My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP100 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />GLF 7-05.5.DOCX 1 <br />7-05.5 Payment 2 <br /> 3 <br />Section 7-05.5 of the standard specifications is deleted and replaced with the following: 4 <br /> 5 <br />(******) 6 <br />Payment will be made for each of the following bid items that are included in the proposal: 7 <br /> 8 <br />“Adjust Manhole to Grade”, per each. 9 <br /> 10 <br />“Adjust Catch Basin/Inlet to Grade”, per each. 11 <br /> 12 <br />“Adjust Valve Box to Grade”, per each. 13 <br /> 14 <br />The payment for “Adjust Manhole to Grade”, “Adjust Catch Basin/Inlet to Grade”, shall be 15 <br />full compensation for all costs necessary to make the adjustment including temporary 16 <br />cover to adjust the existing structure to required elevation, construction of the asphalt 17 <br />transition around the structure, and restoration of the adjacent area. Adjustment of any 18 <br />structures twice will be paid as one adjustment. 19 <br /> 20 <br />END DIVISION7.RTF 21 <br /> 22 <br />END DIVISION 7 23 <br /> 24
The URL can be used to link to this page
Your browser does not support the video tag.