Laserfiche WebLink
1�W.1pryryQ�� <br /> A. <br /> CORNER BARS TO 'PFplp¢• <br /> MATCH HORIZ.REINF. R1610 INSULATION,SEE ARCH'L DRAWINGS <br /> (ALT.HOO145 AT <br /> INTERMEDIATE WALL5) <br /> BURKE"KEYED KOLD"JOINT- SLAB-ON-6RADE )i'x lIh"GONT.PREMOLDED <br /> STOP REINFORCN6 I"CLEAR PER PLAN MA5TIC JOINT STRIP OR <br /> 04x 24 1e 24"D.G. OF JOINT EACH SIDE '�'d'W-CUT J <br /> SLAB-ONTO RADE J <br /> PER PLAN <br /> W e i mp <br /> FINIS-HW GRADE o, U <br /> a ui <br /> = 1plpT"' <br /> " 17 f ADDITIONAL VERT. GUT ALTERNATEWALLS BAR®CORNERWIRES AT JOINT AND FOOTINGS OR A5 CASE E P PREPARE BASE PER PLAN <br /> TOR <br /> I)OP�BOT. D BY <br /> GEOTEGHIMED all' AS PNEIGALEENb ENGINEER <br /> g <br /> 6EOTEGHNIGAL ENGINEER <br /> ja V w i <br /> IL ay a t <br /> CONSTRUCTION JOINT CONTROL JOINT o <br /> t° <br /> of U= W <br /> 6" <br /> �w <br /> F � < <br /> W <br /> 20 q CORNER BARS 8 I6 a� V R <br /> a o 9 <br /> 9'-0"MIN. D �15 <br /> U <br /> W <br /> POST PER PLAN d `� vioz <br /> "�•: <br /> u <br /> d a <br /> 12"SO.PLINTH w/ <br /> POST <br /> DA9E (4)a4 VERT t (I)•4 x 56"DIAGONAL — — <br /> PER PLAN •9x❑TIES•12bc d U <br /> >/ <br /> m z� BTL <br /> AL FOOTING S m ENGINEERING <br /> REINFORCING _______ 'v `w ����oa.Pu'"�� <br /> REINF.PER PLAN FOOTING,PER PLAN EXCAVATION NOT ® PHON811'11"11 <br /> 'L BARS TO ALLOMP BELOW ------- o <br /> X MATCH NORMAL THIS LINE 0 y <br /> Q REINFORCING PIPE SLEEVES AS REOV- .n ° <br /> I <br /> RMAL FOOTING ADJACENT PENETRATIONS z° <br /> Q REINFORGIN6 SHALL BE SPACED A MIN. <br /> m LINE OF EXCAVATION I -6'MIN OP(4)DIAMETERS ON CENTER 2'-O"MIN. <br /> zz <br /> S ^ IS PIPES PENETRATING FOCTIN65 I 0o <br /> Fo <br /> SHEATHING PER I/5900 SHEATHING PER I/5900 TL.� <br /> FAGENAIL PER I/5900 FAGENAIL PER I/99 �a <br /> DIAPHRAGM DIAPHRAGM ° W <br /> BOUNDARY 2x STUD WALL PER PLAN BOUNDARY 2x 5TU WA <br /> LL ALL PER PLAN <br /> NAILING NAILING oF0 v <br /> U� <br /> SHEATHING NAILS®4"oc SHEATHING PER PLAN SHEAR WALL EDGE NAILING u <br /> SHEATHING NAILS a 4"— SHEATNIN6 PER PLAN SHEAR WALL EDGE NAILING r <br /> W O <br /> _ -_________ I SPLICE SHEATHING GALLOUT SIZE REINPORGIN6 REFERENCE �d Of <br /> ---'- PLAN <br /> co <br /> -111 la IS"ea,x 6'thick (2) EA.WAY _ x � > <br /> E BOTTOM ° <br /> 2 (WHERE gyms) JOISTS PER PLAN i� �� 4 24"•q x 8"thlek (2)N5 EA.WAY _ <br /> JOISTS PER PLAN JOISTS PER PLAN i� — — JOIST5 PER PLAN il. SHEAR WALL EDGE NAILING © BOTTOM ¢ <br /> 2x4 FLAT BLOCKING® PILLS J019T BLOCKING•45"ee ® 90"eq x 8"thlUc - i 5 0 <br /> .� r3)•4 EA.WAY cEi /R <br /> 48"oc(NOT REQUIRED IF HANGER PER PLAN °.q l�4'L5L RIM BOARD BOTTOM o <br /> UNBALANCED FILL<2'-0") STEM WALL AND FOOTING ® 96"aq x 12"thick ('')04 Y ' <br /> - a uj <br /> PER I/5000lull - STEM WALL AND FOOTING o N O W <br /> ..,} PER I/5600 za , <br /> zo a <br /> SEE 9/SOO SEE'f/5800 -y x A z <br /> PO IN R�o UT5 I O PO N GOMMONCAL TS CL 1 as VC/ <br /> J � <br /> O 2.6 P.T.PLATE W <br /> (Sx6 WHERE SPECIFIED <br /> PERISTIN&STEM WALL d AND LAqOO)TEWA5HER5 8'-0"MAX <br /> NEW STEM WALL FOOTING PER I/5900 UNBALANCED <br /> AND FT* W <br /> DECKING PER ARCH'L FILL <br /> � <br /> b <br /> •i,TOP U <br /> N <br /> j •4 x 30"EA.NLS NV SET-XP (A 6 18"ee,VERT. z_ U S a a <br /> c • EPDXY®EA.NEW REINF. (ACT.HOOKS) CJ <br /> BAR(EMBED 4")NO SPECIAL INSPECTION JOISTS PER PLAN il� f Z <br /> REQUIRED J0I5T5 PER PLAN <br /> •,,' LU528 H6R5(SEE GEN. (2)>R4,BOTTOM--,- <br /> OTTOM - Ib 3 ¢ W <br /> NOTES FOR H6R.REQ'MENT5 6 Q <br /> o TREATED WOOD) Q O N <br /> O <br /> 9" S'• 5" TYP. N <br /> — P.T.2x10 LEDGER D(2) O <br /> 12'oc EA,RON,,STAGGERED <br /> S 4 3 FOR r 2 <br /> IN COMMON <br /> CITY OF EVERETT <br /> REVIEWED FOR PERMIT m N <br />