Laserfiche WebLink
TERMINAL UNIT SCHEDULE <br /> PIPE PRIMARY AIR <br /> UNIT N0. SERVICE IS DESIGNF BOX SIZE DESIGN CFM MAX SP REO MBH GPM MIN ROWS MAX PD RUN-OUT TO TEMP(DEG REMARKS <br /> COIL F N <br /> 2-25 ADULT GROUP THERAPY 216,HALL,OFFICE TITUS DESV 8 650 0.31 25.2 3 2 0.9 3/4" 55 1,2 0 <br /> Z <br /> rn <br /> 2-29 WAITING 201,HALL TITUS DESV 8 285 0.14 23.8 3 2 0.9 3/4" 55 1,2 U N <br /> rn._ <br /> 2-30 ADULT GROUP THERAPY 216,LOCKERS TITUS DESV 8 275 0.07 16.3 5 2 2.1 1" 55 1,2 +�+U <br /> m0 <br /> Z. <br /> 2-31 CONSULT 210,CONSULT 211 TITUS DESV 8 190 0.21 29.7 5 2 2.1. 1" 55 1,2 <w <br /> 2-32 OFFICE 212,BREAK 213,HALL TITUS DESV 8 500 0.21 29.7 5 2 2.1 1" 55 1,2 Ez LL-z8 <br /> Oz.o:f <br /> NOTES: <br /> 1.EXISTING SINGLE DUCT VAV WITH HOT WATER REHEAT COIL VAV SET TO CONSTANT VOLUME.REBALANCE TO AIRFLOW LISTED. ♦sue°I <br /> 2.HOT WATER COIL FLOWS BASED ON SCHEDULE FROM 1992 NORTH WING EXPANSION PROJECT.FLOWS INDICATED MEET OR EXCEED MINIMUM REQUIREMENT FOR NEW SPACE. CONTROL VALVE TO MODULATE TO MAINTAIN SPACE SET <br /> POINT. <br /> 2727 Oakes Ave. <br /> Suite 100 <br /> Everett,WA 98201 <br /> REVISIONS <br /> ASHRAE 62.1 VENTILATION CALCULTION <br /> ASHRAE 62.1 OUTDOOR AIR RATE DESIGN OUTDOOR AIR RATE <br /> OCCUPANT CFM/ CALCULATED AIR DISTRIBUTION REQUIRED O/A TO TOTAL SUPPLY PROVIDED O/A TO <br /> ROOM NAME AREA[ft2] COUNT DESCRIPTION PERSON CFM/SF O/A[CFM] EFFECTIVENESS ZONE[CFM] O/A PERCENTAGE AIRFLOW[CFM] ZONE[CFM] <br /> 201 WAITING AREA 320 8 Reception Areas 5 0.06 59 0.8 74 100% 155 155 <br /> 202 RECEPTIONIST 84 1 Reception Areas 5 0.06 10 0.8 13 100% 125 125 <br /> 203 OFFICE 87 2 Office Space 5 0.06 15 0.8 19 100% 65 65 <br /> 204 WORK 151 2 Office Space 5 0.06 19 0.8 24 100% 75 75 <br /> 205 HALL 185 Corridor 0 0.06 11 0.8 14 100% 35 35 �pla xa�9,E� <br /> 208 HALL 197 Corridor 0 0.06 12 0.8 15 100% 170 170 0 <br /> 212 OFFICE 135 2 Office Space 5 0.06 18 0.8 23 100% 70 70 FT <br /> 213 BREAK 140 Breakroom 5 0.12 17 0.8 21 100% 230 230 <br /> 214 PEDS GROUP THERAPY 240 16 Conference meeting 5 0.06 94 0.8 118 100% 250 250 59941�ep <br /> 216 ADULT GROUP THERAPY 519 20 Conference meeting 5 0.06 131 0.8 164 100% 425 425 1srR`� <br /> 1CNA7,�' <br /> 8122124 <br /> HEALTHCARE AIR CHANGE RATE CALCULATIONS <br /> ASHRAE 170 REQUIREMENTS DESIGN AIRFLOW CONDITIONS <br /> OUTSIDE AIR TOTAL Q <br /> FLOOR ROOM MIN.AIR MIN.AIR MIN.AIR MIN.AIR OUTSIDE TOTAL AIR J <br /> AREA VOLUME PRESSURE CHANGES FLOW CHANGES FLOW PRESSURE AIR SUPPLY EXHAUST RETURN CHANGES 0 <br /> ROOM NAME FUNCTION OF SPACE SO.FT. CU.FT. RELATIONSHIP AC HR CFM AC R CFM RELATIONSHIP CFM CFM CFM CFM (AC AR) <br /> 206 ADA RESTROOM Patient Toilet Room 59 468 N 0 0 10.0 78 N 0 0 130 0 1 16.7 ( 1 I . I <br /> 209 CONSULT Patient Rao. 155 1243 - 2 41 4.0 83 - 85 85 0 85 4.1 W 210 CONSULT Patierd Rao. 175 1404 - 2 47 4.0 94 - 95 95 0 95 4.1 <br /> 211 CONSULT Patent Room 178 1424 - 2 47 4.0 95 - 95 95 0 95 4.0 I <br /> J <br /> U_ Q <br /> DIFFUSER AND GRILLE SCHEDULE m <br /> U 0 <br /> MARK TYPE NECK SIZE NO BASIS OF DESIGN REMARKS <br /> CD-1 CEILING DIFFUSER SEE PLANS 25 TITUS MOD MODULAR CORE DIFFUSER,LAY-IN <br /> RG-I CEILING EXHAUST GRILLE, SEEPLANS 25 TITUS 350FL ALUMINUM,LOUVERED,3/4-BLADE SPACING,W � m N <br /> ALUMINUM DEFLECTION,LAY-IN W L,J u c <br /> N <br /> U m m" <br /> N M <br /> LLJa <br /> xa <br /> 0 o` <br /> W y <br /> > 09 <br /> 0 0 U or <br /> LL��� <br /> W <br /> 242095 <br /> aeAwN CEI <br /> ON <br /> PERMIT SET <br /> 08/22/24 <br /> MECHANICAL <br /> SCHEDULES <br /> M0.3 <br />