My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3702 W MUKILTEO BLVD F HARBORS EDGE TOWNHOMES 2025-08-14
>
Address Records
>
W MUKILTEO BLVD
>
3702
>
HARBORS EDGE TOWNHOMES
>
3702 W MUKILTEO BLVD F HARBORS EDGE TOWNHOMES 2025-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 7:32:48 AM
Creation date
6/16/2025 2:27:17 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3702
Unit
F
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERETT <br />0 <br />Permit Number: P2404-061 <br />Applied: 4/25/2024 <br />Issued: 4/29/2024 <br />Status: FINALED <br />Parent Permit: B2304-051 <br />Parent Project: <br />Details: <br />New Plumbing <br />Permit Inspections <br />City of Everett <br />Approved:4/26/2024 <br />Finaled: 11/27/2024 <br />Description: Plumbing FOR NEW TOWNHOME HARBOR'S EDGE - UNIT F <br />Site Address: 3702 W MUKILTEO BLVD UNIT F <br />City, State Zip Code: EVERETT, WA 98203-1248 <br />Applicant: MAR PLUMBING LLC <br />Owner: SAGE HARBORS EDGE LLC <br />Contractor: JBAR PLUMBING LLC <br />SCHEDULED DATE <br />COMPLETED DATE TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />PLUMB 02- <br />4/30/2024 <br />4/30/2024 GROUND <br />JEFF M RHODE <br />APPROVAL <br />see notes <br />WORK/SLAB <br />Notes: <br />-inspection preformed while onsite for underground inspection on P2404-056 <br />8/22/2024 <br />8/22/2024 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- Finish connecting toilets to flow through sprinkler system. Static test at minimum on toilet supplies.- Garage hose bib supply is not connected at <br />vertical to horizontal above ceiling in downstairs bathroom. <br />8/26/2024 <br />F8/26/2024 <br />PLUMB 03-ROUGH <br />JASON <br />CORRECTION8/26/2024 <br />see notes <br />IN <br />MORRISSEY <br />REQUIRED <br />Notes: <br />- Finish connecting toilets to flow through sprinkler system. Static test at minimum on toilet supplies.- Garage hose bib supply is not connected at <br />vertical to horizontal above ceiling in downstairs bathroom. <br />8/30/2024 <br />F8/30/2024 <br />PLUMB 03--ROUGH <br />JEFF M RHODE <br />NOT READY <br />Notes: <br />9/5/2024 <br />9/5/2024 <br />PLUMB 03-ROUGH <br />JASON <br />APPROVAL <br />IN <br />MORRISSEY <br />Notes: <br />11/18/2024 <br />11/18/2024 <br />PLUMB 08-FINAL** <br />JASON <br />CORRECTION <br />see notes <br />MORRISSEY <br />REQUIRED <br />Notes: <br />Moved forward from 11/20/24 <br />Dishwasher drain and water supply are not connected. <br />I <br />Printed: Monday, 12 May, 2025 1 of 2 rk <br />SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.