Laserfiche WebLink
a U <br /> a <br /> x <br /> UNIT 13 UNIT 12 UNIT 11 U <br /> UNIT 10 <br /> z <br /> 1'-BYz" I 1-0Yz 183 1'•BYz" 1'-BY2' 1' z" 1'�" 1'-0Yz" 1'•BTz' y F <br /> 16'-3" 16'-3" <br /> 4/SOB 41806 3 4/SO6 2• 4/S06 3 4/SOS - 4/SO6 3 4/SOB 4/S0B 3 4/SOS <br /> P R <br /> ————8 4/SS�— 6 S07 6 4/806, 6 S07 6 4PER <br /> 6 S07 6 4/S 8, 6 S07 B 4//SOB <br /> ——— --------- — ——— --------------- —31MPER <br /> _ --------_— —_----- -- SIM_ — BTL <br /> _ — ———————— --------- - <br /> ---- -- -- <br /> SW, "EXTEND CONIC. SW EXTEND CONIC E. --- -- _ -- ——————— -------- -- <br /> SW EXTEND CONIC. SW` EXTEND CONC. SW <br /> ` WALL THRU ) ,WALL THRU f <br /> ' ENGINEERING P.S. <br /> DEMISING SPACE - WMISINGALL U I 'WgLL THRU <br /> ' `DEMISING SPACE DEMISING SPACE DEMISING SPACE I <br /> „ <br /> 8�L 1 8'WALL <br /> 4 8"WALL -� `Q' L. HOLD DOWN SCHEDULE xr• ,4 0�• <br /> . I 8 WALL I <br /> W `4 SIMPSON DETAIL <br /> PLAN SIMPSON ANCHOR <br /> CALLOUT HOLDOWN BOLT TYP REFERENCFJ <br /> TYPE NOTES <br /> I- S07 CS18x48" 14/SO6 U.O.N. <br /> • pEBCRIPi10 pgTE <br /> SLAB-ON-GRADE P. 1 SLAB•ON-GRADE -I 3LAB-ON-GRADE ° - § O STRAP — PERMTBET mmrzou� <br /> 4 PER PLAN NOTE 1 `` 4 PER PLAN NOTE 1 R PLAN NOTE 1 - SLAB-ON-GRADE N <br /> S07 ` (ELEV.VARIES) S07 ` (ELEV.VARIES - 4 PER PLAN NOTE 1 - (2 CS16x48" <br /> cttcoMMErvra gsrnrz <br /> . ) I, S07 , P(ELEV.VARIES) S07 O ) - 14/SOB U.O.N. <br /> REuslory ttnbrsoas <br /> (ELEV.VARIES) I. STRAPS <br /> (3)STRAP 8" - 141808 U.O.N. <br /> I <br /> a <br /> NOT USED <br /> I I' O <br /> - S a ° 'n B h _8 • ° -:. _ . _ I 6 15'-5" <br /> . } <br /> OO VERTICAL _- B1E7A/3M0 T7 OU.POO.NS.T3'-10Yz 3'10Yz HTS30 <br /> 0Y" T-10Y" <br /> s <br /> O <br /> STHD14 Z <br /> ° <br /> L'- -_-� - -?- --T ----- - ---- z <br /> I I Q <br /> -—-•: ° ,-.; — I SB'/e">Q4 18/S07 U.O.N. Q <br /> NDU&SDS25 Q <br /> o `" II ." • _., = 13 �"�*�I ^ " I "'.I �' 13 - �. I. � ° 13 I' ,I` 1 , i'n I. � O I z <br /> a _ II <br /> cr <br /> 4 = / LL <br /> I.• <br /> \ 14 Ir7" t�� 'PERK-ON-GRADE Sol �. S07 kr L - 14 _ <br /> TOTE 1_ I PLAN NOTE 1 SLAB-ON-GRADE - - - S07 - tR <br /> -ON-GRADETE 1 PER PLAN NOTE 1BADE SLA _T PER PLAN NOT_ " _ .�'..__— LL _ LAN NOTE <br /> ILP <br /> 7 e X <br /> 14 ° 1 _x <br /> ' l- ° 4 <br /> S07.. I - S07 { .. - .. 307 - - 1 1O4 <br /> S07 iq <br /> 4'-2Yz" 4'-0Ya 4'-OYa 4 2Y" 11'-1Y1, ` <br /> P I I <br /> 4'•2Yz' 4'-0)'< 4'-0Y" 4'2Y 11'Os/n" i <br /> .. <br /> =: <br /> I I <br /> L S07 <br /> 15 J <br /> --_ — ------ —_ - --.-- - -. J S07 —. Z <br /> -- — — ----- -- <br /> 7 7 7 7 6 7 7 7 7 B 7 H 0 <br /> B <br /> TO TO TO TO TO 6 <br /> POST POST S07 POST POST S07 POST POST S07 TD TO S07 TO > <br /> POST POST POST FOUNDATION PLAN NOTES: � LI,, <br /> 1. lab- ".I-shall be f ick,u.o.n. labsha a poured over vapor arrlar place ova reining gmnu ar Ill per (/J <br /> Geotechnical Report.One or more of the following should be considered(but ere not required)to control slab cracking: <br /> • Fibrous admixture UJ <br /> • 6x6 W1.4xW1.4 WWM at canter <br /> • Controljohns <br /> 7✓ <br /> See Architectural Drawings for slab depression and slope requirements. 0 <br /> 2. Provide Construction/Control Joint in Slab per Architectural Drawings.Areas shall be approximately square and 400-sf or less. <br /> 3. Bottom of Footings shall be set on competent,properly compacted Bearing Soil below Frost Depth. <br /> 5. Anchor Bolts for Exterior Stud Walls shall be in accordance with P1-6 of the Shear Wall Schedule of 1/SO6,u.o.n. <br /> LEGEND <br /> z 1'7"715AGC F10MC5 <br /> gX.X DETAIL CALL-OUT Bege H.—H-rthwwt <br /> 9505 191h Ave BE <br /> 11.5" 7'•11" 7'-11" 11'-5" ANCHOR BOLTS FOR SHEAR WALL ABOVE PER SCHEDULE OF 1/SD6 Suke 118 <br /> 11-5" T-11" T-11" Everett,WA 98208 <br /> 11-4Yz www.sagehomesnw.com <br /> SLAB-ON-GRADE PER PLAN NOTE 1 <br /> FOUNDATION WALL AND FOOTING JOB NO.: <br /> 22-447-02 <br /> 0 BEARING OR SHEAR WALL ABOVE <br /> PLOT DATE <br /> OFOOTING CALL-OUT SEE 2/SO7 08/29/2022 <br /> SW STEP STEM WALL DATE: OB/23/2022 <br /> SCALE: Ya"=1"0'. <br /> HOLD-DOWN TO WALL ABOVE PER SCHEDULE ON PLAN DRAWN: BDS <br /> CHCKD: RMH <br /> SHEET NO.: <br />