powdery material 10% Chrysotile 9% Amosite <br />41140.017-113 Hard mudded fitting on 4" straight run Basement, west hall at Room 18 Layer 1: Off-white woven fibrous material NAD SATLayer 2: White powdery material 13% Chrysotile 8% Amosite <br />41140.017-114 Hard mudded fitting on 4" straight run Basement, west hall at Room 19 Layer 1: Off-white woven fibrous material NAD SATLayer 2: White powdery material 11% Chrysotile 7% Amosite <br />41140.017-115 Hard mudded fitting on 4" Basement hall at Room 12 Layer 1: Silver foil NAD SAT <br />October 30, 2023 NAD - No Asbestos Detected 9 of 19
The URL can be used to link to this page
Your browser does not support the video tag.