Laserfiche WebLink
1 <br />. Any quarry spalls that are loosened from the pad, which end up on the roadway <br />shall be removed immediately. <br />. If vehicles are entering or exiting the site at points other than the construction <br />entrance(s), fencing (see BMP C103) shall be installed to control traffic. <br />• Upon project completion and site stabilization, all construction accesses intended <br />as permanent access for maintenance shall be permanently stabilized. <br />2014 Stormwater Management Manual for Westem Washington <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />I <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />[J <br />1 <br />Volume 11 - Chapter 4 - Page 272 <br />1 <br />