Laserfiche WebLink
0 <br />VERETT <br />Permit Inspections <br />City of Everett <br />10/25/2019 <br />10/25/2019 <br />PW 05-SEWER <br />RANDY ALLEN <br />APPROVAL <br />connection to existing <br />MAIN INSTALL <br />Notes: <br />11/6/2019 <br />11/6/2019 <br />PW 05-SEWER <br />RANDY ALLEN <br />PARTIAL <br />based on Perteet & HWA reports <br />MAIN INSTALL <br />APPROVAL <br />Notes: <br />11/14/2019 <br />11/14/2019 <br />PW 05-SEWER <br />RANDY ALLEN <br />PARTIAL <br />based on Perteet & HWA reports <br />MAIN INSTALL <br />APPROVAL <br />Notes: <br />11/22/2019 <br />11/22/2019 <br />PW 05-SEWER <br />RANDY ALLEN <br />PARTIAL <br />from MH D to MH C <br />MAIN INSTALL <br />APPROVAL <br />Notes: <br />12/3/2019 Any <br />12/3/2019 <br />PW 05-SEWER <br />RANDY ALLEN <br />PARTIAL <br />eTRAKiT Inspection Request <br />MAIN INSTALL <br />APPROVAL <br />Notes: <br />11/26/2019 12:20 PM RIVERFRONT COMMRCL INVEST LLC <br />We will be preforming the HDPE pipe leak test on tuesday 12/3. <br />Contact Name: RIVERFRONT COMMRCL INVEST LLC <br />Site Address: 3800 Riverfront Blvd. <br />Phone:4252136779 <br />e-Mail: Dave.fiala@shelterholdings.com <br />11/26/2019 7:36 AM RIVERFRONT COMMRCL INVEST LLC <br />We are planning on doing the Air test for the Sewer HDPE pipe for the south end sewer run. 11/27 <br />Contact Name: Dave Fiala <br />Site Address: 3800 Riverfront Blvd. <br />Phone:4252136779 <br />e-Mail: Dave.fiala@shelterholdings.com <br />(Canceled - eTRAKiT - 11/26/2019 12:18:41 PM) <br />(12/3/2019 3:09 PM RDA) <br />Low air pressure test four psi for five minutes with no loss is ok, acceptance of sewer main is dependent upon TV Cameron of the pipes <br />12/5/2019 <br />12/5/2019 <br />PW 22-OTHER <br />RANDY ALLEN <br />CORRECTION <br />Sediment Control <br />REQUIRED <br />Notes: <br />12/4/2019 12:22 PM RIVERFRONT COMMRCL INVEST LLC <br />Starting LFG collector pipe install. afternoon inspection <br />Contact Name: Dave Fiala <br />Site Address: 11624 Se 5th St, Suite 210 <br />Phone:4252136779 <br />e-Mail: Dave.fiala@shelterholdings.com <br />(12/5/2019 3:15 PM RDA) <br />Subject to Hera inspection <br />(12/26/2019 3:23 PM RDA) <br />Contractor must install construction entrances Per City of Everett standard detail 201 which they are to be 100 ft long ea. at the north and south <br />entrances <br />�A_ <br />Printed: Thursday, 17 April, 2025 2 of 23 rk <br />SUPERION <br />