My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewportC@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />Civil Plans <br />T3 <br />1. Please add the following missing Specs to this sheet: "CNH... <br />Detector Cable", "CN H ... Detector Loop Wire", "CNH... Induction <br />Loops". <br />2 <br />Civil Plans <br />A-1 <br />1. Please make the information shown on the A series sheets <br />corroborate with the pole shop drawings, and the work being <br />done on the ILand TS sheets. Comments 2-8 explicitly deal with <br />making sure no conflicting information is being shown in <br />different sheet series. <br />2. There is no existing power vault at the bottom of the north leg <br />crossing curb ramp. Please remove the callout saying there is an <br />existing power vault at the bottom of the north leg crossing curb <br />ramp. <br />3. There is a callout showing a new AT&T vault at the bottom of <br />the north leg crossing curb ramp. Vaults and/or junction boxes <br />are not allowed in any part of a curb ramp. Please relocate this <br />vault to be away from the north leg crossing curb ramp and also <br />away from the traffic signal loops which are shown on the TS <br />sheets. <br />4. There appears to be 3 new vaults or junction boxes shown on <br />this sheet, 2 of which have no callouts. Please explain the <br />purpose of these vaults or junction boxes on this sheet. <br />5. There appears to be 3 new vaults or junction boxes shown on <br />this sheet, 2 of which have no callouts. Please show these vaults <br />or junctions boxes on sheets IL1 and TS1 to ensure there are no <br />conflicts in this work area. <br />6. Please add a note that vaults called out in these sheets shall <br />have non-skid lids and meet ADA gap acceptance requirements <br />called out on sheet T3. <br />7. Please show all of the work being done on the IL and TS sheets <br />on this sheet including but not limited to the service cabinet <br />being installed as well as the conduit runs into the existing signal <br />junction boxes, and the traffic signal loops to ensure there are <br />no conflicts in this work area. <br />Page 2 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.