|
1 I 2 I 3 I 4 I 5
<br /> GENERAL NOTES
<br /> 1. INSTALLATION TO BE IN ACCORDANCE WITH THE STRUCTURAL DESIGN AND rii
<br /> U CALCULATIONS OF THE STRUCTURAL ENGINEER.
<br /> •
<br /> .,
<br /> _ --
<br /> 2. NEW PORTABLE CLASSROOMS ARE TO BE CONNECTED TO THE MAIN FIRE
<br /> - ALARM SYSTEM.
<br /> — — —— — — — —— —— — — _ _ — — 3. RAMP SHALL CONFORM WITH THE WASHINGTON STATE BARRIER FREE DESIGN
<br /> DYKEMAN
<br /> -___ _ ,_ REQUIREMENTS AND APPLICABLE FEDERAL,STATE AND LOCAL CODES AND
<br /> -"_- .- REGULATIONS.
<br /> \ I 4. PROVIDE AN UNDER FLOOR ACCESS PANEL WITH A MINIMUM CLEAR OPENING ARCHITECTURE + DESIGN
<br /> \, --_ WIDTH OF IB"x24".THE OPENING MUST BE COVERED WITH A DOOR OR SCREEN.
<br /> s
<br /> •
<br /> -- O _ 5. PROVIDE UNDER FLOOR VENTILATION AT THE RATE OF SQUARE FOOT NET D
<br /> D
<br /> -- FREE AREA FOR EACH 150 SQUARE FEET OF UNDER FLOOR AREA.VENTS ARE
<br /> __ ___ TO BE LOCATED TO PROVIDE CROSS VENTILATION.COVER VENTS WITH 1/4"
<br /> ._ ---.- _ CORROSION RESISTANT WIRE.
<br /> EXISTING - \ -
<br /> ~ GRASSii
<br /> ' ¢ ...____ —____ `•__...
<br /> Lji
<br /> m ... FINAL FIELD APPROVAL TOGETHER WITH ISSUANCE OF A CERTIFICATE OF CONSULTANT:
<br /> F, -- OCCUPANCY PRIOR TO THE BUILDING BEING OCCUPIED.
<br /> 7. AN APPROVED SET OF PLANS SHALL BE KEPT AT THE JOB SITE AT ALL TIMES
<br /> w DURING CONSTRUCTION.
<br /> O 8. PLACE ONE TYPE 2A-108C FIRE EXTINGUISHER IN EACH PORTABLE,MOUNT AT
<br /> 5'-0"TYP.
<br /> MAX.54"AFf AND PLACE ADJACENT TO DOOR.
<br /> W
<br /> m 20'-0"MIN.
<br /> / / 9. ROOF DRAINAGE TO BE VIA ALUMINUM GUTTERS AND(4)DOWNSPOUTS AT EACH
<br /> - y
<br /> --W- •^•••••••••••^-••---^��---------•-•-----••••,,,,•,,,,,,,,,,,,,,,v,,,,.,,,,,,,,---- , r _I BUILDING
<br /> CORNER.THE
<br /> DRAINAGE.PROVIDE POSITIVE DRAINAGE AWAY FROM —
<br /> THE
<br /> ABLE
<br /> AND
<br /> ADJAC
<br /> j %////// -J ����i�������--I PORTABLE
<br /> ORTAB ECONTLACTOR TO PAIN TB BUILDING
<br /> SKIRT
<br /> STRUCTURES. REGISTRATION STAMPS:
<br /> in': 10 AND TRIM COLOR.
