My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1010 N BROADWAY 2024 STARBUCKS Plans 2025-07-02
>
Address Records
>
N BROADWAY
>
1010
>
STARBUCKS
>
Plans
>
1010 N BROADWAY 2024 STARBUCKS Plans 2025-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 7:02:53 AM
Creation date
6/16/2025 8:50:56 AM
Metadata
Fields
Template:
Address Document
Street Name
N BROADWAY
Street Number
1010
Tenant Name
STARBUCKS
Permit
B2311-026
Year
2024
Notes
TI EXISTING STARBUCKS CAFE, PARTITIONS, EQUIPT RELOCATION
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FRP WALL <br /> 16 GA.2 1/4"(57MM) STAINLESS WALL AND COVERING <br /> WIDE STAINLESS STEEL FASTENER SHEATHING <br /> TRANSITION STRIP PER PLAN STAINLESS STAPLE <br /> SCHLUTER OR POWDER COATED <br /> SEALANT ROUTE OUT TRANSITION <br /> FLOORING TO DEPTH STRIP <br /> 1/4"ECO-GRIP FASTENER <br /> CONCRETE FOF TRANSITION STRIP SPEEDFLEX <br /> SLAB TILE FLOOR ECO-GRIP ECO-GRIP BASE <br /> ECO-GRIP FLOORING PER PLAN <br /> SEALANT CAP.COLOR TO <br /> TILE FLOOR ECO-GRIP FLOORING MATCH ECO-GRIP <br /> PER PLAN S°AB RETE 7 FLOORING ©2022 S—BUCKS COFFEE COMP— <br /> SE LOPE I I SF� <br /> STARBUCKS® <br /> 2401 UTAH AVENUE SOUTH <br /> =:�-�:..*��;:;: �::•:' SEATTLE,WASHINGTON 98134 <br /> •:i- - ECO-GRIP 206 318-1575 <br /> EPDXY <br /> ECO-GRIP ADHESIVE THESE DRAWINGS AND THE PROJECT MANUAL <br /> ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> ECO-GRIP EPDXY SUBSTRATE MAY REQUIRE SLOPING ECO-GRIP EPDXY SOLE PROPERTY OF STARBUCKS <br /> SEALANT ADHESIVE TO ADJUST HEIGHT SO THAT ECO-G RIP ADHESIVE CONCRETE CORPORATION,WHICH IS THE OWNER OF THE <br /> LEAD ANCHOR SUBSTRATE MAY REQUIRE AND ADJACENT FLOOR ARE FLUSH ,/q�� SLAB COPYRIGHT IN THIS WORK.THEY SHALL NOT <br /> SLOPING TO ADJUST HEIGHT (6MM) SHARED WIBE TH THIRD DUCED(PARTIES OR USED IN PARANY <br /> N WHOLE OR IN <br /> SO THAT ECO-GRIP AND THIS DETAIL APPLIES TO FLOOR AREAS BELOW FIXTURES AND EQUIPMENT ONLY ROUTED ECO-GRIP MANNER ON OTHER PROJECTS D I ADJACENT FLOOR ARE FLUSH COVE FLOORING EXTENSIONS TO THIS PROJECT WITHOUT THE <br /> PRIOR WRITTEN CONSENT OF STARBUCKS <br /> CORPORATION.THESE DRAWINGS AND <br /> TO <br /> ECO-GRIP TO TILE TRANSITION AT FOOT TRAFFIC AREA CO-GRIP TO TILE TRANSITION (FIXTURES & EQUIPMENT) "' ESS <br /> SPECIFICATIONSDESIGN I TENTFOR TORE HAIPROTOTYPICAL <br /> STAR- - - - <br /> sw.:12"=1'-0" sole:12"=V-0" CHANGE AT ANYTIME)AND DO NOT REFLECT <br /> ACTUAL SITE CONDITIONS.NEITHER PARTY <br /> nECO-GRIP-BASE CAP WITH FRP SHALL HAVE ANY OBLIGATION NOR LIABILITY TO <br /> THE OTHER(EXCEPT STATED ABOVE)UNTIL A <br /> WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> BOTH