My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />discharge through the chemically enhanced sand filtration system. <br />• System discharge rates must take into account downstream conveyance integrity <br />Polymer Batch Treatment Process Description: <br />A batch chemical treatment system consists of the stormwater collection system (either <br />temporary diversion or the permanent site drainage system), a storage pond, pumps, a <br />chemical feed system, treatment cells, and interconnecting piping. <br />The batch treatment system shall use a minimum of two lined treatment cells in addition <br />to an untreated stormwater storage pond. Multiple treatment cells allow for clarification of <br />treated water while other cells are being filled or emptied. Treatment cells may be ponds <br />or tanks. Ponds with constructed earthen embankments greater than six feet high or <br />which impound more than 10 acre-feet require special engineering analyses. The Eco- <br />logy Dam Safety Section has specific design criteria for dams in Washington State (see <br />http://www.ecy.wa.gov/programs/wr/dams/GuidanceDocs.html). <br />Stormwater is collected at interception point(s) on the site and is diverted by gravity or by <br />pumping to an untreated stormwater storage pond or other untreated stormwater holding <br />area. The stormwater is stored until treatment occurs. It is important that the holding pond <br />be large enough to provide adequate storage. <br />The first step in the treatment sequence is to check the pH of the stormwater in the <br />untreated stormwater storage pond. The pH is adjusted by the application of carbon diox- <br />ide or a base until the stormwater in the storage pond is within the desired pH range, 6.5 <br />to 8.5. When used, carbon dioxide is added immediately downstream of the transfer <br />pump. Typically sodium bicarbonate (baking soda) is used as a base, although other <br />bases may be used. When needed, base is added directly to the untreated stormwater <br />storage pond. The stormwater is recirculated with the treatment pump to provide mixing <br />in the storage pond. Initial pH adjustments should be based on daily bench tests. Further <br />pH adjustments can be made at any point in the process. <br />Once the stormwater is within the desired pH range (dependant on polymer being used), <br />the stormwater is pumped from the untreated stormwater storage pond to a treatment cell <br />as polymer is added. The polymer is added upstream of the pump to facilitate rapid mix- <br />ing. <br />After polymer addition, the water is kept in a lined treatment cell for clarification of the <br />sediment -floc. In a batch mode process, clarification typically takes from 30 minutes to <br />several hours. Prior to discharge samples are withdrawn for analysis of pH, flocculent <br />chemical concentration, and turbidity. If both are acceptable, the treated water is dis- <br />charged. <br />Several configurations have been developed to withdraw treated water from the treat- <br />ment cell. The original configuration is a device that withdraws the treated water from <br />just beneath the water surface using a float with adjustable struts that prevent the float <br />2014 Stormwater Management Manual for Western Washington <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Volume // - Chapter 4 - Page 398 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.