Laserfiche WebLink
DIAPHRAGM BOUNDARY <br /> 2z4 BLOCKING NAILING <br /> DIAPHRAGM BOUNDARY U <br /> NAILING 2x4 BEVELED BLOCKING W B <br /> w/(2)12d 6"oc O <br /> SHEATHING PER PLAN Cn <br /> W <br /> V�/ <br /> cx Fr-1 � <br /> z � <br /> JOISTS PER 7p\\LSL PER PLAN <br /> ALIGNED W/WALL <br /> A35 @ 18"ocSHEAR WALL EDGE NAILING MONO TRUSSES PER PLAN <br /> (SPLICE <br /> TOP P BTL <br /> (SPLICE PER <br /> HEADER PER 2x STUD WALL PER PLAN ENGINEERING P.S. <br /> (WHERE OCC HANGER PER TRUSS MFR <br /> SHEATHING PER 1/SO6 <br /> SEE SHEAR WALLS2 <br /> 019 FOR CALL-0UTS o+^+x^ <br /> 18 .COMMON 17 IN COMMON 16 <br /> I V N <br /> FM+Ion.O..YMN� <br /> 2x STUD WALL PER PLAN <br /> N DEBCWPTION DATE <br /> FACENAIL PER 1/SOB FACENAIL PER 1/SO8 2x STUD WALL PER PLAN PERM-8Ef C62W1... <br /> ur m. nrsoa <br /> een.lo tt <br /> DIAPHRAGM BOUNDARY SHEATHING PER 1/SO6 - SHEATHING PER 1/SOB <br /> NAILING DIAPHRAGM BOUNDARY <br /> NAILING <br /> SHEATHING SHEAR WALL EDGE NAILING SHEATHING <br /> PER PLAN PER PLAN <br /> SHEAR WALL EDGE NAILING '^ <br /> VJ <br /> J <br /> BEAM PER PLAN <br /> a <br /> JOISTS PER PLAN POST PER PLAN JOISTS PER PLAN <br /> POST CAP PER PLAN Q <br /> FLUSH BEAM PER PLAN FLUSH BEAM PER PLAN <br /> 15 14 13 12 11 <br /> x <br /> DIAPHRAGM DIAPHRAGM <br /> BOUNDARY NAILING BOUNDARY NAILING <br /> 1 <br /> SQUASH BLKG UNDER SQUASH BLKG UNDER cb <br /> POSTS/BUILT UP STUDS �i <br /> �=Ll- <br /> POSTS/BUILT UP STUDS 12d @ 6"oc <br /> ABOVE(MATCH AREA) ABOVE(MATCH AREA) N <br /> 12d THROUGH BOTTOM SHEATHING EDGE NAILING SHEATHING SHEAR WALL EDGE NAILING <br /> FLANGE EACH SIDE PER PLAN PER PLAN <br /> O 3 <br /> 0 p1 L <br /> SPLICE SHEATHING C <br /> SPLICE SHEATHING -Z 0 <br /> Z <br /> 3 <br /> JOISTS PER PLAN SHEAR WALL EDGE NAILING JOISTS PER PLAN SHEAR WALL EDGE NAILING y <br /> 2 <br /> G.W.B.SHEATHING i_ / N <br /> 1Y4"LSL RIM BOARD LI-I <br /> (13 LSL RIM BOARD L0� <br /> fq <br /> (BM PER PLAN AT SIM) <br /> JOISTS PER PLAN HEADER PER PLAN HEADER PER PLAN w <br /> 2x STUD WALL PER PLAN 2x8 PLATE W/12d @ 6"oc (WHERE OCCURS) (WHERE OCCURS) <br /> CONT.TOP PLATE <br /> (SPLICE PER 13/SOB) CONT.TOP PLATE 2x STUD WALL PER PLAN CONT,TOP PLATE 2x STUD WALL PER PLAN <br /> (SPLICE PER 13/SOB) (SPLICE PER 13/SOB) O <br /> SHEATHING PER 1/SO6 SHEATHING PER 1/SO6 <br /> 10 9 g 7 6 = <br /> AIR SPACE PER ARCH'L <br /> 1'�Y/SAGG HOMLS <br /> DO NOT CONTINUE <br /> SHEATHING OVER DIAPHRAGM BOUNDARY <br /> DEMISING WALL SPACE PANEL EDGE NAILING NAILING 3.9.Home.Wdh—t <br /> 9505 19th Av.SE <br /> DECKING PER ARCH'L <br /> Sidle 118 <br /> 1Yq'LSL BLOCKING FOR GWB SHEATHING PER PLAN SHEATHING NAILS 4"oC _..9.hom 820 <br /> 1Y4"LSL RIM BOARD LSL PER PLAN E.ATTACHMENT PER ARCH'L ALIGNED W/WALL <br /> SHEAR WALL EDGE NAILING <br /> h ____ _ JOB NO.: <br /> n <br /> ______ ____ 22-447.02 <br /> --_-_-_ SPLICE SHEATHING DECK JOISTS PER PLAN <br /> A35 24"oc,FULL JOISTS PER PLAN JOIST BLOCKING @ 48"oc <br /> LENGTH OF WALL PLOT DATE <br /> A35 18"oe ^ <br /> TOP FLUSH BEAM PER PLAN LUS28 HANGERS(ZMAX) 08Y29/2022 <br /> SHEAR WALL EDGE NAILING CONT.TOP PLATE SHEAR WALL EDGE NAILING SHEAR WALL EDGE NAILING 1+/4'LSL RIM BOARD PT 2x10 LEDGER W/(2) <br /> (SPLICE PER 13/SOB) SHEAR WALL EDGE NAILING AT DECK <br /> NO SHEATHING SPLICES ROWS SDWS22400DB DATE: 08/29/2022 <br /> SHEATHING AT BOTH SIDES SCREWS 12"oc, <br /> HEADER PER PLAN THIS AREA SCALE: Ye"-1'-0" <br /> SHEATHING PER 1/SO6 WHERE OCCURS PER PLAN STAGGERED <br /> (WHERE OCCURS) 2x STUD WALL PER PLAN <br /> @ SHEAR WALLS DRAWN: BOB <br /> SHEATHING PER 1IS06 2x4 BLOCKING SHEAR WALL EDGE NAILING CHCKD: RMH <br /> SEE 61SOB SHEAR WALLS SEE 7/SO8 SPLICE SHEATHING <br /> FOR CALL <br /> FOR CALL-OUTS (AS REO'D) FORCALLS-0UTS 1 SHEET NO.: <br /> C� IN COMMON 4 IN COMMON SHEAR WALL EDGE 2 IN COMMON 1 O(1 <br /> v NAILING V\ V8 <br />