My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
916 PACIFIC AVE 2021 Plans 2025-07-02
>
Address Records
>
PACIFIC AVE
>
916
>
Plans
>
916 PACIFIC AVE 2021 Plans 2025-07-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/2/2025 7:28:03 AM
Creation date
6/16/2025 10:54:48 AM
Metadata
Fields
Template:
Address Document
Street Name
PACIFIC AVE
Street Number
916
Permit
S2104-012
Year
2021
Notes
REBRANDING - REPLACEMENT OF EXTG SIGNS AT PROV REG MED CTR
Address Document Type
Plans
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CITY OF EVERETT <br /> REVIEWED FOR PERMIT <br /> Recommendation Book <br /> Site Group: <br /> WA009 Code Information <br /> Municipal Regulations Permit Requirements Notes: permitting 3-4 months without a <br /> 'Dire diligence does not Include landlord criteria.Those regulations are subject Are permits required at this site: Yes ❑ No❑ variance; WITH variance an additional <br /> to change upon submiunlorpemits and site plan approval processes. 2-3 months with Initial min cost $1,679 <br /> Special approval process for sign permits: Yes El No El for submittal <br /> Freestanding Ground Signs Does grandfathered status remain: Yes ❑ No❑ <br /> Allowed: Yes El No ❑ Estimated time to secure permits: see notes <br /> Require permit: Yes 0 No El Amount of time permits are valid for: <br /> Maximum height: 101 Estimated cost of permits: see notes <br /> Maximum area: 32 Separate permit required for electrical: Yes ❑ No❑ <br /> Size based on: Required for face replacement: Yes ❑ No El <br /> Light restriction: 110 <br /> Enforced by: Municipality ❑ Other ❑ Permits can be applied for via: ❑ Mail [] Online ❑ In Person <br /> Notes: changing like for like no permit needed unless Persons who can apply for permits: � Contractor r❑ Agent p Expediter <br /> electrical is included,electrical permit needed. License required for: ❑ Contractor ❑ Business <br /> Wall-Mounted Signs Signatures required on application: El Contractor 0 Agent Owner <br /> Allowed: Yes ❑ No❑ Documents required: Site Plan 0 Sign Details [D Elevations 0 Plot Plan 0 Sealed Engineering <br /> Require permit: Yes ❑ No EI <br /> Maximum height: <br /> Notes: <br /> Maximum area: Variance Procedures <br /> Size based on: permitting 3-4 months without a <br /> Light restriction: Estimated time to secure variance: ;Pp notes variance;WITH variance an additional <br /> Enforced by: Municipality 0 Other ❑ Amount of time variance is valid for: 2-3 months with initial min cost $1,679 <br /> Notes:[electrical <br /> hanging like for like no permit needed unless Estimated cost of variance: see notes for submittal <br /> is included, electrical permit needed. Frequency of board meetings: <br /> Likelihood of variance being allowed: ❑ Likely ❑ Unlikely <br /> Directlonals /Regulatory Signs Variances can be applied for via: ❑ Mail Online 0 In Person <br /> Allowed: Yes ❑ No❑ <br /> Require Permit: Yes ❑ No❑ Signatures required on application: E) Contractor r❑ Agent ❑ Expediter <br /> Maximum area: <br /> Must attend variance hearing: ❑ Contractor ❑ Agent ❑ Owner <br /> Notes: changing like for like no permit needed unless <br /> electrical is included, electrical permit needed. Documents required: Site Plan Sign Details 0 Elevations Plot Plan Sealed Engineering <br /> Hours when work Is permitted Landlord Criteria <br /> Notes: <br />
The URL can be used to link to this page
Your browser does not support the video tag.