My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE 1 OF 5 CONTRACT <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> <br />CITY OF EVERETT, WASHINGTON <br /> <br />CONTRACT <br /> <br />THIS CONTRACT is made and entered into this _____ day of _____________, 2025, by and <br />between the City of Everett, Washington, a municipal corporation existing under the laws of <br />the State of Washington (the “City”) and <br />__________________________________________________________________________ <br />a ______________________________________ (the “Contractor”). <br /> <br />In consideration of the sums to be paid to it by the City, Contractor hereby covenants and <br />agrees to furnish all labor, tools, materials, equipment, and supplies required to complete in a <br />workmanlike manner the work, improvements, and appurtenances in accordance with the <br />Specifications and Plans and all other Contract Documents entitled: “2025 Federal Overlay, W <br />Mukilteo Blvd – Glenwood Ave to Dogwood Dr” (the “Project”). <br /> <br />1. Contract Documents. The following documents (“Contract Documents”) are incorporated <br />by reference and are hereby made a part of this Contract: <br /> <br />A. Notice to Contractors <br /> <br />B. Instructions to Bidders <br /> <br />C. Washington State Department of Transportation Standard Specifications 2025 as <br />modified by all amendments thereto as of the date of bid opening of this Project <br />(“Standard Specifications”). <br /> <br />D. Contract Provisions, including without limitation the Special Provisions <br /> <br />E. Plans, Drawings and Project Specifications <br /> <br />F. Addenda (if any) <br /> <br />G. Performance Bond and Payment Bond <br /> <br />H. Contractor’s Proposal/Bid (dated __________________ and copy attached hereto) <br /> <br />I. All provisions required by law whether set forth and reproduced herein or not. <br /> <br />J. Disadvantaged Business Enterprise (DBE) utilization certification. <br /> <br />A copy of the Contract Documents that were posted for the Project on Builder’s Exchange of <br />Washington (www.bxwa.com) as of Bid Opening Date is maintained by the City Clerk’s Office <br />as a single pdf and is available as follows: <br /> <br />Link to PDF <br /> <br />Contractor acknowledges that Contractor has downloaded and reviewed this pdf prior to <br />signing this Contract. City and Contractor agree that this pdf contains all posted Contract <br />Documents as of the Bid Opening Date. City and Contractor further agree that this pdf may <br />contain some other documents (such as Reference Information) that are not Contract <br />Documents. <br /> <br />2. Contract Time. Substantial completion shall be achieved within forty (40) working days <br />of the effective date of the Notice to Proceed. <br />
The URL can be used to link to this page
Your browser does not support the video tag.