My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP103 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />GSL 8-14 SDWK.docx 1 <br />8-14 CEMENT CONCRETE SIDEWALKS 2 <br />8-14.3 Construction Requirements 3 <br /> 4 <br />Section 8-14.3 shall be deleted and replaced with the following: 5 <br /> 6 <br />(******) 7 <br /> 8 <br />The concrete in the Cement Concrete Sidewalk shall be Commercial Mix in accordance 9 <br />with the requirements of Section 6-02, and as defined in the City of COE Standard 10 <br />Drawing No. 312. 11 <br /> 12 <br />8-14.3(1) Excavation 13 <br /> 14 <br />Section 8-14.3 (1) is supplemented with the following: 15 <br /> 16 <br />(******) 17 <br />It is expected there will be sufficient suitable native material excavated from various 18 <br />portions of the improvement to fill low areas in the sidewalk subgrade and planting 19 <br />strip area when needed and no further payment will be allowed for fill material. 20 <br />Where there is insufficient suitable native material on the project site, the 21 <br />Contractor shall furnish, place and compact CSBC meeting the requirements of 22 <br />Section 4-04 of these Specifications. 23 <br /> 24 <br /> 25 <br />8-14.4 Measurement 26 <br /> 27 <br />Section 8-14.4 is supplemented with the following: 28 <br /> 29 <br />(******) 30 <br /> 31 <br />Cement concrete sidewalk will be measured by the square yard of finished surface and 32 <br />will include the adjacent curb and gutter. 33 <br /> 34 <br />"Remove and Replace Cement Conc. Sidewalk and Type A-1 Curb and Gutter" per SY. 35 <br />Bid Items include the adjacent Curb, Curb and Gutter, and/or Pedestrian Curb as 36 <br />necessary to reconstruct sidewalk panels. 37 <br /> 38 <br />8-14.5 Payment 39 <br /> 40 <br />Section 8-14.5 is supplemented with the following: 41 <br /> 42 <br />(******) 43 <br /> 44
The URL can be used to link to this page
Your browser does not support the video tag.