Laserfiche WebLink
permits, we have owner listed as contractor. If there is a contractor for this work, then we will <br />require their WA state contractor's license number and their City of Everett business license <br />number. Otherwise, if the homeowner is performing the work themselves, please let me know and I <br />can update the application. <br />LandandPermits.com is a licensed, bonded, and insured general contractor #LANDPCx774BZ <br />and will be the contractor of record. I am the contact and I have attached a copy of <br />the Everett business application that is awaiting issue. <br />With regards to utility permit U2211-049, I have marked that permit as "Denied" due to your <br />property being outside of City of Everett sewer limits. The property is connected to the Mukilteo <br />Water and Wastewater District so you will need to contact them for sewer requirements. <br />The owner is Submitting a cut and cap, permit application this week with Mukeliteo Water <br />Lastly, in your demolition permit application, you indicated that the property is connected to <br />electricity. In order to process your demolition permit, we will require you to apply for an electrical <br />permit for disconnect. This permit can be applied for and obtained online. Please note, if you are the <br />homeowner performing this work, you will need to complete our homeowner affidavit and include <br />it with your electrical permit application. Here is a link to the affidavit: <br />httos• //www everettwa gov/DocumentCenter/View/32102/Electrical-Application-Page-34-5- <br />2022.Otherwise, the electrical permit will need to be obtained by a licensed electrical contractor. <br />The service is disconnected and the application for temp power is getting submitted by a <br />licensed electrician <br />If you have any questions, please let me know and IT be happy to help. <br />