Laserfiche WebLink
FLOOR SING SET <br /> ABOVE ECDGRP <br /> ECO-GRIP ASTE LIME <br /> FLOORHG f,—S <br /> RX�pL <br /> CONC.WILL C TRENCH SCREW W <br /> FOR BELOW GRADE !A <br /> UfLIlES M OUTLET AIR V/ <br /> TWICE TIE DUAETERRAIE.R. Siff VARIES <br /> OF INLET,MN. ORD�BlCi TO WASTE <br /> GRAVEL BNS6R1 <br /> M�ri TIDN OR ©2023 STARBUCKSNT OUTLET AS ALLOWEB I ND*GB CDT DNTE LINE TO Mktp STARBUCK ' <br /> REOIX IHr TaR 2835 N MCCARRAN BLVD#103 <br /> 3'T/l PECE OR-GREASE <br /> CONT.FRP TO SPARKS,NEVADA 89431 <br /> CEILING ON BACK n FLOOR SINK DETAIL ^ AIR BREAKER DETAIL (775)331-8551 <br /> WALL OVER IN T NOT TO SCALE , •; <br /> WALL BLOCKING MIT TO SCME U THESE DRAWINGS AND THE PROJECT MANUAL <br /> ARE CONFIDENTIAL AND SHALL REMAIN THE <br /> SUPPORT <br /> ICE P TO WATER = SOLE PROPERTY OF STARBUCKS <br /> SCE HEATER TANK. CORPORATION,WHICH IS THE OWNER OF THE <br /> TRANSPORT SEE WATER COPYRIGHT IN THIS WORK.THEY SHALL NOT <br /> TUBEFASTENED TO HEATER TANK BE REPRODUCED(IN WHOLE OR IN PART), <br /> WALL OR CEILING ` SHARED WITH THIRD PARTIES OR USED IN ANY <br /> t6 W/O.C. IN. NG([i)48" DETAIL FOR r MANNER ON OTHER PROJECTS OR <br /> w <br /> .MIN. MORE 3'-3"915MM INFORMATION. ( ) EXTENSIONS TO THIS PROJECT WITHOUT THE <br /> ICE DIVERTER V� PRIOR WRITTEN CONSENT OF STARBUCKS <br /> ICE TRANSPORT <br /> VALVE TUBE LANE 1,TO GFCI 120V BOOSTER PUMP. CORPORATION.THESE DRAWINGS AND <br /> ICE DISPENSER. RECEPTACLE SECURETO Z SPECIFICATIONS ARE INTENDED TO EXPRESS <br /> ICE TRANSPORT MAX LENGTH 75', FOR BOOSTER SHELF BELOW DESIGN INTENT FOR A PROTOTYPICAL <br /> TUBE BETWEEN ICE IN.SLOPE 1/4"A' PUMP WITH BOLTS p STARBUCKS STORE(WHICH IS SUBJECT TO <br /> MACHINE AND THROUGH BASE CHANGE AT ANYTIME)AND DO NOT REFLECT <br /> DNERTER VALVE. PLATE ACTUAL SITE CONDITIONS.NEITHER PARTY <br /> MAX.LENGTH 10' ICE TRANSPORT SHALL HAVE ANY OBLIGATION NOR LIABILITYTO <br /> (3M) TUBE LANE 2,TO OUT TO THE OTHER(EXCEPT STATED ABOVE)UNTIL A <br /> ICE BIN.MAX WATER WRITTEN AGREEMENT IS FULLY EXECUTED BY <br /> LENGTH 75',MIN.SLOPE 1/4':1' FILTRATION BOTH PARTIES. <br /> SYSTEM <br /> ICE MACHINE p STARBUCKS TEMPLATE VERSION,12023.04.24 <br /> p ENGINEER'SHELF PER <br /> d DRAWINGSS LL ARCHITECT OF RECORD <br /> ICE HEAD ADAPTER <br /> IN TOP SENSOR <br /> DISTRIBUTION UNIT Q ow,..,ve,nnm..,,e�sn�.a�m...m,sa�amasemas�nx+oc.A <br /> ICE MANAGER <br /> CONTROL PANEL 2"(50MM) CITY W <br /> WATER IN <br /> MIN.CLEAR GRAPHITE DESIGN GROUP,LLC,ARCHITECTS <br /> Q 18077TH AVENUE,SUITE 700 <br /> SEATTLE,WA 98101 <br /> ICE BIN 1. ALL COMPONENTS DRAWN IN BOLD ARE GC RESPONSIBILITY. Z (206)224-3335 <br /> 2. ALL PIPING SHALL BE COPPER EXCEPT PEX TYPE PIPING WHICH IS ACCEPTABLE BETWEEN FILTER SYSTEM COMPONENTS AND ADVANSYS <br /> DISHWASHER WHERE ALLOWED BY CODE. W INDIRECT DRAIN 3. POSITION BOOSTER PUMP SO THAT PRESSURE GAUGE IS READABLE AND ACCESSIBLE FOR TROUBLESHOOTING AND MAINTENANCE. <br /> LINE FROM ICE 4. BOOSTER PUMP STATIC AND DYNAMIC OUTLET PRESSURE SHALL BE BETWEEN 65 TO 70 PSI.VERIFY PER PUMPS