My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Granite Construction Company 6/17/2025
>
Contracts
>
Capital Contract
>
Capital Construction Contracts and Change Orders
>
Granite Construction Company 6/17/2025
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2025 8:01:20 AM
Creation date
6/17/2025 7:42:44 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
Granite Construction Company
Approval Date
6/17/2025
Council Approval Date
6/11/2025
Department
Public Works
Department Project Manager
Gina Loring
Subject / Project Title
2025 Federal Overlay, W Mukilteo Blvd - Glenwood Ave to Dogwood Dr
Public Works WO Number
3842
Tracking Number
0004858
Total Compensation
$1,211,580.00
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
464
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
2025 FEDERAL OVERLAY, W MUKILTEO BLVD – GLENWOOD AVE TO DOGWOOD DR <br /> PAGE SP61 OF SP123 SPECIAL PROVISIONS <br />WORK ORDER #3842 April 15, 2025 FEDERAL AID# NHPP-2776(011) <br />The parties understand and agree that the Contractor’s failure to bring suit within the time 1 <br />period provided, shall be a complete bar to all such claims or causes of action. It is further 2 <br />mutually agreed by the parties that when claims or causes of action which the Contractor 3 <br />asserts against the Contracting Agency arising from the Contract are filed with the 4 <br />Contracting Agency or initiated in court, the Contractor shall permit the Contracting Agency 5 <br />to have timely access to all records deemed necessary by the Contracting Agency to assist 6 <br />in evaluating the claims or action. 7 <br /> 8 <br />1-09.13(3)A.RTF 9 <br />1-09.13(3)A Arbitration General 10 <br />(January 19, 2022 APWA GSP) 11 <br /> 12 <br />Revise the third paragraph to read: 13 <br /> 14 <br />The Contracting Agency and the Contractor mutually agree to be bound by the decision of 15 <br />the arbitrator, and judgment upon the award rendered by the arbitrator may be entered in 16 <br />the Superior Court of the county in which the Contracting Agency’s headquarters is 17 <br />located, provided that where claims subject to arbitration are asserted against a county, 18 <br />RCW 36.01.050 shall control venue and jurisdiction of the Superior Court. The decision of 19 <br />the arbitrator and the specific basis for the decision shall be in writing. The arbitrator shall 20 <br />use the Contract as a basis for decisions. 21 <br /> 22 <br />1-09.13(4).RTF 23 <br />1-09.13(4) Venue for Litigation 24 <br />(December 30, 2022 APWA GSP) 25 <br /> 26 <br />Revise this section to read: 27 <br /> 28 <br />Litigation shall be brought in the Superior Court of the county in which the Contracting 29 <br />Agency’s headquarters is located, provided that where claims are asserted against a 30 <br />county, RCW 36.01.050 shall control venue and jurisdiction of the Superior Court. It is 31 <br />mutually agreed by the parties that when litigation occurs, the Contractor shall permit the 32 <br />Contracting Agency to have timely access to all records deemed necessary by the 33 <br />Contracting Agency to assist in evaluating the claims or action. 34 <br /> 35 <br />1-10.GR1 36 <br />Temporary Traffic Control 37 <br /> 38 <br />1-10.2.GR1 39 <br />Traffic Control Management 40 <br /> 41 <br />1-10.2.INST1.GR1 42 <br />Section 1-10.2 is supplemented with the following: 43 <br /> 44 <br />1-10.2.OPT1.GR1 45 <br />(November 2, 2022) 46 <br />Work Zone Safety Contingency 47 <br />Enhancements to improve the effectiveness of the accepted traffic control plans to 48 <br />increase the safety of the work zones shall be discussed on a weekly basis between the 49 <br />Contractor and the Contracting Agency. Enhancements shall be mutually agreed upon by 50 <br />the Contractor and Engineer prior to performing any Work to implement the enhancement. 51 <br /> 52
The URL can be used to link to this page
Your browser does not support the video tag.