CHANGE ORDER # <br />Project (Procurement) Number: Small Works Roster Project Title: <br />IFQ 2024-113 Clark Park Renovation and Off-Leash Dog Area <br />Description of Change: (Attach contractor change proposal and cost schedule) (Attach Price or Cost Analysis) <br />BUILDING/LOCATION: 2400 Lombard Avenue, Everett, WA 98201 <br />This change order extends the contract period by 74 days. Initially, the lights ordered from Change Order 2, dated <br />2/10/25, were expected to meet the project completion date. However, prior to the completion date, the contractor <br />notified the project manager that the lights were backordered and are not expected to arrive until late June, after <br />which they will need to be installed. The contract period extension allows the contractor to receive and install the <br />lighting fixtures to complete the project. <br />The changes described above result in the following adjustment(s) in price and contract time (in calendar days). <br />* Total Project Price Prior to this Change, <br />including tax $404,181.60 Contract Time & Completion Date Prior <br />to This Change 180 <br />Completion Date <br />Prior <br />05/18/25 <br />* Net (Increase) or (Decrease) Resulting from <br />this Change, including tax +$0 Net (Increase) or (Decrease) Resulting <br />from this Change 74 <br />* Total Project Price Including this Change, <br />including tax $404,181.60 Contract Time & Completion Date <br />Including This Change 254 <br />Completion Date <br />After <br />07/31/25 <br />By signing below, City of Everett and the Contractor agree that the Contract work shall be changed to the extent described in <br />all such <br />changes, including all direct and indirect costs and impacts. The City of Everett and the Contractor further agree that Contract <br />time shall be adjusted to the extent shown above. This Change Order only changes the contract between City of Everett and <br />the Contractor to the extent explicitly provided in this Change Order. Signatures on this change order may be ink, scanned pdf <br />signature, or other electronic means (such as AdobeSign). <br />CONTRACTOR CITY OF EVERETT <br />Reaper Construction, Inc. <br />17903 29th Avenue NE <br />Marysville, WA 98271 <br />City of Everett <br />3200 Cedar Street <br />Everett, WA 98201 Date <br />Project Manager: <br />Division Manager: <br />Department Director: <br />Name & Title:Raine Smiley, President City Attorney Template Approved as to Form 7.14.23 <br />Date:Mayor: <br />*WA Use Tax on materials included. WAC 458-20-171 <br />Attest: ___________________________ <br />Office of the City Clerk <br />0004 <br />5/22/25 <br />5/27/25 <br />5/22/25 <br />05/28/2025 06/03/2025