My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3700 FEDERAL AVE PORTABLE 4 JACKSON ELEMENTARY 2025-08-07
>
Address Records
>
FEDERAL AVE
>
3700
>
JACKSON ELEMENTARY
>
3700 FEDERAL AVE PORTABLE 4 JACKSON ELEMENTARY 2025-08-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2025 1:54:26 PM
Creation date
6/17/2025 7:17:56 AM
Metadata
Fields
Template:
Address Document
Street Name
FEDERAL AVE
Street Number
3700
Unit
PORTABLE 4
Tenant Name
JACKSON ELEMENTARY
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
190
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INSTRUCTIONS FOR USING <br /> 'lama 'Wag anchorsffffC MOBILE HOME PIERS <br /> / <br /> _• The manufactured home shall be installed and <br /> A1 leveled by qualified contracting personnel who <br /> are acceptable and licensed by the governing <br /> authority. Minute Man piers are designed to <br /> SUPPORT mobile homes and are not to be <br /> used for raising or lowering the home. <br /> 1 Minute Man piers should be placed directly <br /> undaiort eh d <br /> of theer homethem spacednsupp in accordanceframsonbot withsi the <br /> home manufacturer's instructions. <br /> MINUTE MAN ANCHORS 28726 <br /> TR#8524 <br /> RATED 6000 LBS 3 TO 1 SAFETY FACTOR <br /> RATED 8000 LBS 2.25 TO 1 SAFETY FACTOR <br /> 2"MAX EXTENSION <br /> WARNING!DO NOT USE TO JACK HOME <br /> MINUTE MAN PIER SET-UP PROCEDURES <br /> I Designed and manufactured for use under mobile and manufactured homes and commercial structures, <br /> the support pier is best suited to a dry environment. Minute Man piers are not recommended for use <br /> within 1500 foot of a coastline or in an application where the base of the pier would be immersed in <br /> water. All support piers must be attached to the I-beams with an appropriate pier head, to prevent <br /> horizontal movement. <br /> 2 Use hydraulic jacks or other suitable devices to level the chassis beam of the home. Be sure to use <br /> sufficient jacks and safety blocking to safely support the home before installing support piers. Level the <br /> chassis using a water level or other leveling device for accuracy. After the chassis is leveled using <br /> hydraulic jacks and levels, you may begin to install the support piers. <br /> 3 Using the appropriate pier for the installation, determine the pier height that will be best for each individual <br /> pier location and insure that the height to the bottom of the chassis beam is no greater than 36 inches. <br /> Insure that the pier caps are appropriate for the type of chassis beam or for the marriage line. <br /> 4 Prepare a level surface at the location of each pier. Use coarse sand or gravel, if necessary to prepare <br /> the surface so as to have full contact for the footing pad. The surface of the footing pad needs to be <br /> high enough to insure that the base of the support pier does not come into contact with any drainage <br /> water that may be present under the home. Do not set a footing pad on organic material. Use the <br /> appropriate type and size of footing pad for the load required. Refer to the home manufacturer's <br /> installation manual for specific loads and footing sizes; and to the governing authority in the locale in <br /> which you are installing. <br /> 5 Locate the support pier on the footing pad, making certain to center the support pier on the pier pad. <br /> Where required by local code, secure the support pier to the footing pad with appropriate fasteners. In no <br /> case are you to extend the threaded rod adjuster more than 2 inches. When more height is needed, use <br /> the next taller size support pier. Carefully align the support pier under the chassis beam or marriage line <br /> and install the pier head. Tighten and snug plus one-half turn. <br /> 6 Repeat this installation process with each pier. After all support piers are installed, you may then remove <br /> the safety blocking and hydraulic jacks used to initially level the chassis. <br /> 8. <br />
The URL can be used to link to this page
Your browser does not support the video tag.