Laserfiche WebLink
0 CITY OF EVERETT PERMIT SERVICES <br /> EVERETT PERMIT APPROVAL & NOTES COVER SHEET <br /> WASHINGTON <br /> STANDARD CONDITIONS OF APPROVAL: REVIEWER APPROVALS: PERMIT <br /> INFORMATION: <br /> 1. Approved plans must be on job site at all times and available for inspectors. PLANNING: Interior work only-no exterior work proposed Site Address: <br /> APPROVED <br /> Office&Community,Planning&Economic Development Must meet required off-street parking per EMC 19.34.020.2 off-street parking 215 110T H P L S E <br /> PLANNING DEPARTMENT spaces are required for the dwelling,plus 1 space for each staff on a shift who does <br /> 2. See face of permit for permit conditions of approval and additional requirements. SAME: .,Trap not live on-site. <br /> nTe 01/16/2025 <br /> 3. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at This approval only applies to Owner: <br /> onlinepermits.everettwa.govto formally request all required inspections. the work being performed under <br /> Permit# B24112-034 <br /> and does not recognize any Manuel E c o <br /> 4. This permit must be finaled in order to close out this permit, legitmize work and grant a Certificate Of Occupancy. existing ethat may not <br /> meet Zoning ng Code. <br /> 5. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER App. Date: <br /> 811. 12/16/2024 <br /> BUILDING: R330.9.1 Handrails for Ramps <br /> 6. All work shall be performed in accordance with the approved permit conditions and plans approved by the City of Handrails shall be installed both sides ramps between the slope 1 vertical to 12 horizontal and 1 vertical <br /> and 20 horizontal in accordance with Sections R311.8.3.1 through R311.8.3.3. <br /> Everett. Permit Type: <br /> R311.8.2 Landings Required <br /> Ev TT City of Everett Permit Services There shall be a floor or landing at the top and bottom of each ramp,where doors open onto ramps,and where ADULT FAMILY HOME <br /> 7. Protect all existing underground utilities during construction. REVIEWED FOR CODE COMPLIANCE ramps change directions.The width of the landing perpendicular to the ramp slope shall be not less than the <br /> By Review Discipline:Building <br /> width of the ramp.The depth of the landing in the direction of the ramp slope shall be not less than 36 inches. BUILDING <br /> Reviewer:achen <br /> 8. Any damage to City improvements(sidewalk,curb, roadway,etc.)shall be replaced per City Standards and/or as Date:02106/2025 SUBJECT TO FIELD <br /> directed by the City PW Inspector. Review Status:Approved for Permit INSPECTION <br /> Subtype: <br /> 9. Keep City streets clean at all times. No dirt, mud, rocks,or debris to be tracked onto roadway. CONVERT EXISTING SFR <br /> TO ESTABLISH AN ADULT <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious FAMILY HOME <br /> surfaces will be managed on-site in a manner that does not adversely affect neighboring properties,including the FIRE: <br /> City's right-of-way and/or easements and the improvements located therein. <br /> Ev`TT Description: <br /> Everett Fire Dept.Permit Review W A B 0 <br /> Status:Approved <br /> Reviewed By:KBrown <br /> 12/30/2024 1:53:32 <br /> PM <br /> PUBLIC WORKS: <br /> PERMIT NUMBER: <br /> B2412-034 <br />