Laserfiche WebLink
BTL <br />ENGINEERING <br />SPECIAL INSPECTION- EXTERIOR SHEAR <br />Date: <br />March 14, 2024 <br />To: <br />Sage Homes <br />Attn: <br />Kayla Cutting <br />From: <br />Aiden Bernhardt <br />Project: Harbors Edge Townhomes <br />BuildingB (4-Plex) <br />Pages: 2 <br />19011 WoodSno Road NE, Suite 100 <br />Woodinville, WA 98072-4436 <br />Phone: (425) 8148448 <br />Fax: (425) 821-2120 <br />BTL Engineering has pe£ormed Special Inspection as required by the City of Everett for shear walls with edge <br />nailing at T' on center or less for the abovementioned project. The following Special Inspection Report includes a <br />summary of our site visit <br />Construction Documents: <br />❑ Construction set dated12/13/2023 <br />Progress of construction: <br />❑ Date of inspection: 03/11/2024 <br />❑ Foundation completed <br />❑ Framing completed <br />Items observed: <br />3rd Floor Exterior Walls: <br />❑ Front P1-4 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction conforms to plan set. <br />Note: (4) instances of the exterior wall sheathing not running through the specified comer were <br />observed at inspection. Builder has been notified and has provided pictures of the <br />resolution. Construction conforms to plan set. <br />Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />2^d Floor Exterior Walls: <br />❑ Front P1-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: <br />Note: (8) instances of the exterior wall sheathing not running through the specified comer were <br />observed at inspection. Builder has been notified and has provided pictures of the <br />resolution. Construction conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans. Construction conforms to plan set. <br />1n Floor Exterior Walls: <br />❑ Rear P2-2 Exterior Shear Wall (All units) <br />o Edge Nailing and Sheathing Splices: Construction Conforms to plan set. <br />o Plate Nailing and Framing Clips as specified on plans: <br />Note: (6) instances of straps and bloclang above garage pier per detail 4/S06 were not observed at <br />inspection. Builder has been notified and has provided pictures of resolution. Construction <br />conforms to plan set. <br />o Anchor bolt spacing Construction conforms to plan set. <br />Note: Interior P2-2 sheathing panels were not observed at time of inspection. A follow up letter will be <br />provided when panels have been sheathed and nailed. <br />