Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP15 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />1-04.2.RTF 1 <br />1-04.2 Coordination of Contract Documents, Plans, Special Provisions, 2 <br />Specifications, and Addenda 3 <br />(December 30, 2022 APWA GSP) 4 <br /> 5 <br />Revise the second paragraph to read: 6 <br /> 7 <br />Any inconsistency in the parts of the contract shall be resolved by following this order of 8 <br />precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth): 9 <br />1. Addenda, 10 <br />2. Proposal Form, 11 <br />3. Special Provisions, 12 <br />4. Contract Plans, 13 <br />5. Standard Specifications, 14 <br />6. Contracting Agency’s Standard Plans or Details (if any), and 15 <br />7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction. 16 <br /> 17 <br />1-04.4.RTF 18 <br />1-04.4 Changes 19 <br />(January 19, 2022 APWA GSP) 20 <br /> 21 <br />The first two sentences of the last paragraph of Section 1-04.4 are deleted. 22 <br /> 23 <br />f1-04.4(1).docx 24 <br />1-04.4(1) Minor Changes 25 <br />(May 30, 2019 APWA GSP) 26 <br /> 27 <br />Delete the first paragraph and replace it with the following: 28 <br /> 29 <br />Payments or credits for changes amounting to *** $25,000 *** or less may be made under 30 <br />the Bid item “Minor Change”. At the discretion of the Contracting Agency, this procedure 31 <br />for Minor Changes may be used in lieu of the more formal procedure as outlined in Section 32 <br />1-04.4, Changes. All “Minor Change” work will be within the scope of the Contract Work 33 <br />and will not change Contract Time. 34 <br /> 35 <br />1-05.GR1 36 <br />Control of Work 37 <br /> 38 <br />1-05.1.GR1 39 <br />Authority of the Engineer 40 <br /> 41 <br />1-05.1(2).GR1 42 <br />Requests for Information (RFI) 43 <br /> 44 <br />1-05.1(2).INST1.GR1 45 <br />The fourth paragraph of Section 1-05.1(2) is revised to read: 46 <br /> 47 <br />1-05.1(2).OPT1.2026.GR1 48 <br />(November 4, 2024) 49 <br />The Contractor may submit a RFI for one of the following reasons: 50 <br /> 51