My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3800 RIVERFRONT BLVD 2025-07-23
>
Address Records
>
RIVERFRONT BLVD
>
3800
>
3800 RIVERFRONT BLVD 2025-07-23
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2025 3:49:01 PM
Creation date
6/18/2025 10:18:28 AM
Metadata
Fields
Template:
Address Document
Street Name
RIVERFRONT BLVD
Street Number
3800
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />sized using a hydraulic loading rate between 6-8 gpm/ft2.Other hydraulic loading rates <br />may be more appropriate for other systems. Bypass should be provided around the <br />chemical treatment system to accommodate extreme storms. Runoff volume shall be cal- <br />culated using the methods presented in Chapter III-2 - Hydrologic Analysis (p.429). <br />Worst -case land cover conditions (i.e., producing the most runoff) should be used for ana- <br />lyses (in most cases, this would be the land cover conditions just prior to final land- <br />scaping). <br />Sizing Criteria for Flow Control Water Bodies: <br />Sites that must implement flow control for the developed site condition must also control <br />stormwater release rates during construction. Construction site stormwater discharges <br />shall not exceed the discharge durations of the pre -developed condition for the range of <br />pre -developed discharge rates from '/2 of the 2-year flow through the 10-year flow as pre- <br />dicted by an approved continuous runoff model. The pre -developed condition to be <br />matched shall be the land cover condition immediately prior to the development project. <br />This restriction on release rates can affect the size of the storage pond and treatment <br />cells. <br />The following is how WWHM can be used to determine the release rates from the chem- <br />ical treatment systems: <br />1. Determine the pre -developed flow durations to be matched by entering the existing <br />land use area under the "Pre -developed" scenario in WWHM. The default flow <br />range is from'/2 of the 2-year flow through the 10-year flow. <br />2. Enter the post developed land use area in the "Developed Unmitigated" scenario <br />in WWHM. <br />3. Copy the land use information from the "Developed Unmitigated" to "Developed Mit- <br />igated" scenario. <br />4. While in the "Developed Mitigated" scenario, add a pond element under the basin <br />element containing the post -developed land use areas. This pond element rep- <br />resents information on the available untreated stormwater storage and discharge <br />from the chemical treatment system. In cases where the discharge from the chem- <br />ical treatment system is controlled by a pump, a stage/storage/discharge (SSD) <br />table representing the pond must be generated outside WWHM and imported into <br />WWHM. WWHM can route the runoff from the post -developed condition through <br />this SSD table (the pond) and determine compliance with the flow duration stand- <br />ard. This would be an iterative design procedure where if the initial SSD table <br />proved to be inadequate, the designer would have to modify the SSD table outside <br />WWHM and re -import in WWHM and route the runoff through it again. The iteration <br />will continue until a pond that complies with the flow duration standard is correctly <br />sized. <br />2014 Stormwater Management Manual for Western Washington <br />Volume // - Chapter 4 - Page 401 <br />
The URL can be used to link to this page
Your browser does not support the video tag.