INTEGRAL PRESSURE GAUGE. Roy SC <br /> MACHINE TO FLOOR 5. COORDINATE WITH ELECTRICAL CONTRACTOR FOR RECEPTACLES. n, <br /> DRAIN 6. ENSURE ALL PENETRATIONS THROUGH SURROUNDING WALLS AND CEILING ARE COMPLETELY SEALED. <br /> 7. PROVIDE VIBRATION DAMPENING AT BOOSTER PUMP MOUNT TO PLATFORM. m m <br /> INDIRECT DRAM ECO-GRIP COVER 'Z r <br /> LINE FROM ICE BASE <br /> DIVERTER TO aI <br /> FLOORDRAIN r vF 6 <br /> INDIRECT DRAIN BOOSTER PUMP-PLUMBING ONAL Data 10/Z5/YJ <br /> LINE FROM ICE BIN <br /> TO FLOOR DRAIN L COA fp609 <br /> Z <br /> HOT WATER TO DISHWASHER <br /> (IF OTHER THAN HOBART <br /> ADVANSYS UNIT),BAR SINKS, <br /> ELEVATION-PLUMBING DIAGRAM MOP SINKAND COMPARTMENT <br /> NOTE: <br /> SINK. <br /> I r N EXPANSION TANK V— <br /> DIRECT DRAIN MIN.RADIUS 1 <br /> ICE TRANSPORT TUB MIN.RADIUS=6' 1"(25MM)HOT WATER OUTLET BRASS CHECK J Q <br /> TEMPERED HOT WATERTO VALVE z L <br /> HAND SINKS 1"(25MM)) <br /> 0 00 <br /> 00 <br /> 6'(152MM)MIN. UNION(TYP. C r. <br /> CLEAR TO BACK BACK WALL CONCEALED OPPER PIPING(TYP.) p <br /> WALL CONT.FRP ON TEMPERATURE MIXING <br /> Chd <br /> BACK 4K4LL OVER VALVES OPEN CEILING ABOVE <br /> L WATER HEATER PER ` <br /> INDIRECT DRAIN IN WAL BLOCKING LOCAL CODE r O <br /> LINE FROM ICE HOT WATER TANK(SEE Z <br /> MACHINE TO FLOOR ICE MANAGER SPECIFICATIONS&HOT WATER Q TD 0/ <br /> DRAIN CONTROL PANEL TANK DETAIL FOR FURTHER LL <br /> INSTALLATION REQUIREMENTS O CONFIGURATION II W W M <br /> ICE HEAD ADAPTER ICE INVERTER ) COLD WATER TO C Q Q W <br /> W <br /> VALVE FLOW —► DISHWASHER Q Z <br /> ICE MACHINE C DIRECTION (IF HOBART //11 Z Q LLn/ <br /> ADVANSYS UNIT). Ei U U Q W <br /> ICE BIN STRAP UNITS PER LOCAL z0 SEE NOTE 2 BELOW. ' O W <br /> SEE PLUMBING REQUIREMENTS U <br /> PLAN FOR FINAL <br /> BOOSTER PUMP. d M a <br /> FLOOR DRAIN a SEE BOOSTER PUMP J LJJ - <br /> LOCATION AND u.o DETAIL FOR MORE <br /> TYPE INFORMATION. W STORE* 22817 <br /> SHELF PER PROJECT#: 60007-039 <br /> ACCESSIBLE PAN AND DRAIN LINE FOR ENGINEER <br /> C S ISSUE DATE: 10.2.2023 <br /> CONON CLEARANCE PANEL <br /> MAINTENANCE DRAWINGS <br /> W DESIGN MANAGER: GRAPHITE <br /> PAN <br /> 48 0 PRODUCTION DESIGNER: GRAPHITE <br /> CHECKED BY: <br /> NOTES: <br /> Z Revision Schedule <br /> PLAN-PLUMBING DIAGRAM 1. ALL COMPONENTS DRAWN IN BOLD ARE GC RESPONSIBILITY. Date By Description <br /> 2. ALL PIPING SHALL BE COPPER EXCEPT PEX TYPE PIPING WHICH IS ACCEPTABLE BETWEEN FILTER SYSTEM COMPONENTS AND ADVANSYS <br /> NOTE: DISHWASHER WHERE ALLOWED BY CODE. _ <br /> INDIRECNSPORTT DRAIN MIN.RADIUS.RADIUS <br /> 3. COORDINATE WITH ELECTRICAL CONTRACTOR FOR RECEPTACLES. /� <br /> ICE TRANSPORT TUB MIN.RADIUS=6" 4..ENSURE ALL PENETRATIONS THROUGH SURROUNDING WALLS AND CEILING ARE COMPLETELY SEALED.. V/ <br /> 'WATER HEATER IS EXISTING TO REMAIN,FOR REFERENCE ONLY W <br /> F9HET TITLE: <br /> UMBING DETAILS <br /> PLUMBING- - LE:AS SHOWN <br /> O �� NUGGET ICE PEDESTAL STACK WATER HEATER TANK-PLUMBING SHEET NUMBER: <br /> J scab:3/4"=1'-0" I scale:3/4"=1'-0" <br /> P201 <br />