Laserfiche WebLink
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewportC@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />1 <br />Civil Plans <br />T3 <br />1. Please add the following missing Specs to this sheet: "CNH... <br />Detector Cable", "CN H ... Detector Loop Wire", "CNH... Induction <br />Loops". <br />2 <br />Civil Plans <br />A-1 <br />1. Please make the information shown on the A series sheets <br />corroborate with the pole shop drawings, and the work being <br />done on the ILand TS sheets. Comments 2-8 explicitly deal with <br />making sure no conflicting information is being shown in <br />different sheet series. <br />2. There is no existing power vault at the bottom of the north leg <br />crossing curb ramp. Please remove the callout saying there is an <br />existing power vault at the bottom of the north leg crossing curb <br />ramp. <br />3. There is a callout showing a new AT&T vault at the bottom of <br />the north leg crossing curb ramp. Vaults and/or junction boxes <br />are not allowed in any part of a curb ramp. Please relocate this <br />vault to be away from the north leg crossing curb ramp and also <br />away from the traffic signal loops which are shown on the TS <br />sheets. <br />4. There appears to be 3 new vaults or junction boxes shown on <br />this sheet, 2 of which have no callouts. Please explain the <br />purpose of these vaults or junction boxes on this sheet. <br />5. There appears to be 3 new vaults or junction boxes shown on <br />this sheet, 2 of which have no callouts. Please show these vaults <br />or junctions boxes on sheets IL1 and TS1 to ensure there are no <br />conflicts in this work area. <br />6. Please add a note that vaults called out in these sheets shall <br />have non-skid lids and meet ADA gap acceptance requirements <br />called out on sheet T3. <br />7. Please show all of the work being done on the IL and TS sheets <br />on this sheet including but not limited to the service cabinet <br />being installed as well as the conduit runs into the existing signal <br />junction boxes, and the traffic signal loops to ensure there are <br />no conflicts in this work area. <br />Page 2 of 10 <br />