Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP1 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />COE Intro OptionA.rtf 1 <br />INTRODUCTION TO THE SPECIAL PROVISIONS 2 <br /> 3 <br /> 4 <br /> 5 <br />(January 4, 2024 APWA GSP, Option A) 6 <br /> 7 <br />The work on this project shall be accomplished in accordance with the Standard Specifications 8 <br />for Road, Bridge and Municipal Construction, 2025 edition, as issued by the Washington State 9 <br />Department of Transportation (WSDOT) and the American Public Works Association (APWA), 10 <br />Washington State Chapter (hereafter “Standard Specifications”). The Standard 11 <br />Specifications, as modified or supplemented by these Special Provisions, all of which are 12 <br />made a part of the Contract Documents, shall govern all of the Work. 13 <br /> 14 <br />These Special Provisions are made up of both General Special Provisions (GSPs) from 15 <br />various sources, which may have project-specific fill-ins; and project-specific Special 16 <br />Provisions. Each Provision either supplements, modifies, or replaces the comparable 17 <br />Standard Specification, or is a new Provision. The deletion, amendment, alteration, or addition 18 <br />to any subsection or portion of the Standard Specifications is meant to pertain only to that 19 <br />particular portion of the section, and in no way should it be interpreted that the balance of the 20 <br />section does not apply. 21 <br /> 22 <br />The GSPs are labeled under the headers of each GSP, with the effective date of the GSP and 23 <br />its source. For example: 24 <br /> 25 <br /> (March 8, 2013 APWA GSP) 26 <br /> (April 1, 2013 WSDOTGSP) 27 <br /> (May 1, 2013 City of Everett COE GSP)Agency Special Provision 28 <br /> 29 <br /> 30 <br />Project specific special provisions are labeled without a date as such: 31 <br /> (*****) 32 <br /> 33 <br />Also incorporated into the Contract Documents by reference are: 34 <br />· Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted 35 <br />edition, with Washington State modifications, if any 36 <br />· Standard Plans for Road, Bridge and Municipal Construction, WSDOT Manual 37 <br />M21-01, current edition 38 <br />· Design and Construction Standards & Specifications for Development, City of Everett, 39 <br />current edition 40 <br /> 41 <br />Contractor shall obtain copies of these publications, at Contractor’s own expense. 42 <br /> 43 <br />DIVISION1.GR1 44 <br />Division 1 45 <br />General Requirements 46 <br /> 47 <br />fDESWORK1.docx 48 <br />(March 13, 1995) 49 <br />This Contract provides for the improvement of *** The construction of up to 2,794 tons of Hot 50 <br />Mix Asphalt, Class ½-inch, PG 64-22, two inches (2”) thick, on selected City streets, including 51