Laserfiche WebLink
PAGE <br /> <br /> <br />2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> iv TOC FOR SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> <br />DIVISION 5 <br />SURFACE TREATMENTS AND PAVEMENTS <br /> Hot Mix Asphalt ------------------------------------------------------------------------------------ 68 <br /> Asphalt Cost Price Adjustment ----------------------------------------------------------------- 96 <br />DIVISION 7 <br />DRAINAGE STRUCTURES, STORM SEWERS, SANITARY <br />SEWERS, WATER MAINS, AND CONDUITS <br />MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS ------------------------------- 98 <br /> Construction Requirements --------------------------------------------------------------------- 98 <br /> Adjusting Manholes and Catch Basins to Grade ------------------------------------------- 98 <br /> Adjusting Valve Boxes to Grade --------------------------------------------------------------- 99 <br />7-05.4 Measurement ------------------------------------------------------------------------------ 99 <br />7-05.5 Payment ------------------------------------------------------------------------------------ 100 <br />DIVISION 8 <br />MISCELLANEOUS CONSTRUCTION <br />RAISED PAVEMENT MARKERS --------------------------------------------------------------- 101 <br />MONUMENT CASES ------------------------------------------------------------------------------ 102 <br />8-13.1 Description --------------------------------------------------------------------------------- 102 <br />8-13.2 Vacant --------------------------------------------------------------------------------------- 102 <br />8-13.3 Construction Requirements ------------------------------------------------------------ 102 <br />8-13.4 Measurement ------------------------------------------------------------------------------ 102 <br />8-13.5 Payment ------------------------------------------------------------------------------------ 102 <br />8-14 CEMENT CONCRETE SIDEWALKS --------------------------------------------------- 103 <br /> Materials -------------------------------------------------------------------------------------------- 104 <br /> Fiber Optic Cable, Electrical Conductors, and Cable ------------------------------------ 104 <br />9-29.18 Vehicle Detector -------------------------------------------------------------------------- 105 <br /> Construction Requirements -------------------------------------------------------------------- 115 <br /> Signal Systems ----------------------------------------------------------------------------------- 115 <br /> Induction Loop Vehicle Detectors ------------------------------------------------------------ 115 <br />8-20.4 Measurement ------------------------------------------------------------------------------ 116 <br />8-20.5 Payment ------------------------------------------------------------------------------------ 117 <br />PAVEMENT MARKING ---------------------------------------------------------------------------- 118 <br />TEMPORARY PAVEMENT MARKING -------------------------------------------------------- 121