My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5010 DOVER ST 2025-07-31
>
Address Records
>
DOVER ST
>
5010
>
5010 DOVER ST 2025-07-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/31/2025 11:34:53 AM
Creation date
6/18/2025 7:40:08 AM
Metadata
Fields
Template:
Address Document
Street Name
DOVER ST
Street Number
5010
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Drew Martin <br />From: Drew Martin <br />Sent: Friday, June 16, 2023 9:08 AM <br />To: AFABELLA@SPIRITSOFTWARE.BIZ <br />Subject: City of Everett Permit Services: 5010 Dover Street (B2204-003) - Second Building Review <br />Hello, Anne. <br />We are contacting you as it appears that the design team for this project has changed, including the applicant. Please <br />contact our Permit Desk to review the contact information for this project as needed. <br />We have completed the second review of the building plans for this project. This email will serve as the review <br />letter. The comments below should be addressed. Two revised full-sized hard -copies of the drawings should be <br />submitted for review. An itemized response letter stating how each comment has been addressed should be included <br />with the drawing. Additional revised documentation, including but not limited structural calculations and other <br />supporting documentation, should be submitted as required. <br />Comments <br />General: <br />1. The submitted documents appear intended to completely replace the previously submitted documents. The <br />new documents are incomplete, including but not limited to insufficient architectural drawings (i.e., only one <br />sheet provided) and no structural drawings. Complete drawings and calculations for the new design should be <br />submitted for review. The documents provided by the previous design team are not consistent with the new <br />design and cannot be collated with documents prepared by the new design team. Additional comments may be <br />issued pending review of the complete submittal documents. <br />Architectural: <br />The architectural and structural drawings are not consistent. Based on mark-ups by the designer on Sheet A3, it <br />appears that the structural drawings provide the more accurate proposed design. The drawings should be <br />coordinated for consistency. See IRC Section R106.1.1. <br />Structural: <br />The structural design appears to be engineered per IRC Section R401.1.3. Structural calculations should be <br />submitted substantiating the design. The calculations should include all parts of the structure, including but not <br />limited to the foundations, shear walls and holdowns, and gravity framing. See IBC Sections 1604.1 and 1604.4, <br />and additional comments below. <br />4. The continuous foundations appear to have reduced in size versus the original design. The foundation design <br />should verify the bearing pressures, including combinations with seismic loading. In addition, the foundation <br />design should specify the minimum required embedment depth, which should not be less than the greater of <br />that required by the geotechnical report for the site conditions or the 18 inch frost depth. <br />The Main Floor beam on the west side supports a discontinuous shear wall. The beam is required to be design <br />for load combinations with seismic forces increased by overstrength. See IBC Section 1613.1 and ASCE 7-16 <br />Section 12.3.3.3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.