Laserfiche WebLink
Bo <br /> CITY OF EVERETT <br /> EVERETT OFFICE USE ONLY <br /> WASHINGTON <br /> Permit Services Transmittal Date Received Stamp <br /> ECEDVE <br /> ' <br /> PERMIT/PROJECT#: B2304-046 thru B2304-052 DEC ) 1 2023 <br /> SITE ADDRESS: 3702 W Mukilteo Blvd Everett,WA 98203 f/AAOP --J <br /> PROJECT NAME: Harbor's Edge -+kk{/` CITY OF EVERETT <br /> b Y <br /> FROM: Vicki Harrison COMPANY:Sage-Harbor's Edge, LLC 0 Chr ngA i�Pe`rfngrC un tC T er ransrnittal <br /> D Plan Review Routing <br /> PHONE#: 425-231-7777 EMAIL: vickiasagehomesnw.com Location: DFile DReviewer Office <br /> Date Logged: By: <br /> Route to:(Check all that apply) Name of Reviewer Type of Review <br /> m Planning Reviewer Name:Dennis Osborne 0 Re-Review <br /> ❑Public Works Reviewer Name: m Revisions After Approval <br /> ❑Building Reviewer Name: ❑Revisions After Issuance <br /> AFire Reviewer Name: 0 Other <br /> Other Reviewer Name: 0 Other <br /> Provide quantities for all items submitted <br /> PLANS REPORTS/CALCULATIONS OTHER DOCUMENTS <br /> Qty Qty Qty <br /> 1 Architectural/Building Plans _ Geotechnical Report _ Correction Letter Responses <br /> 1_Structural Plans _ Drainage Report _ Draft Easement <br /> _Civil Plans _ SWPPP Report _ Recorded Easement <br /> _Site Plan _ Wetland Report _ Height Survey <br /> _ Landscape Plan _ Critical Area Report _ Base Elevation Survey <br /> _Survey _ Traffic Study/TDM Report _ Critical Area Covenant <br /> _ Elevations _ Structural Calculations _ Stormwater Covenant <br /> _ Floor Plans _ Height Calculations _ Covenant-Other <br /> _Special Inspection Report _ Plumbing Calculations _ Performance Guarantee <br /> _As-Builts _ Other _ Warranty Bond <br /> _ Plat Maps _ Other _ Other <br /> Original City Redlines Returned _ Other _ Other <br /> _ Other _ Other _ Other <br /> _Other _ Other _ Other <br /> Items submitted are: <br /> m Complete Plan Set Replacement 0 Additional Documents <br /> (Slip-sheeting not permitted) (To be added to file) <br /> Comments to Reviewer: FOR CHANGES IN SCOPE: <br /> ?.f, <br /> Revised Description of Work: <br /> Changed step in building to match <br /> administrative site plan. <br /> Revised Valuation: <br /> Signed: V�' l ri'S°w Date: 12/04/2023 <br />