Laserfiche WebLink
B2010-048—Plan Review Response <br /> March 9, 2021 <br /> 7. On Detail 5/S8,appears to be a special boundary element detail. Please verify that cross-ties are <br /> extending a minimum of 12" into the foundation, as it does not appear to be captured in the detail or <br /> shear wall elevations.ACI 318-1418.10.6.4. <br /> The cross ties in the boundary zones will extend 12"into the foundation. Detail5/S8 has been updated to <br /> show the cross ties continuing 12"into the foundation. <br /> If you have any further questions or comments please call our office at 206.523.0024. <br /> Sincerely, <br /> C. SC, <br /> Davido Consulting Group, Inc. All WAs/,,/ <br /> WT <br /> � <br /> 37334 1�7 <br /> Eric Maunder, PE Matthew C.Schmitter, PE,SESS/ONAL <br /> Structural Engineer IV Vice President/Principal <br /> Davido Consulting Group, Inc. <br /> Page 2 <br />