Laserfiche WebLink
((yy PVC I <br />�Kof I <br />rl Van&Associaic:s,lac. <br />Cyeoteehnloal Engineering . 6tvirenmentel EnG{neering <br />Construction Testing and Inspection <br />IOnIV2023 TA (Mum: <br />Field <br />Report NO 041010 1)FRIO I923MIW" <br />Sciaci <br />I RTATIODA 10121 Rverpn;en Way JURISDICTION: C uv oiEverett <br />MI.: kffNicecer WrA11WO, n.,. al.. ra.,...r.. Sul <br />A Kmmn and Av mKw,, Inc [epresenlalivc vriw rnt sha: today lur m;nca iel tosliny R�. inspee 5 I Ipon an as'iog on site met with <br />ccnnaclor:aut IOCali,)Il lc»ign ,�, ollar Iequ i rcl nem. wem noted, Will on site we did following inspection: <br />Adhesive Anetror: Contractor drilled to (ond )0 holes liorizouially on existing slob on gmdc sad i mdkd 03 dowels with <br />minimum cntbedn«:nt 6 inch (d,, 1)-ioull ()('. with cposy as per 1 S-502. <br />All lima~ mm elemted wish Elio appropriate woe brush and vacuum. Qosy used was itilli I IIT RY MR h3 wills an expiramn <br />date of (MM2021. An udcyu,ud nmonaat of opoxy is as used to cun,plcndy cue (;ac Ihr� rniltedded pnnioat of the dowels. All <br />aac'hors word innalled in mcordtutee with the N1Mal Nunn ON I)iMal Inmullaticn IOmni m" <br />Reinforcing Stead Placement: %Vc abscm,d iho pincenteni of rciniscmg sicel fur IISS colunm lo'ning. we vc1il ed the. <br />placemen(of aemfoaong steri iorsiu:, Made:, Cunm, y„ ing, ['alanurs, h p and mcn,l ussmll placentent- In ouropuuon, Elie <br />n infnachx;'nwl w.as placed m gcoerai conformance to the approved snucuna) plans and specit ientions (KcCir S-101, I/S-502). <br />Conemttt 19aeanaellh Iwo 3 -A& gals of (Miles) cnncrele was pnurcd Nt 1I.SS colmnn looting; hnd mix no. 026OAC6 with <br />mimtnunu dcea n comproscavc strength 4ti0i) psi at 28 days. 'I -he conae-ic hnd acccpinblc les el of air, hunp & o,tW uure. Thr- <br />a<a clete m,ts paared via N0weitmatow. One set of 4s8 cure concrete cylinder, wera cast. Rcfenelica: the concrete rtgrorl <br />09623533CR1019202341P. <br />-- <br />Revtowed 13y ASI'M `lest (f �_ Asset Numbcrtsl: <br />To the best of my knowledge, (lie above WAS performed in accordance with the approved plats, specifications and <br />regulatory requirements, <br />M iccs `ietvrm, like NVextern C-sited Ni:i(es <br />It i &01)I8,-)IN • PmikboOt'JS.>IV,•Ttuni 1";t}gi9.2SU(t <br />