My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7102 LOWER RIDGE RD 2025-07-15
>
Address Records
>
LOWER RIDGE RD
>
7102
>
7102 LOWER RIDGE RD 2025-07-15
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2025 10:49:04 AM
Creation date
6/16/2025 9:42:33 AM
Metadata
Fields
Template:
Address Document
Street Name
LOWER RIDGE RD
Street Number
7102
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: E2503-029 Description: EV WALL MOUNT CHARGER INSTALLED <br /> Applied:3/5/2025 Approved: 3/6/2025 Site Address: 7102 LOWER RIDGE RD UNIT A <br /> Issued:3/6/2025 Finaled: 3/26/2025 City,State Zip Code: EVERETT,WA 98203-4911 <br /> Status: FINALED Applicant:JIA HUANG <br /> Parent Permit: Owner:JIA HUANG <br /> Parent Project: Contractor: OWNER <br /> Details: <br /> LIST OF INSPE <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 3/12/2025 3/12/2025 ELEC 02-GROUND PAUL WEILAND CORRECTION eTRAKiT Inspection Request <br /> WORK REQUIRED <br /> Notes: <br /> 3/10/2025 9:48 AM JIA HUANG <br /> Contact Name:JIA HUANG <br /> Site Address:7102 LOWER RIDGE RD UNIT A <br /> Phone:2063260598 <br /> e-Mail:ivanhuang_1@hotmail.com <br /> Breaker most be listed for use in panel. #8 wire on 60 amp breaker should be 50 amp max <br /> 3/26/2025 3/26/2025 ELEC 10-FINAL** PAUL WEILAND APPRVD-PERMIT eTRAKiT Inspection Request <br /> FINAL <br /> Notes: <br /> 3/21/2025 9:00 AM JIA HUANG <br /> Contact Name:JIA HUANG <br /> Site Address:7102 LOWER RIDGE RD UNIT A <br /> Phone:2063260598 <br /> e-Mail:ivanhuang_1@hotmail.com <br /> prw changed Inspection Type from ELEC 02-GROUND WORK to ELEC 10-FINAL** <br /> Final is approved <br /> I_ <br /> Printed: Monday, 16 June, 2025 1 of 1 F� <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.