My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3618 W MUKILTEO BLVD SITE WORK FOR HARBORS EDGE TOWNHOMES 2025-10-27
>
Address Records
>
W MUKILTEO BLVD
>
3618
>
SITE WORK FOR HARBORS EDGE TOWNHOMES
>
3618 W MUKILTEO BLVD SITE WORK FOR HARBORS EDGE TOWNHOMES 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 11:03:45 AM
Creation date
6/17/2025 11:22:43 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3618
Tenant Name
SITE WORK FOR HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
572
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAGE HOMES NORTHWEST, LLC <br />HARBORS EDGE DRAINAGE REPORT <br />AUGUST 2022 <br />8.6 ELEMENT 6 - PROTECT SLOPES <br />The slopes will be protected with temporary and permanent seeding, plastic covering, or other <br />methods for stabilizing soils. <br />8.7 ELEMENT 7 - PROTECT DRAIN INLETS <br />Catch basin inlet protection devices will be placed in all nearby catch basins. These will be identified <br />in the TESC plan of the final engineering drawings. <br />8.8 ELEMENT 8 - STABILIZE CHANNELS AND OUTLETS <br />All temporary channels proposed for the project shall be stabilized with rock or vegetation if signs of <br />erosion are observed by the project's erosion/sediment control lead. <br />8.9 ELEMENT 9 - CONTROL POLLUTANTS <br />The project is relatively small and is not expected to store contaminants onsite for an extended <br />period of time. Any contaminants that are stored onsite should be protected from vandalism or theft. <br />Maintenance, fueling, and repair of construction equipment should be conducted offsite to the <br />greatest possible extent. A concrete washout area shall be provided to keep concrete wash -water <br />from entering the public storm drainage system. <br />8.10 ELEMENT 10 - CONTROL DE -WATERING <br />No significant dewatering is expected to be needed on this project. <br />8.11 ELEMENT 11- MAINTAIN BMPS <br />The project shall identify personnel to serve as an erosion/sediment control lead, who can monitor all <br />BMPs at the site and recommend revisions and new BMPs as needed. <br />8.12 ELEMENT 12 - MANAGE THE PROJECT <br />The project shall identify personnel to serve as an erosion/sediment control lead, who can monitor <br />site conditions, BMP performance, and recommend revisions as site conditions change. <br />8.13 ELEMENT 13 - PROTECT LOW -IMPACT DEVELOPMENT BMPS <br />This element is primarily intended to protect areas where infiltration -based BMPs from compaction <br />occur during construction activities. This is not applicable as there is no infiltration on this project. <br />9. WETLANDS PROTECTION <br />There is a wetland on the south side of the project that will be filled in. This wetland appears to be a seep <br />wetland that doesn't store any volume. See Appendix F for elevations around the wetland. As the figure <br />in Appendix F shows, the wetland doesn't appear to store in runoff, therefore no additional dead storage <br />was provided. See the Critical Areas Report for details. <br />�PACG / PAGE 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.