My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8102 EVERGREEN WAY EVERETT 4 CORNERS - BLDG A 2025-07-28
>
Address Records
>
EVERGREEN WAY
>
8102
>
EVERETT 4 CORNERS - BLDG A
>
8102 EVERGREEN WAY EVERETT 4 CORNERS - BLDG A 2025-07-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/28/2025 7:29:28 AM
Creation date
6/17/2025 9:22:40 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8102
Tenant Name
EVERETT 4 CORNERS - BLDG A
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
527
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> JOHNSON BRAUND INC. <br /> April 28, 2021 RECCEDVIE <br /> � <br /> APR 2 9 2021 <br /> James Bronder <br /> Associate Engineer CITY OF EVERETT <br /> City of Everett—Permit Services Permit Services <br /> 3200 Cedar Street <br /> Everett, WA 98201 <br /> RE: FOUR CORNERS APARTMENTS—BUILDING A <br /> COMMERCIAL BUILDING PERMIT- REVIEW LETTER#1 <br /> PERMIT# B2010-048 <br /> Mr. Bronder, <br /> We are submitting the following response to your Building Permit Review Letter dated February <br /> 26, 2021, together with two complete sets of revised drawings for your review and approval. The <br /> responses below are grouped and numbered per your original letter,which is attached for reference. <br /> Architectural <br /> 1. A multi-family residential unit is being constructed and is subject to the requirements of <br /> RCW 64.55. Please complete the RCW 64.55 Building Envelope Submittal worksheet. <br /> a. Response: See attached completed worksheet for Building A. <br /> 2. On Sheet A020, total on-site parking stalls provided(684 stalls) in an R-2 occupancy are <br /> greater than (20). Per IBC 427.2, 5%of the parking spaces are required to have electrical <br /> vehicle charging infrastructure. Please clarify and revise drawings as required as this <br /> infrastructure appears to be missing. IBC 427. <br /> a. Response: Locations for surface parking and garage EV charging infrastructure <br /> has been identified on A020 and on the garage level plan. <br /> Structural <br /> 3. See attached response letter from DCG. <br /> 4. See attached response letter from DCG. <br /> 5. See attached response letter from DCG. <br /> 6. See attached response letter from DCG. <br /> 7. See attached response letter from DCG. <br /> Additional revisions made in coordination with other disciplines. These revisions have also been <br /> clouded on the plans.A brief description of the revisions made to this building follows below <br /> 15200 52nd Avenue South,Suite 300,Seattle,Washington 98188 <br /> Phone 206.766.8300 <br /> www.johnsonbraund.com <br /> ARCHITECTURE INTERIOR DESIGN <br />
The URL can be used to link to this page
Your browser does not support the video tag.