My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP97 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />progress estimate end date. For work completed after all authorized 1 <br />working days are used, the adjustment will be based on the posted 2 <br />reference cost during which contract time was exhausted. 3 <br /> 4 <br /> Base Cost is selected from the website table based on the “Date 5 <br />Effective” that immediately precedes the contract bid opening date, and 6 <br />shall be a constant for all monthly adjustments. 7 <br /> 8 <br />Q = total tons of all classes of HMA paid in the current month’s progress 9 <br />payment. 10 <br /> 11 <br />“Asphalt Cost Price Adjustment”, by calculation. 12 <br />“Asphalt Cost Price Adjustment” will be calculated and paid for as described in this 13 <br />section. For the purpose of providing a common proposal for all bidders, the Contracting 14 <br />Agency has entered an amount in the proposal to become a part of the total bid by the 15 <br />Contractor. 16 <br /> 17 <br />END DIVISION5.RTF 18 <br /> 19 <br /> 20 <br />END DIVISION 5 21 <br /> 22
The URL can be used to link to this page
Your browser does not support the video tag.