My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP13 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />Copies of the Contract Provisions, including the unsigned Form of Contract, will be 2 <br />available for signature by the successful bidder on the first business day following award. 3 <br />The number of copies to be executed by the Contractor will be determined by the 4 <br />Contracting Agency. 5 <br /> 6 <br />Within ** 20 ** calendar days after the award date, the successful bidder shall return the 7 <br />signed Contracting Agency-prepared contract, an insurance certification as required by 8 <br />Section 1-07.18, a satisfactory bond as required by law and Section 1-03.4, the Transfer 9 <br />of Coverage form for the Construction Stormwater General Permit with sections I, III, and 10 <br />VIII completed when provided. Before execution of the contract by the Contracting 11 <br />Agency, the successful bidder shall provide any pre-award information the Contracting 12 <br />Agency may require under Section 1-02.15. 13 <br /> 14 <br />Until the Contracting Agency executes a contract, no proposal shall bind the Contracting 15 <br />Agency nor shall any work begin within the project limits or within Contracting Agency-16 <br />furnished sites. The Contractor shall bear all risks for any work begun outside such areas 17 <br />and for any materials ordered before the contract is executed by the Contracting Agency. 18 <br /> 19 <br />If the bidder experiences circumstances beyond their control that prevents return of the 20 <br />contract documents within the calendar days after the award date stated above, the 21 <br />Contracting Agency may grant up to a maximum of ** 20 ** additional calendar days for 22 <br />return of the documents, provided the Contracting Agency deems the circumstances 23 <br />warrant it. 24 <br /> 25 <br />1-03.3.OptionB.RTF 26 <br />1-03.3 Execution of Contract 27 <br />(July 8, 2024 APWA GSP Option B) 28 <br /> 29 <br />This section is supplemented with the following: 30 <br />No later than 5 calendar days after the Award date (not including Saturdays, Sundays and 31 <br />Holidays), the successful Bidder shall provide DBE Trucking Credit Form(s) (WSDOT Form 32 <br />272-058) when trucking appears on the DBE Utilization Certificate (WSDOT Form 272-33 <br />056). The DBE Trucking Credit Form shall document how the DBE Trucking firm will be 34 <br />able to perform the scope of work subcontracted to them. 35 <br /> 36 <br />Trucking forms will be returned for correction. Trucking Credit Form(s) will not be included 37 <br />as part of the executed Contract. 38 <br /> 39 <br />DBE Trucking Credit Forms shall be submitted in one of the following ways: 40 <br />1. By E-mail 41 <br />*** 42 <br />Local Agency OEO representative – CJimenez@everettwa.gov 43 <br /> WSDOT Regional OECR Northwest Region – NWRegionOEO@wsdot.wa.gov 44 <br />*** 45 <br /> 46 <br /> 47 <br />1-03.4.RTF 48 <br />1-03.4 Contract Bond 49
The URL can be used to link to this page
Your browser does not support the video tag.