My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />BMP C124: Sodding <br />Purpose <br />The purpose of sodding is to establish permanent turf for immediate erosion protection <br />and to stabilize drainage ways where concentrated overland flow will occur. <br />Conditions of Use <br />Sodding may be used in the following areas: <br />. Disturbed areas that require short-term or long-term cover. <br />. Disturbed areas that require immediate vegetative cover. <br />. All waterways that require vegetative lining. Waterways may also be seeded rather <br />than sodded, and protected with a net or blanket. <br />Design and Installation Specifications <br />Sod shall be free of weeds, of uniform thickness (approximately 1-inch thick), and shall <br />have a dense root mat for mechanical strength. <br />The following steps are recommended for sod installation: <br />• Shape and smooth the surface to final grade in accordance with the approved grad- <br />ing plan. The swale needs to be overexcavated 4 to 6 inches below design elev- <br />ation to allow room for placing soil amendment and sod. <br />. Amend 4 inches (minimum) of compost into the top 8 inches of the soil if the <br />organic content of the soil is less than ten percent or the permeability is less than <br />0.6 inches per hour. See hftp://www.ecy.wa.gov/programs/swfa/organics/soil.html <br />for further information. <br />. Fertilize according to the supplier's recommendations. <br />. Work lime and fertilizer 1 to 2 inches into the soil, and smooth the surface. <br />. Lay strips of sod beginning at the lowest area to be sodded and perpendicular to <br />the direction of water flow. Wedge strips securely into place. Square the ends of <br />each strip to provide for a close, tight fit. Stagger joints at least 12 inches. Staple on <br />slopes steeper than 3H:1V. Staple the upstream edge of each sod strip. <br />. Roll the sodded area and irrigate. <br />. When sodding is carried out in alternating strips or other patterns, seed the areas <br />between the sod immediately after sodding. <br />2014 Stormwater Management Manual for Westem Washington <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Volume 11 - Chapter 4 - Page 296 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.