My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
PAGE <br /> <br /> <br />2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> iv TOC FOR SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> <br />DIVISION 5 <br />SURFACE TREATMENTS AND PAVEMENTS <br /> Hot Mix Asphalt ------------------------------------------------------------------------------------ 68 <br /> Asphalt Cost Price Adjustment ----------------------------------------------------------------- 96 <br />DIVISION 7 <br />DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />SEWERS, WATER MAINS, AND CONDUITS <br />MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS ------------------------------- 98 <br /> Construction Requirements --------------------------------------------------------------------- 98 <br /> Adjusting Manholes and Catch Basins to Grade ------------------------------------------- 98 <br /> Adjusting Valve Boxes to Grade --------------------------------------------------------------- 99 <br />7-05.4 Measurement ------------------------------------------------------------------------------ 99 <br />7-05.5 Payment ------------------------------------------------------------------------------------ 100 <br />DIVISION 8 <br />MISCELLANEOUS CONSTRUCTION <br />RAISED PAVEMENT MARKERS --------------------------------------------------------------- 101 <br />MONUMENT CASES ------------------------------------------------------------------------------ 102 <br />8-13.1 Description --------------------------------------------------------------------------------- 102 <br />8-13.2 Vacant --------------------------------------------------------------------------------------- 102 <br />8-13.3 Construction Requirements ------------------------------------------------------------ 102 <br />8-13.4 Measurement ------------------------------------------------------------------------------ 102 <br />8-13.5 Payment ------------------------------------------------------------------------------------ 102 <br />8-14 CEMENT CONCRETE SIDEWALKS --------------------------------------------------- 103 <br /> Materials -------------------------------------------------------------------------------------------- 104 <br /> Fiber Optic Cable, Electrical Conductors, and Cable ------------------------------------ 104 <br />9-29.18 Vehicle Detector -------------------------------------------------------------------------- 105 <br /> Construction Requirements -------------------------------------------------------------------- 115 <br /> Signal Systems ----------------------------------------------------------------------------------- 115 <br /> Induction Loop Vehicle Detectors ------------------------------------------------------------ 115 <br />8-20.4 Measurement ------------------------------------------------------------------------------ 116 <br />8-20.5 Payment ------------------------------------------------------------------------------------ 117 <br />PAVEMENT MARKING ---------------------------------------------------------------------------- 118 <br />TEMPORARY PAVEMENT MARKING -------------------------------------------------------- 121
The URL can be used to link to this page
Your browser does not support the video tag.