Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP103 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />GSL 8-14 SDWK.docx 1 <br />8-14 CEMENT CONCRETE SIDEWALKS 2 <br />8-14.3 Construction Requirements 3 <br /> 4 <br />Section 8-14.3 shall be deleted and replaced with the following: 5 <br /> 6 <br />(******) 7 <br /> 8 <br />The concrete in the Cement Concrete Sidewalk shall be Commercial Mix in accordance 9 <br />with the requirements of Section 6-02, and as defined in the City of COE Standard 10 <br />Drawing No. 312. 11 <br /> 12 <br />8-14.3(1) Excavation 13 <br /> 14 <br />Section 8-14.3 (1) is supplemented with the following: 15 <br /> 16 <br />(******) 17 <br />It is expected there will be sufficient suitable native material excavated from various 18 <br />portions of the improvement to fill low areas in the sidewalk subgrade and planting 19 <br />strip area when needed and no further payment will be allowed for fill material. 20 <br />Where there is insufficient suitable native material on the project site, the 21 <br />Contractor shall furnish, place and compact CSBC meeting the requirements of 22 <br />Section 4-04 of these Specifications. 23 <br /> 24 <br /> 25 <br />8-14.4 Measurement 26 <br /> 27 <br />Section 8-14.4 is supplemented with the following: 28 <br /> 29 <br />(******) 30 <br /> 31 <br />Cement concrete sidewalk will be measured by the square yard of finished surface and 32 <br />will include the adjacent curb and gutter. 33 <br /> 34 <br />"Remove and Replace Cement Conc. Sidewalk and Type A-1 Curb and Gutter" per SY. 35 <br />Bid Items include the adjacent Curb, Curb and Gutter, and/or Pedestrian Curb as 36 <br />necessary to reconstruct sidewalk panels. 37 <br /> 38 <br />8-14.5 Payment 39 <br /> 40 <br />Section 8-14.5 is supplemented with the following: 41 <br /> 42 <br />(******) 43 <br /> 44