Laserfiche WebLink
MECHANICAL EQUIPMENT CONNECTION SCHEDULE <br /> TAG DESCRIPTION HP/KW/VA VOLTS/ MCA FUSE DISC. TAG NOTES <br /> PHASE (MOCP) SWITCH <br /> VCU-R-A-1 AIR COOLED CONDENSING MODULE 48013 41.0 60 60 VCU-R-A-1 1 <br /> VCU-R-A-2 AIR COOLED CONDENSING MODULE 486/3 31.0 45 60 VCU-R-A-2 1 <br /> VCU-R-B-1 AIR COOLED CONDENSING MODULE 480/3 41.0 80 60 VCU-R-B-1 1 TITAN ELECTRIC <br /> VCU-R-B-2 AIR COOLED CONDENSING MODULE 48013 41.0 60 60 VCU-R-B-2 1 FULL SERVICE ELECTRICAL CONTRACTOR <br /> 12828 NORTHUP WAY, SUITE 205 <br /> BC-Al BRANCH CONTROLLER 20811 1.6 15 Sm BC-Ai 1.2 BELLEVUE.WA 98005 <br /> BC-B1 BRANCH CONTROLLER 20811 1.6 15 Sm BC-Bi 1,2 PH. 06-633-2811 <br /> FA 206-374-2125 <br /> FCU-A-101 FAN COIL UNIT(LEVEL 1) 20811 2.9 15 Sm FCU-A-101 1 <br /> FCU-A-102 FAN COIL UNIT(LEVEL 1) 20811 4.3 15 Sm FCU-A-102 1 <br /> FCU-A-103 FAN COIL UNIT(LEVEL 1) 208/1 4.3 15 Sm FCU-A-103 1 <br /> FCU-A-104 FAN COIL UNIT(LEVEL 1) 208/1 2.1 15 SM FCU-A-104 1 CASE <br /> FCU-A-105 FAN COIL UNIT(LEVEL 1) 208/1 4.3 15 Sm FCU-A-105 1 <br /> FCU-A-106 FAN COIL UNIT(LEVEL 1) 20811 4.4 15 Sm FCU-A-106 1 <br /> FCU-A-107 FAN COIL UNIT(LEVEL 1) 20811 4.4 15 Sm FCU-A-107 1 (PF ENGINEERING <br /> FCU-A-108 FAN COIL UNIT(LEVEL 1) 208/l 0.2 15 Sm FCU-A-108 1 <br /> Consulting Electrical Engineers <br /> FCU-B-201 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-201 1 19515 North Creek Parkway,Suite 302 <br /> FCU-8-202 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-202 1 Bothell,WA 98011 <br /> FCU-8-203 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-203 1 425-402-9400 office@caseeng.com <br /> FCU-B-204 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-204 1 <br /> FCU-B-205 FAN COIL UNIT(LEVEL 2) 208/1 2.1 15 Sm FCU-B-205 1 <br /> FCU-B-205 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-206 1 _- - <br /> FCU-B-207 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-13-207 1 <br /> FCU-B-208 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-208 1 <br /> FCU-B-209 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-209 1 Sr p WASk7 <br /> FCU-B-210 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-210 1 A <br /> FCU-S-211 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-211 1 <br /> FCU-S-212 FAN COIL UNIT(LEVEL 2) 208/1 2.9 15 Sm FCU-B-212 1 <br /> CU-P1-01 CONDENSING