My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4030 COLBY AVE 2025-07-18
>
Address Records
>
COLBY AVE
>
4030
>
4030 COLBY AVE 2025-07-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2025 3:59:43 PM
Creation date
6/18/2025 9:22:44 AM
Metadata
Fields
Template:
Address Document
Street Name
COLBY AVE
Street Number
4030
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Traffic Engineering Reviewer. All questions shall be routed through this project's <br />Public Works Reviewer Thad Newport with City of Everett Permit Services (TNewportC@everettwa.gov). <br /># <br />Document <br />Sht/Pg <br />Reviewer's Comment <br />Designer's Response <br />Initials <br />6. Please show all of the work being done on the IL and TS sheets <br />on this sheet including but not limited to the service cabinet <br />being installed as well as the conduit runs into the existing signal <br />junction boxes, and the traffic signal loops to ensure there are <br />no conflicts in this work area. <br />7. Please remove the information about the proposed 22x12x12 <br />junction COE junction boxes and show the information that is on <br />the IL1 and TS1 on this sheet to properly show the tie ins to the <br />COE illumination system. <br />8. Please show the existing pole being removed with its <br />foundation being removed entirely and conduits cut off 24" <br />below grade. <br />9. Please show the new pole being installed in line with the old <br />pole but approximately 5-10' to the north to clear the existing <br />foundation and to move the new small cell pole further away <br />from our existing COE signal pole and equipment. <br />10. Please add a callout to the existing illumination run heading <br />north saying "(E) Direct -Buried Wire (Approximate Location, <br />Contractor to field verify)" <br />4 <br />A-3 <br />1. Please make the information shown on the A series sheets <br />corroborate with the pole shop drawings, and the work being <br />done on the IL and TS sheets. Comments 2-5 explicitly deal with <br />making sure no conflicting information is being shown in <br />different sheet series. <br />2. The existing pole has a 30' luminaire mounting height as <br />shown on this sheet, however the Valmont pole shop drawing is <br />calling for a luminaire mounting height of 35'. Please submit <br />complete Valmont pole and luminaire arm shop drawings for a <br />pole with 30 mounting height. <br />3. There is cabinet enclosure information (festoon box) shown <br />on these sheets as well as the RF series sheets that are not <br />shown in the Valmont pole and luminaire shop drawings. Please <br />Page 4 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.