My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8900 8TH AVE W 2024 Plans 2025-07-01
>
Address Records
>
8TH AVE W
>
8900
>
Plans
>
8900 8TH AVE W 2024 Plans 2025-07-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/1/2025 2:13:06 PM
Creation date
6/13/2025 1:49:44 PM
Metadata
Fields
Template:
Address Document
Street Name
8TH AVE W
Street Number
8900
Permit
B2408-012
Year
2024
Notes
GARAGE CONVERSION INTO ADULT FAMILY HOME
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
`K� <br /> TABLE M11505.43(I) LJ V ■■ <br /> LEcIErD: WHOLE-HOUSE MECHANICAL VENTILATION AIRFLOW RATE <br /> (• EXISTING WALL <br /> NEW 2.4 INTERIOR WALL PER PLAN NUMBER OF BEDROOMS <br /> _ NEW 2xG EXTFRCR wALL PFK PLAN DWELLING UNT O-I 1 2 3 4 5 or-more D E s 1 4 N <br /> FLOOR AKEA <br /> $DO SM^IT DETEGTCK VARED (sq-�cwe Feet) <br /> w/BACK-W BATTERY ARFLOW N GFM THESE DRAWINGS ARE THE SOLE PROPERTY <br /> OF CNL DESIGN AND ARE NOT TO BE USED <br /> O SMOKE DETEGTOK V*ED IN TINGLEIEN 'OIR I Ni RTOF(VATHNL OOUTTGTH ox EXPRESS <br /> SIX'4 w/CARBON MONIOXCE ad <500 30 30 35 95 50 AND ALL CONTRACTORS TO CHECK AND VERIFY <br /> W/BACK�.IP BATTERY EXISTING DIMENSIONS AND CONDITIONS IN THE <br /> CONCRETE PATIO EF.. TO FIELD <br /> CNL DESIGNN OF AN Mp MATERON IAL <br /> OR <br /> EXHAUST FAN(VTO) �L°°° 30 35 40 50 55 DETAIL CHANGES OCCURS.DO NOT SCALE <br /> FROM THIS DRAWING. <br /> WHEF <br /> WHOLE HOUSE EXHAUST FAN (VTO) I00H,500 30 40 45 55 GO <br /> e216 HE 175TH STREET 2024 <br /> VAIDOW SCI-EDLLE(N&E) I501-2,000 35 45 50 60 G5 SHORELINE,WA 98155 <br /> 206-6832395 <br /> ODOCK SCHEDULE(N&E) 200F2,500 40 50 55 G5 70 cnldeslgn.drokingOgmoil.com <br /> MINI-SPLIT DUCTLESS UNIT 2501-3,000 45 55 GO 70 75 PROJECT: <br /> o N-WALL FAN FORCED ELEGTRIG HEATER SHIKESSO—SETEGN <br /> 2.40 VOLTS w/SEPARATE TIER OSTAT 3CO-31500 50 GO G5 75 80 RES. INTO AN A.F.H. <br /> EGRESS 350F41000 55 G5 70 80 <br /> as asoo aTH AVE. w <br /> 3050 S,H. EVERETT, WA 98204 <br /> p 400",500 GO 70 75 85 90 <br /> DATE: 09-21-2024 <br /> PROJECT 1095 <br /> 1 F 4501-5p°O (5 75 80 90 95 N0. <br /> iv ® Fa-SL I scPa-e Foot=00929 m2, <br /> &J GFM DUE TO WORK ON THIS PERMT,EXISTING PORTIONS cubic Poo+Per m X fu -0.0004719 m3/S. DATE <br /> D1P1 OF THIS HOUSE MUST HAVE SMOKE DETECTOR AND CARBON REVISION <br /> 7 7 FP ���JJJ N BATH MONOXIDE DETECTORS AS FOR NEW CONSTRUCTION ALL <br /> ROOM BEDROOM-A SMOKE&CARBON MONOXIDE SHALL BE INTERCONNECTED TABLE M505430) 1 <br /> AREAS WHERE THERE IS NO REMOVAL OF FNI5H MATERIALS, INTERMITTENT OFF WHOLE-HOUSE 2 <br /> NSI (t IG5 SF) OK ATTIC/CRAWL ACCESS.WP.ELESS NTEKCONNECTION IS MECHANCAL VENTILATION RATE FACTORS 3 <br /> NEw 214 HFaF2 ALLOWED IF SMOKE RNA CARBON MONOXIDE REARMS ARE 4 <br /> O NitFRgR WALL UL-LISTED AND ALL ALARMS ACTIVATE SIMULTANEOUSLY AND 5 <br /> °yPDAU IS AUDIBLE THKCUGHOUT THE HOUSE KLN-TMF%N EACH 6 <br /> 31-41 T,-O, SO 4-HOUR SEGMENT 50"/. GG% 75% COX 78 <br /> O 9 <br /> 10 <br /> G D2 , Factor° 2 M L3 1.0 11 <br /> SDCO <br /> V OO <br /> NEW AOIXTK)N&GONNER.SON TOTAL HEATED FLOOR AREA <br /> Q r - 559 SQFT.WITH 5 BEDROOMS <br /> ut BATH d W410LE HOUSE VENTILATION FAN SM-G5 CFM x 2 NOTES: <br /> R 3 (SCM PER 4-HOLE-).13D CFM VTO DO NOT SCALE DRAWING <br /> J TER 3 