UNIT(ELEV.MACH.RM) 208/1 11.0 30 30 CU-P1-01 1 332 <br /> CU-01-01 CONDENSING UNIT(ELEC.RM) 208/3 10.0 15 30 CU-01-01 1 <br /> SS/ONALE� <br /> 03/25/2024 <br /> FCU-Pi-01 FAN COIL UNIT(ELEV.MACH.RM) 208/1 0.2 15 Sm FCU-Pl-01 1,3 <br /> FCU-01-01 FAN COIL UNIT(ELEC.RM) 208/1 8.0 15 Sm FCU-01-01 1 <br /> 1 PERMIT SET <br /> DOAS-R-01 ENERGY RECOVERY VENTILATOR UNIT 480/3 80.0 90 100 DOAS-R-01 1 MARCH 25,2024 <br /> MUA-1-01 MAKE UP AIR UNIT 480/3 75.0 80 100 MUA-1-01 1,4 <br /> EF-1`1-01 GARAGE EXHAUST FAN(2 HP) 480/3 10.0 VFD EF-Pl-01 1AB <br /> EF-01-01 MACHINING ROOM EXHAUST FAN(2 HP) 480/3 10.0 VFD EF-01-01 1,5,7,8 <br /> SF-01-01 KITCHEN EXHAUST FAN(114 HP) 12011 0.2 - - SF-01-01 119 <br /> TF-Pi-01 GARAGE CIRCULATION FAN(1/4 HP) 120/1 4.0 VFD TF-Pl-01 1,5 <br /> TF-Pi-02 GARAGE CIRCULATION FAN(114 HP) 120/1 4.0 VFD TF-Pt-02 1,5 <br /> TF-02-01 ELECTRICAL RM CIRCULATION FAN(114 HP) 12011 02 7 02-01 1,6 <br /> HVLS-01-01 MACHINING RM CIRCULATION FAN(1/4 HP) 120/1 02 HVLS-01-01 1,10 <br /> HVLS-01-02 MACHINING RM CIRCULATION FAN(1/4 HP) 120/1 02 - HVLS-01-02 1,10 <br /> EWH-XX ELECTRIC WALL HEATER 20811 VARIES EWH-XK 11,12 <br /> ECH-XX ELECTRIC CEILING HEATER 20811 VARIES ECH-)O( 11,12 <br /> DH-01-01 ELECTRIC DUCT HEATER 5.0 208/1 24.0 30 30 DH-01-01 1 <br /> FU-1-01 FILTRATION UNIT(15 HP-WELDING EXHAUST) 480/3 26.0 VFD FU-1-01 1,5,13 <br /> SVAV-01-01 SUPPLY AIR(ASSEMBLY) 20811 SVAV-01-01 1 <br /> EVAV-01-02 EXHAUSTAIR(ASSEMBLY) 20811 EVAV-01-02 1,13 Project Title: <br /> SVAV-01-03 SUPPLY AIR(ASSEMBLY) 20a/1 SVAV-01-03 1 <br /> EVAV-01-04 EXHAUSTAIR(ASSEMBLY) 20811 EVAV-0104 1,14 <br /> SP-1 GARAGE SUMP PUMP(2 x 2HP) 48013 6.S 15 30 SPA <br /> SP-2 ELEVATOR SUMP PUMP(FRACTIONAL HP) 120/1 SP-2 New Budding for: <br /> RCP-1 CIRCULATION PUMP(70 WATTS) 120/1 0.1 - RCP-1 <br /> WH-1 WATER HEATER(I BkW) 18.0 480/3 27.0 30 30 WH-1 <br /> AC-1 AIR COMPRESSOR(40HP) 480/3 65.0 70 100 AC-1 LAM <br /> AD-1 COMPRESSED AIRDRYER(2.8HP) 48013 4.8 15 30 AD-1 <br /> EVEUTT <br /> GENERAL EQUIPMENT CONNECTION SCHEDULE NOTES <br /> (APPLIES TO ALL EQUIPMENT LISTED IN SCHEDULE) <br /> A. THE ACTUAL MANUFACTURER FOR THE EQUIPMENT MAY BE DIFFERENT.COORDINATE WITH MECHANICAL EQUIPMENT <br /> SUBMITTALS FOR ACTUAL LOADS,CIRCUIT AMPACTIY AND OVERCURRENT PROTECTION REQUIREMENTS PRIOR TO ELECTRICAL ROUGH-IN. <br /> B. LOCATE ALL DISCONNECTING MEANS