My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3620 W MUKILTEO BLVD F HARBORS EDGE TOWNHOMES 2025-08-13
>
Address Records
>
W MUKILTEO BLVD
>
3620
>
HARBORS EDGE TOWNHOMES
>
3620 W MUKILTEO BLVD F HARBORS EDGE TOWNHOMES 2025-08-13
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2025 11:36:43 AM
Creation date
6/16/2025 2:47:05 PM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3620
Unit
F
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Record Pressures - Record static pressure, then flow both valves simultaneously ❑ ❑ ❑ <br />for 30 seconds and record residual pressure while flowing. <br />Static Pressure Residual Pressure <br />5. Amount of Water - Measure the amount of water flowed into a calibrated 55- ❑ ❑ ❑ <br />gallon drums. <br />Drum #1 Gallons Drum #2 Gallons <br />6. Calculate GPM - Verify flow rates meet or exceed required hydraulically calculated ❑ ❑ ❑ <br />gpm. <br />Total Gallons Flowed X2 = > Required gpm. <br />Final Inspection: <br />PASS FAIL N/A <br />7. <br />Schedule - A final inspection should be performed when the house is complete, <br />❑ ❑ ❑ <br />or nearly complete. <br />8. <br />Approved Plans - Approved plans on site? And all work completed per plans? <br />❑ ❑ ❑ <br />9. <br />Head Inspection - All sprinkler heads shall be uncovered, with escutcheons or trim <br />❑ ❑ ❑ <br />rings in place. For concealed heads, the cover plates shall be off. <br />10. <br />Obstructions - Verify that no architectural features have been constructed or <br />❑ ❑ ❑ <br />installed that will obstruct the coverage from the sprinkler discharge or result in a <br />change of sprinkler coverage. <br />11. <br />Protective Covers - Check to see that all protective coverings are removed for <br />❑ ❑ ❑ <br />sprinklers heads. <br />12. <br />Painted Heads - Ensure that sprinklers or cover plates on concealed sprinklers <br />❑ ❑ ❑ <br />have not been painted by anyone other than the sprinkler manufacturer. <br />13. <br />Verify Pressure Gauges - Verify that the pressure gauge provided on the riser is at <br />❑ ❑ ❑ <br />the minimum required pressure and ensure that the system is fully operational. <br />14. <br />NFPA 13D Report - The installer shall complete and sign the contractor's material <br />❑ ❑ ❑ <br />and test certificate prior to final approval of the system. <br />15. <br />Address - Verify that the address to the building is posted and in compliance with <br />❑ ❑ ❑ <br />the requirement for the City of Everett. <br />16. <br />Fire Department Access - Ensure that fire department access is posted and meets <br />❑ ❑ ❑ <br />the requirements for the City of Everett. <br />Fire Marshal's Office 1425.257.8100 1 everettwa.gov/fire I INFORMATION HANDOUT C-7 14.20.2020 1 Page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.