HEAT <br /> KITCHEN I g USE DIMENSION DRAWING <br /> 2 2 D2 z BEDK M- r N LANDING < <br /> NSA (3 97 ) = TABLE R402 L3 <br /> I40 CFM VTO. INSULATION AND FENESTKATION REQUIREMENTS BY COMPONENT* <br /> M LINEN <br /> O ROO SO CLNWTE ZONE 5 ANDMAKNE 4 <br /> ITI ADDONS 150 SF TO 500 SF:2.0 CREDITS 00 3 ( I. <br /> O N�wALL Feneslralim U-Factor b 030 <br /> ALL DWELLNG UNTS THAT AKE NOT INCLUDED IN A:I,02 OR O3 - Sk-Mb U-Fac+or O50 <br /> 02 .ITII L.IT'Y P.00M <br /> � IL ceW K-vase* Go Z <br /> ZA21 WSEG HE <br /> WHEF ° M Fx I+ ° ) Wood Erawr ohWeR-vdue zo s 13,10 1Q <br /> FUEL NORMALTLATION CREDITS. R __ Below-Grade c,h Wdl R-vdue 0n5/21 inl+5TB <br /> r--- <br /> D3 �y y Slab dF10,4 44 <br /> SYSTEM TYPE*3-.(O5 P4.) 12 W,T_ S CFM �O a? HALLWAY III AITC DI LANDING in V� <br /> FOR HEATING SYSTEM BASED ON ELECTRIC KEASTANICE ONLY N4WPo1 m I Ax ^/ <br /> (EITHEK FORCED AIR OR ZONAL) --- D5 1.1E <br /> ENERGY CREDITS: ROp j_ O I-8" sKo AN1r <br /> O GAME sLKF FLASH ALL NEW V*DOWS SHALL HAVE A U�VALLE OF 30 FAD NIFKC CEKTFPD <br /> EFFIGIENIT WRIER HEATING OP110N 5.G-. 20 _ FI Ff.T 4'-0• crypr Z <br /> Sao NJ <br /> L C R THE IT�NDARDS FOR TER O O z D7 O <br /> W OF NEE.A's ADVANCED WATER HEATING SPECIFICATION O SD DI SD Ul cep DOORS AND V*DOV4S SC(�EDLLE , <br /> ELECTRIC.HEAT PUMP WATER HEATEK WITH A MNfvUM UEF OF 2.9 AND O lJ <br /> UTILRNG A SPLIT SYSTEM CONRCiUKATION WITH AIR TO KEFKOEKANT HEAT GRREGNERS 6'-7• 3'-8" J MARK � TYPE 14VZDWARE REMARKS <br /> EXCHANIGEK LOCATED OUTDOORS.EQUIPTMENT SHALL MEET SECTION 4, BEDROOM D2 D- (2)3We � NrFzccNT,Ecr oEVr,F. FfiRF55 Q REOUIKEMENTS FOR ALL LINTS,OF THE NEEA STANDARD ADVANICED WATER <br /> HEATING SPEGFIGATION WITH THE UEF NOTED ABOVE. 7 <br /> (i OI SF) " " D-2 (b)30GBL« 6PAPEL <br /> IywAu Da COV'D. NIFhTFR ® c I= UE TY <br /> SD ENTRY LANDDNG <br /> ® D-3 (I)3 NIFRCR PoC.KET COCK LATCH TYPE <br /> SD O 8 8 <br /> OFFICE � BEDROOM_ D-4 m soGD NIFKCK eIFaD PU1 Kr*Je G PANEL <br /> a, 3050 S.H. NSI (t 150 SF) BE OOM-0 i0 <br /> j� (tI37) D-5 N 9048 NRERCK&FOLD PILL KNOB G PANEL <br /> EGKE55 -I(t OI SF) <br /> 3, D-L (D 3CG9 NIERCK&FCiD PULL KI'm 6 PANEL <br /> STEP <br /> LP I D-7 N B48 NIFRCK HOLLOW NCN4-OC1IlY G PANEL <br /> CfRE 0.'JCR LEVTK TIFE <br /> SHEET INFO: <br /> D-0 (D 2(cGe � kEIFD IaCB 6PANFl <br /> 3 w-I (2)oaD BOUPEKSVNY WrnR¢��rAl E4KES5 PROPOSED MAIN <br /> FLOOR PLAN <br /> �4y VM EGKEss I wI EGRESS HMERGCMEGT DEVICE=AN NTTRNN_MF1kW45M THAT DEAGTNRTES TIE <br /> ® �® DT,AVECLT LOCK VvaEN TIE LEVER 5 TURNED TO OPEN THE DOOP"LEVER DOCK ENERGY CREDITS <br /> HANDLE AND PEAD80Lr VMF1J N LOCIffD PO5RICN WILL CFEN_li+M.LTAIW_6LY <br /> NOTE. 4 I• A 3 AUDV*r PEOPLE TO EAT AND KEFJJIFP.W rHCUr TFE USE OF ANY KEY. <br /> ALL EGKE55 WINDOW SILL HEIGHT T OCL ANDCK SPECIAL QIVA_FD TABLE M 15 0 5.4.3(1) <br /> 15 44'ABOVE FINISH FLOCK IKC K3I023 2 STEPS I1P <br /> TABLE M1505.4.3(3) <br /> DRIVEWAY TABLE 402.1.3 <br /> equal to or less than <br /> ------ 4CTKCAL oN R SEPARATE PFKMT SCHEDULE OF <br /> DOORS & WINDOWS <br /> PKOPOSED MAIN FLOOD PLAN SCALE:OW <br /> EXIST.+NEW LUING SPACE-1610 SF SCALE:1/4'4-0" <br /> A2 <br /> DRAWN BY: CNL <br />
The URL can be used to link to this page
Your browser does not support the video tag.