My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />o Site inspections and monitoring will be conducted in accordance with Special <br />Condition S4 of the CSWGP. Sampling locations are indicated on the Site Map in <br />the consent decree documents, Appendix C. Sampling station(s) are located in <br />accordance with applicable requirements of the CSWGP and the Consent <br />Decree. <br />• Maintain an updated SWPPP. <br />o The SWPPP will be updated, maintained, and implemented in accordance with <br />Special Conditions S3, S4, and S9 of the CSWGP. <br />As site work progresses the SWPPP will be modified routinely to reflect changing site <br />conditions. The SWPPP will be reviewed monthly to ensure the content is current. <br />Table 5 — Management <br />x <br />Design the project to fit the existing topography, soils, and drainage patterns <br />x <br />Emphasize erosion control rather than sediment control <br />x <br />Minimize the extent and duration of the area exposed <br />x <br />Keep runoff velocities low <br />x <br />Retain sediment on -site <br />x <br />Thoroughly monitor site and maintain all ESC measures <br />x <br />Schedule major earthwork during the dry season <br />x <br />Other (please describe) <br />Clearing, grading, and other soil disturbing activities shall only be permitted if shown to the <br />satisfaction of Ecology that silt -laden runoff shall be prevented from leaving the site through a <br />combination of the following: <br />• Site conditions including existing vegetative coverage, slope, soil type, and proximity to <br />receiving waters; <br />• Limitations on activities and the extent of disturbed areas; and <br />• Proposed erosion and sediment control measures. <br />Based on the information provided and/or local weather conditions, Ecology may expand or <br />restrict the seasonal limitation on site disturbance. <br />The following activities are exempt from the seasonal clearing and grading limitations: <br />• Routine maintenance and necessary repair of erosion and sediment control BMPs; <br />• Routine maintenance of public facilities or existing utility structures that do not expose <br />the soil or result in the removal of the vegetative cover to soil; and <br />• Activities where there is 100 percent infiltration of surface water runoff within the site in <br />approved and installed erosion and sediment control facilities. <br />Inspection and Monitoring <br />• BMPs shall be monitored, maintained, and repaired as needed to continue performance <br />of their intended function. Site inspections shall be conducted by a person who is <br />knowledgeable in the principles and practices of erosion and sediment control. This <br />person has the necessary skills to: <br />o Assess the site conditions and construction activities that could impact the quality <br />of storm water, and <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />F <br />1 <br />it l <br />u <br />1 <br />1 <br />C] <br />1 <br />C! <br />F, <br />16 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.