Laserfiche WebLink
1 <br />Concrete Batch Plant Disposal <br />• Only permitted facilities may accept high pH water. <br />Facility should be contacted before treatment to ensure they can accept the high <br />pH water. <br />Stormwater Discharge <br />Any pH treatment options that generate treated water that must be discharged off site are <br />subject to flow control requirements. Sites that must implement flow control for the <br />developed site must also control stormwater release rates during construction. All <br />treated stormwater must go through a flow control facility before being released to sur- <br />face waters which require flow control. <br />1 <br />1 <br />1 <br />17 <br />1 <br />1 <br />1 <br />1 <br />I <br />1 <br />2014 Stormwater Management Manual for Westem Washington <br />Volume 11 - Chapter 4 - Page 413 <br />t# <br />