PER NEC AND AHU REQUIREMENTS. STARTERS ARE SEPARATELY MOUNTED UNLESS OTHERWISE NOTED. <br /> C. ABBREVIATIONS: 8729 A Tn CIRT ROAD <br /> OA T <br /> HRS: HORSEPOWER RATED MOTOR DISCONNECT SWITCH WITH OVERLOAD PROTECTION,18-AMP MINIMUM,RED PILOT LIGHT. OL+�7'7C lD]LLLr�T�1T� 1`1 1` I'llJ <br /> Sm: MOTOR RATED TOGGLE SWITCH. E V Li�E 1,WA 98204 <br /> TS: TOGGLE SWITCH,16-AMP MINIMUM,RED PILOT LIGHT. PROVIDE 1-POLE OR 2-POLE AS REQUIRED. <br /> D. ALL DISCONNECTS ARE 3 POLE UNLESS NOTED OTHERWISE. <br /> E. PROVIDE A ROOFTOP WEATHERPROOF GFI DUPLEX RECEPTACLE WITHIN 25 FEET OF ALL ROOF MOUNTED HVAC UNITS AS REQUIRED BY NEC. <br /> F. CONNECT FIRE SMOKE DAMPERS TO A 120VAC 20 AMP CIRCUIT ROUTED THROUGH A RELAY CONTACT(N.C.)IN THE FIRE ALARM CONTROL PANEL. Sheet Title: <br /> REFER TO MECHANICAL DRAWINGS FOR ALL FIRE SMOKE DAMPER LOCATIONS AND QUANTITIES, PROVIDE ALL APPURTENANCES AS REQUIRED. <br /> PROVIDE DISCONNECT TOGGLE SWITCH WITHIN SIGHTOF THE DAMPER MOTOR CONTROLLER AND DAMPER MOTOR. <br /> SCHEDULE NOTES <br /> CHANICAL <br /> (APPLIES TO SPECIFIC EQUIPMENTAS NOTED IN"NOTES"COLUMN) EQUIPMENT <br /> 1 POWER WIRING,CONDUITAND DISCONNECTBY E.C.COORDINATE LOCATIONS WITH M.C. EQTU�Tl�l7MEN7T - <br /> 2 PROVIDE 120V CIRCUIT.UNITPROVIDED WITH CONDENSATE PUMP WITH PLEMUN-RATED ENCLOSURE. CONNECTION <br /> 3 UNIT POWER DERIVED FROM OUTDOOR UNIT UMBILICAL CONNECTION. SCHEDULE <br /> 4 POWER INTERLOCK WITH EF-01-10.UNIT MUST OPERATE SIMULTANEOUSLY WITH EXNAUST SYSTEM, <br /> 5 PROVIDED WITH VFD.VFD PROVIDED BY M.C.,INSTALLED AND WIRED BY E.C. <br /> 6 CONTROL VIA LINE VOLTAFE THERMOSTAT,FURNISHED BY M.C.AND INSTALLED BY E.C. <br /> 7 POWER INTERLOCK WITH MAU-1-01,WIRED BY E.C. <br /> 8 FAN CONTROL VIA WALL MOUNTED CO/NO2 SENSOR.SENSORS PROVIDED AND WIRED BY M.C. Designed By: SHUJO <br /> 9 POWER INTERLOCK WITH RANGE HOOD.WIRED BY E.C. Drawn By: SH/JO <br /> 10 PROVIDED WITH WALL MOUNTED SPEED CONTROLLER.CONFIRM REQUIREMENTS WITH M.C. Project NO: 23244 <br /> 11 UNIT TO BE PROVIDED WITH INTEGRAL THERMOSTAT. - - <br /> 12 UNIT PROVIDED AND INSTALLED BY E.C. <br /> Date: 03/2512024 <br /> 13 UNIT PROVIDED WITH CONTROL PANEL REQUIRING A 120V POWER CONNECTION.EQUIPMENT PROVIDED BY M.C.AND WIRED BY E.C. <br /> 14 POWER INTERLOCK WITH UNIT VAV-01-01 Sheet Number: <br /> 16 POWER INTERLOCK WITH UNIT VAV-01-03 <br /> E10.04 <br />