My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5010 DOVER ST 2025-07-31
>
Address Records
>
DOVER ST
>
5010
>
5010 DOVER ST 2025-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 11:34:53 AM
Creation date
6/18/2025 7:40:08 AM
Metadata
Fields
Template:
Address Document
Street Name
DOVER ST
Street Number
5010
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WoodWorks® Shearwalls 2352.wsw Feb. 20, 2023 13:29:46 <br /> HOLD-DOWN DESIGN(flexible wind design) <br /> Level 1 Tensile ASD <br /> Line- Location[ft] Load Holddown Force[Ibs] Cap Crit <br /> Wall Posit'n X Y Case Shear Dead Uplift Cmb'd Hold-down [Ibs] Resp. <br /> Line 1 <br /> ✓ Elem 0.00 -11.62 1 736 541 193 Refer to upper level <br /> 1-1 R Op 1 0.00 -3.87 1 6448 215 6233 HDU8-SDS2. 6765 0.92 <br /> 1-1 R End 0.00 -0.12 1 7185 486 6699 HDU8-SDS2. 6765 0.99 <br /> Line 2 <br /> ✓ Elem 24.50 -11.37 1 881 621 260 Refer to upper level <br /> 2-1 R Op 1 24.50 -3.87 1 6052 6052 HDU8-SDS2. 6765 0.89 <br /> 2-1 R End 24.50 -0.12 1 6933 621 6312 HDU8-SDS2. 6765 0.93 <br /> Line A <br /> A-1 L End 0.12 -11.50 1 428 330 98 HDU2-SDS2. 3075 0.03 <br /> ✓ Elem 8.62 -11.50 1 558 558 Refer to upper level <br /> A-1 L Op 1 10.88 -11.50 1 443 420 23 HDU2-SDS2. 3075 0.01 <br /> A-1 R Op 1 14.13 -11.50 1 421 405 16 HDU2-SDS2. 3075 0.01 <br /> ✓ Elem 19.38 -11.50 1 558 558 Refer to upper level <br /> A-1 R End 24.38 -11.50 1 406 315 91 HDU2-SDS2. 3075 0.03 <br /> Line B <br /> B-1 L End 0.12 0.00 1 1538 120 1418 HDU2-SDS2. 3075 0.46 <br /> B-1 L Op 1 3.88 0.00 1 804 615 189 HDU2-SDS2. 3075 0.06 <br /> B-1 R Op 1 20.63 0.00 1 1039 615 424 HDU2-SDS2. 3075 0.14 <br /> B-1 R End 24.38 0.00 1 1772 120 1652 HDU2-SDS2. 3075 0.54 <br /> Level 2 Tensile ASD <br /> Line- Location[ft] Load Holddown Force[Ibs] Cap Crit <br /> Wall Posit'n X Y Case Shear Dead Uplift Cmb'd Hold-down [Ibs] Resp. <br /> Line 1 <br /> 1-1 L End 0.00 -11.37 1 135 <br /> 1-1 R End 0.00 -9.12 1 135 <br /> 1-2 L End 0.00 -8.87 1 1133 486 647 HD1J2-SDS2. 3075 0.21 <br /> 1-2 R End 0.00 -01.12 1 1133 486 647 HDU2-SDS2. 3075 0.21 <br /> Line 2 <br /> 2-1 L End 24.50 -11.37 1 881 621 260 HDU2-SDS2. 3075 0.08 <br /> 2-1 R End 24.50 -0.12 1 881 621 260 HDU2-SDS2. 3075 0.08 <br /> Line A <br /> A-2 L End 8.62 -11.50 1 558 558 HD`J2-SDS2. 3075 0.18 <br /> A-2 R End 19.38 -11.50 1 558 558 HDU2-SDS2. 3075 0.18 <br /> Line B <br /> B-i R Op 1 4.13 0.00 1 864 864 HDU2-SDS2. 3075 0.28 <br /> B-1 L Op 2 8.38 0.00 1 864 864 HDU2-SDS2. 3075 0.28 <br /> B-1 R Op 2 20.63 0.00 1 422 422 HDU2-SDS2. 3075 0.14 <br /> B-1 R End 24.38 0.00 1 422 422 HDU2-SDS2. 3075 0.14 <br /> Legend: <br /> Line-Wall: <br /> At wall or opening-Shearline and wall number At vertical element-Shearline <br /> Posit'n-Position of stud that hold-down is attached to: <br /> V Elem-Vertical element:column or strengthened studs required where not at wall end or opening <br /> L or R End-At left or right wall end <br /> L or R Op n- At left or right side of opening n <br /> t @ Op n- Uplift force t at opening n from offset opening in perforated wall above,from SDPWS 4.3.6.2.1 <br /> Location-Co-ordinates in Plan View <br /> Load Case-Results are for critical load case: <br /> ASCE 7 All Heights:Case 1 or 2 from Fig.27.3-8 <br /> ASCE 7 Low-rise:Windward corner(s)and Case A or B from Fig.28.3-1 <br /> ASCE 7 Minimum loads(27.1.5/28.3.4) <br /> Hold-down Forces: <br /> Shear-Wind shear overturning component,based on shearline force,factored for ASD by a 60.For perforated walls, T from SDPWS 4.3-8 is used. <br /> Dead-Dead load resisting component,factored for ASD by 0.60 <br /> Uplift-Uplift wind load component,factored for ASD by 0.60.For perforated walls,T from SDPWS 4.3-8 is used. <br /> Cmb'd-Sum of ASD-factored overturning,dead and uplift forces.May also include the uplift force t from perforated walls from SDPWS 4.3.6.2.1 when <br /> openings are staggered. <br /> Hold-down-Device used from hold-down database <br /> Cap-Allowable ASD tension load <br /> Crit.Resp.-Critical Response=Combined ASD force/Allowable ASD tension load <br /> Notes: <br /> Refer to Shear Results table for factor Co,and shearline dimensions table for the sum of Li,used to calculate tension force T for perforated walls from <br /> SDPWS Eqn.4.3-8. <br /> Designer is responsible for design of connection from wall to floor or foundation for shear force shown in Shear Results table.Refer to SDPWS 4.3.6.4.3 for <br /> foundation anchor bolt requirements. <br /> 13 <br /> Page 38 of 63 <br />
The URL can be used to link to this page
Your browser does not support the video tag.