Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP3 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />All references to “State Materials Laboratory” shall be revised to read “Contracting 1 <br />Agency designated location”. 2 <br /> 3 <br />All references to “final contract voucher certification” shall be interpreted to mean the 4 <br />Contracting Agency form(s) by which final payment is authorized, and final completion 5 <br />and acceptance granted. 6 <br /> 7 <br />Additive 8 <br />A supplemental unit of work or group of bid items, identified separately in the Bid 9 <br />Proposal, which may, at the discretion of the Contracting Agency, be awarded in addition 10 <br />to the base bid. 11 <br /> 12 <br />Alternate 13 <br />One of two or more units of work or groups of bid items, identified separately in the Bid 14 <br />Proposal, from which the Contracting Agency may make a choice between different 15 <br />methods or material of construction for performing the same work. 16 <br /> 17 <br />Business Day 18 <br />A business day is any day from Monday through Friday except holidays as listed in 19 <br />Section 1-08.5. 20 <br /> 21 <br />Contract Bond 22 <br />The definition in the Standard Specifications for “Contract Bond” applies to whatever 23 <br />bond form(s) are required by the Contract Documents, which may be a combination of a 24 <br />Payment Bond and a Performance Bond. 25 <br /> 26 <br />Contract Documents 27 <br />See definition for “Contract”. 28 <br /> 29 <br />Contract Time 30 <br />The period of time established by the terms and conditions of the Contract within which 31 <br />the Work must be physically completed. 32 <br /> 33 <br />Notice of Award 34 <br />The written notice from the Contracting Agency to the successful Bidder signifying the 35 <br />Contracting Agency’s acceptance of the Bid Proposal. 36 <br /> 37 <br />Notice to Proceed 38 <br />The written notice from the Contracting Agency or Engineer to the Contractor authorizing 39 <br />and directing the Contractor to proceed with the Work and establishing the date on which 40 <br />the Contract time begins. 41 <br /> 42 <br />Traffic 43 <br />Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and 44 <br />equestrian traffic. 45 <br /> 46