<br /> ACTOR TO PAINT BUILDING SKIRT TO MATCH EXISTING BASE
<br /> 8. 11.REMOVE ALL VEGETATION AND ORGANICS FROM BUILDING PAD AREA.BUILDING
<br /> 6"CRUSHED ROCK j PAD TO EXTEND 24"BEYOND FACE OF BUILDING AND 12"BEYOND FACE OF 6467 REGISTERED
<br /> BUILDING PAD TO j RAMPS,LANDINGS AND STAIRS.PROVIDE A6"THICK CRUSHED ROCK BASE. ARC HTTECT
<br /> ' P1 EXTEND 24"BEYOND y /'—
<br /> PROPOSED PORTABLE P2 FACE OF BUILDING P3 12.CONTRACTORS TO LOCATE,CAP AND FLAG ALL EXISTING IRRIGATION HEADS
<br /> 2T-8.5"X 32'-0.0" PROPOSED PORTABLE AND 12"BEYOND FACE OF RAMPS,TYP. PROPOSED PORTABLE LOCATED BELOW GRAVEL PAD FOR PORTABLES. T 0'V JAMS EWETT
<br /> 887 S.F. 2T-8.5"X 32'-0.0' 27'-8.5"X 32,0.0'
<br /> 887 S.F. 13.CONTRACTORS TO PROTECT ALL EXISTING IRRIGATION VALVES,LATERALS AND AT OF ASH GTON
<br /> FIRE EXTINGUISHER 887 S.F. MAIN LINES.
<br /> ASPHALT MOUNTED ON INSIDE
<br /> PAVING AS WALL NEXT TO
<br /> C NECESSARY DOOR,TYP. PROJECT IDENTIFICATION: C
<br /> FOR
<br /> ACCESSIBLE 10'X 105'LANDING,
<br /> ROUTE /4, , . . STAIRS,AND B'X Jackson ES
<br /> 30 RAMP WITH
<br /> ��fj.�jlj L MAX SLOPE 1:12� T _ ±
<br /> I , Portables
<br /> z_
<br /> Ei
<br /> 4 a RAMP D
<br /> N.
<br /> Everett Public vere u is
<br /> ...,�.�,.,...- _ _ ..,.,......•..____ ,/ I I � I Ilk Schools
<br /> AT
<br /> P4 3700 Federal Ave
<br /> PROPOSED PORTABLE Pa Everett WA 98201
<br /> 2T-8.5'X 32'-0.0' PROPOSED PORTABLE '
<br /> 887 S.F. 27'-8.5'X 32'-0.0" P6
<br /> /I� 887 S.F. PROPOSED PORTABLE PROPOSED PORTABLE PERMIT SET
<br /> (RELOCATED PORTABLE 3) (RELOCATED PORTABLE 4) ' 27,8.5"X 32,0.0" 2T-8.5"X 32'-0.0' 02/13/2024
<br /> ALIGN EDGE OF 887 S.F. 887 S.F.
<br /> I, (RELOCATED PORTABLE B) (RELOCATED PORTABLE C) This drawing is:
<br /> I EDGE OF P VEH
<br /> EDGE OF PAVEMENT
<br /> 1.CopyrThe Architects
<br /> ects Dykem en,Inc.
<br /> B I 2.The Architect's Instrument of Professional Service.
<br /> 3,For use on this project only.Obtain Architect's B
<br /> written permission for any other use or reproduction.
<br /> PROJECT NUMBER:
<br /> /, A. 2023-056
<br /> _- --___- REVISIONS:
<br /> 1
<br /> N. MARK DATE DESCRIPTION
<br /> --\ 5,0„ \
<br /> i WETLAND \
<br /> _----J i SETBACK.\ \\
<br /> i \
<br /> i� - 80.0„ \� N
<br /> ————� WETLAND /f N. EXISTING
<br /> BUFFER N.
<br /> \ \ GRASS
<br /> \ \
<br /> \ \ PROJECT TEAM:
<br /> \ \\ PRINCIPAL IN CHARGE:I KGS
<br /> \ \ PROJECT MANAGER: I ZAH
<br /> \ \
<br /> \ PROJECT ARCHITECT:I
<br /> \ \\ JOB CAPTAIN: I DDF
<br /> \ \ DRAWING TITLE: A
<br /> A \ �`_--_
<br /> \ PARTIAL SITE PLAN -
<br /> -- ------ PORTABLES
<br /> --- D 4' 8' 16' DRAWING NUMBER:
<br /> Scale:I/8"=1'-0"
<br /> PARTIAL SITE PLAN- PORTABLES NORTH AS 1 . 1
<br /> ED 1/8"=1'4'
<br /> 1 I 2I 3 I 4 I 5
<br />
|