PARTIES. <br /> STARBUCKS TEMPLATE VERSION:12021.10.22 <br /> ARCHITECT OF RECORD <br /> STOREFRONT DOOR <br /> WITH THRESHOLD <br /> WALK-OFF MAT PER GRAPHITE <br /> SCHEDULE MOP SINK <br /> STAINLESS STEEL 1/8"(3MM)GAP GRAPHITE DESIGN GROUP,LLC,ARCHITECTS <br /> ANGLE BETWEEN ECO-GRIP 1/4"(6MM)ECO-GRIP 1807 7TH AVENUE,SUITE 700 <br /> ECO-GRIP FLOORING AND SPEEDFLEX SEATTLE,WA98101 <br /> TILE FLOOR PER COLOR MATCHED SPEEDFLEX FIXTURE (206)224-3335 <br /> SCHEDULE ECO-GRIP STAINLESS STEEL ECO-GRIP <br /> FLOORING FLANGE FLOORING <br /> PER TILE 2 ECO-GRIP EPDX FLOOR SINK <br /> ADHESIVE GRATE CONCRETEADHESIVE EPDXY <br /> MFR. REGI D <br /> 'I SLAB <br /> MARTIN LEE HILL <br /> �� STATE OF WASHINGTON <br /> CONCRETE <br /> WATERPROOF MEMBRANE SLAB - <br /> ON WOOD SUBFLOOR ONLY <br /> (n)TRANSITION-TILE TO WALK OFF MAT G ECO-GRIP TO FLOOR SINK TRANSITION ECO-GRIP AT MOP SINK <br /> 12"=V-0" - 5 <br /> Ewe:12"=V-0" _ T <br /> O <br /> OZf j00 <br /> 00 <br /> THINSET Q Q Q <br /> WALL AND WALL TYPE PER LEGEND >> <br /> SHEATHING WALL TILE PER PLAN WALL TYPE PER LEGEND Lu W 0 <br /> PER PLAN <br /> STAINLESS STAPLE Z 0 Q m <br /> OR POWDER <br /> O D R COATED FASTEZ <br /> ECO-GRIPOf <br /> W NON W O W <br /> SEALANT ECO-GRIP BASE SEALANT TO MATCH O Lr.yI_� Q r' <br /> MATCH ECOR TO GRIP ADJACENT WALL FINISH d W a O w <br /> FLOORING SEALANT TO MATCH - WALL TYPE PER LEGEND <br /> ADJACENT WALL FINISH <br /> 6"TILE BASE PER WATERPROOF MEMBRANE. STORE#: 22$17 <br /> SCHEDULE.ADHERE TO EXTEND 8"(150MM)UP WALL PROJECT#: 60007-039 <br /> 6"TILE BASE PER WALL PER MFR'S WALL TILE PER SCHEDULE ISSUE DATE: 10/27/2023 <br /> SCHEDULE.ADHERETO RECOMMENDATIONS. <br /> WALL PER MFR'S THINSET MORTAR(TVP.) DESIGN MANAGER: GRAPHITE <br /> ECO-GRIP RECOMMENDATIONS. 1/4"(6MM)RADIUS AT PRODUCTION DESIGNER: GRAPHITE <br /> EPDXY COVED BASE SCHLUTER-DILEX-AHK BRUSHED CHECKED BY: GRAPHITE <br /> ADHESIVE NICKEL ANODIZED ALUMINUM(ATGB) <br /> CONCRETE FINISH FLOOR PER FINISH FLOOR PER SCHEDULE Revlslon Schedule <br /> 1/4" SLAB SCHEDULE <br /> FINISH FLOOR PER PROVIDE UNCOUPLING MEMBRANE Rev Date By Description <br /> (6MM) SCHEDULE WHEN INSTALLED OVER MOISTURE <br /> ROUTED ECO-GRIP SENSITIVE SUBSTRATE <br /> COVE FLOORING <br /> CONCRETE SLAB <br /> SHEETTITLE: <br /> INTERIOR DETAILS- <br /> 7 ECO-GRIP - BASE AT TILED WALL STILE BASE @ WOOD PANEL l q/TILE BASE AT WALL r, I,WALL TILE TO FLOOR TILE TRANSITION FLOOR <br /> 1'-0"Ewe:6"= sw.:6"=1'-0" SCALE:AS SHOWN <br /> SHEET NUMBER: <br /> 1501 <br />
The URL can be used to link to this page
Your browser does not support the video tag.