Laserfiche WebLink
1 <br />rI <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />i <br />Consent Decree Exhibit C <br />• Stormwater will be collected for conveyance off -site for discharge. Where <br />conveyance of subdrainage from landscaped areas to the stormwater system is <br />impracticable, release of subdrainage to the subsurface will be accepted, as long as <br />the gas collection system is not compromised by such drainage. <br />• Stormwater conveyance piping located on the Site is required to have leak -tight <br />joints in order to minimize infiltration of stormwater into subsurface soils and reduce <br />leachate generation. <br />• Restrictions against infiltration of collected stormwater into Site subsurface soils are <br />included to minimize leachate generation. Condensate drained from landfill gas <br />collection piping will be discharged to the leachate collection system. Where <br />impracticable to pipe this liquid directly to the leachate collection system, condensate <br />will be allowed to drain into subsurface soils for eventual collection in the leachate <br />collection system. <br />• A one-time sampling of the shallow aquifer will be performed to determine if there are <br />zones where shallow aquifer quality has the potential to cause an exceedance of <br />cleanup levels at the point of compliance in the deep aquifer if migration from the <br />shallow to deep aquifer were to occur. Based on the results of this study, zones of <br />the Site may have restrictions on the type of piling (deep foundations) that future <br />development may use. Augercast piling will be required where it is shown that <br />penetration of the aquitard could potentially result in deep aquifer cleanup level <br />exceedances. <br />• Institutional controls are required preventing groundwater withdrawal other than for <br />leachate collection or monitoring. <br />• Compliance monitoring and contingency plan commitments are required. Initiation of <br />compliance monitoring is required before pile installation can commence. <br />Direct Contact Pathway: <br />• Development areas are required to provide cover of subsurface soils. Covers will <br />include a minimum of 2 feet of clean soil, pavements, building slabs or a combination <br />of these. <br />• Clean backfill, meeting current WSDOT/APWA Specification #9-03.12(3) or <br />equivalent, in utility corridors with geotextile separation from existing materials is <br />required to prevent contact with landfilled materials during maintenance activities. <br />• Security fencing (locked gates, adequate height, etc.) and signage is required to <br />prevent public access to undeveloped portions of the Site. <br />• Institutional controls are required to govern maintenance of developed area covers, <br />and compliance with health and safety requirements for penetrations of that cover. <br />• Institutional controls prohibiting private residential ground -level ownership of landfill <br />property are required. <br />• Construction methods to contain risk of direct contact to landfilled materials and site <br />groundwater within construction zones are required. They include: <br />* Dust and odor controls <br />* Erosion and surface water controls <br />FINAL - March 2001 <br />6-3 Everett Landfill Tire Fire Site <br />Cleanup Action Plan <br />1 <br />