Laserfiche WebLink
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP44 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br /> 1 <br />SILVER LAKE WATER DISTRICT 2 <br />ATTENTION: SCOTT SMITH 3 <br />DESK PHONE: (425) 337-3647 EXT. 216 4 <br />CELL PHONE: 5 <br />EMAIL: SSMITH@SLWSD.COM 6 <br />ADDRESS: 15205 41ST AVE SE 7 <br /> BOTHELL, WA 98201-6114 8 <br /> 9 <br /> 10 <br />SNOHOMISH COUNTY PUD #1 11 <br />ATTENTION: ANDRA SHAUGHNESSY FLAHERTY 12 <br />DESK PHONE: (425) 783-4419 13 <br />CELL PHONE: (425) 345-0312 14 <br />EMAIL: ALFLAHERTY@SNOPUD.COM 15 <br />ADDRESS: P.O. BOX 1107 16 <br /> EVERETT, WA 98206 17 <br /> 18 <br />WAVE/ASTOUND COMMUNICATION 19 <br />ATTENTION: JIM BIGGS 20 <br />DESK PHONE: (206) 786-8720 21 <br />CELL PHONE: 22 <br />EMAIL: JIM.BIGGS@ASTOUND.COM 23 <br /> WA-CONSTRUCTION@ASTOUND.COM 24 <br />ADDRESS: 4766 1ST AVE S 25 <br /> SEATTLE, WA 98134 26 <br />*** 27 <br /> 28 <br />f1-07.17.OPT2.FR1.docx 29 <br />(October 3, 2022) 30 <br />Locations and dimensions shown in the Plans for existing facilities are in accordance with 31 <br />available information obtained without uncovering, measuring, or other verification. 32 <br /> 33 <br />Public and private utilities, or their Contractors, will furnish all work necessary to adjust, 34 <br />relocate, replace, or construct their facilities unless otherwise provided for in the Plans or 35 <br />these Special Provisions. Such adjustment, relocation, replacement, or construction will 36 <br />be done during the prosecution of the work for this project. It is anticipated that utility 37 <br />adjustment, relocation, replacement, or construction within the project limits will be 38 <br />completed as follows: 39 <br /> 40 <br />*** Contractor shall, per specifications 7-05 and 8-13, Adjust Manhole to Grade, 41 <br />Adjust Catch Basin/Inlet to Grade, Adjust Water Valve Box to Grade, and Adjust 42 <br />Existing Monument Castings to Grade. *** 43 <br /> 44 <br />The Contractor shall attend a mandatory utility preconstruction meeting with the Engineer, 45 <br />all affected subcontractors, and all utility owners and their Contractors prior to beginning 46 <br />onsite work. 47 <br /> 48 <br />The following addresses and telephone numbers of utility companies or their Contractors 49 <br />that will be adjusting, relocating, replacing or constructing utilities within the project limits 50 <br />are supplied for the Contractor's use: 51 <br /> 52